Lucid to expand Arizona production plant in 2023

Lucid expects reservation holders of Lucid Air Dream Edition models will begin receiving their vehicles in late October, with customer deliveries ramping up thereafter. Grand Touring, Touring, and Air Pure model deliveries are expected to follow. Lucid has thus far received more than 13,000 reservations for Lucid Air and increased the planned total production quantity of the Dream Edition to 520 vehicles.

Lucid Motors (NASDAQ: LCID) is planning to expand its AMP-1 production facility in Casa Grande, Arizona, with construction starting in 2023, documents show.

Lucid is set to begin construction on the third phase of its AMP-1 production plant sometime in 2023, with the project extending into 2024 and “possibly into 2025,” Teslarati learned.

Lucid’s current construction processes and discussions regarding Phase 3 are generalized in Casa Grande documents:

“Construction of the Phase 2 Lucid building is still underway and will be well into FY23. Additionally, Lucid is discussing starting work on future phases associated with the build-out of their development on Lot 1 of the Lucid Final Plat. This additional construction is likely to start in FY23 and run into FY24 and possibly into FY25.”

The Phase 3 expansion will not only build new buildings but will also increase the size of existing facilities, which will help support the company’s hopes of boosting production to 400,000 units every year. It will also add a Customer Experience Center, increasing foot traffic to Lucid’s production plant.

Lucid is preparing for an increase in vehicle traffic at the Casa Grande factory. Not only will an increase in vehicle production add more haulers to the local roadways, but the addition of a Customer Experience Center will add visiting vehicles to the property. Due to this, The City of Casa Grande is investing nearly $7 million to expand and improve roadways near the site, including Thornton Rd. from Peters Rd. to Selma Highway:

“The city is financially responsible for all aspects of the project, including payment to the EMW JV in the amount of $6,913,116.56 upon completion of their work. There is also included a project contingency amount of $315,247.44 for unforeseen conditions.  Total Guaranteed Maximum Price Stage 2 (GMP 2) for Thornton Road – Selma Highway to Peters Road is $7,228,364.00.”

Lucid and the City of Casa Grande will expand roadways near the automaker’s AMP-1 facility. “Roadway construction improvements to Thornton Road are being conducted to increase the capacity of the road to facilitate the development of Lucid Motors and to assist in the safety and mobility of the traveling public in and around the area.” (Credit: Google Maps)

Currently, Lucid’s Phase 2 expansion is still underway. This expansion project, known as Phase 2, started in 2021 and is still being completed. It will not be finished until “well into 2023,” according to the documents seen by Teslarati.

In late 2020, we initially reported on the start of the Phase 2 expansion, which included the construction or modification of several facilities:

  • Body in White Expansion
  • Stamping Plant
  • General Assembly
  • Powertrain Plant
  • General Warehousing
  • Several Supporting and Auxiliary Structures

The Phase 2 expansion of the AMP-1 facility will supplement Lucid’s continuously-growing order bank, while Phase 3 will support new building construction and existing building expansion. The company has struggled to keep production lines rolling due to “extraordinary supply chain and logistics challenges,” it said during its recent Q2 Earnings Call. The automaker also slashed production output projections for the year by 50 percent, only expecting to build between 6,000 and 7,000 units in 2022.

I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.

Joey Klender: Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his time at TESLARATI, Joey has broken several big stories, including the first images of the Tesla Model S Plaid, the imminent release of the 4680 Model Y through EPA certification, and several expansions to the Lucid AMP-1 factory in Arizona, to name a few. His stories have been featured in several publications, including Yahoo! Finance, Fox News, CNET, and Seeking Alpha. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on Twitter @KlenderJoey.
Related Post
Disqus Comments Loading...