Tesla Giga Berlin is coming together quickly thanks to prefabricated construction

Tesla's Giga Berlin facility is beginning to take shape. (Credit: @gigafactory_4 on Twitter)

Tesla’s Giga Berlin production facility will come together at record speed thanks to a pre-fabrication construction method that the company is using.

Company CEO Elon Musk detailed the process that construction crews are using to build Tesla’s first European production facility quickly.

“Giga Berlin will come together at an impossible-seeming speed,” Musk said on Twitter. “The prefabricated construction method in Germany is extremely impressive.”

Prefabricated construction is an efficient method of building structures. Large portions of a structure are assembled at a manufacturing site. After they are created, they are transported to a construction job site and installed into the appropriate area.

This morning on the Giga Berlin site, several prefabricated elements of the facility arrived via train.

Prefabricated portions of the building arrived on site via train. (Credit: @Gf4Tesla on Twitter)

Reinforced concrete beams and walls that will become apart of some of the main structures of the facility were installed into the ground. Giga Berlin’s buildings are beginning to take shape in an accelerated fashion thanks to the prefabricated method that the company is using.

Tesla’s Giga Berlin facility is beginning to take shape. (Credit: @gigafactory_4 on Twitter)

Tesla began the project in early January 2020 by excavating the property and removing the low-quality trees that were used for commercial cardboard production. The progress on the site has encountered roadblocks since January, but Tesla has continued to move swiftly in the pursuit of erecting the German facility.

Most recently, foundational work was installed into the ground for the Drive Unit facility and Paint Shop. Also, fire protection equipment was introduced into the facility’s paint shop, which will offer new, world-class quality colors for vehicles manufactured in Berlin.

As of now, Tesla plans to begin producing its all-electric vehicles in Berlin in July 2021. The company has indicated that the Model Y will be the first car produced in the facility. Still, other models will follow after the first few production runs of the all-electric crossover are completed.

Tesla plans to hire 10,500 employees who will work at the facility. Not only will Giga Berlin manufacture electric cars, but there will also be a battery production facility on the property when the company has the proper team. During the company’s Q2 2020 Earnings Call, Elon Musk and VP of Powertrain and Energy Engineering Drew Baglino indicated that the bottleneck of battery production at the German plant comes down to lack of talent and high employee turnover.

Joey Klender: Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his time at TESLARATI, Joey has broken several big stories, including the first images of the Tesla Model S Plaid, the imminent release of the 4680 Model Y through EPA certification, and several expansions to the Lucid AMP-1 factory in Arizona, to name a few. His stories have been featured in several publications, including Yahoo! Finance, Fox News, CNET, and Seeking Alpha. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on Twitter @KlenderJoey.
Related Post
Disqus Comments Loading...