Connect with us

SpaceX

SpaceX’s first orbital Starship begins assembly as steel heat shield passes tests

CEO Elon Musk posted a video of SpaceX engineers testing a small section of a Starship heat shield prototype. (Elon Musk/SpaceX)

Published

on

SpaceX CEO Elon Musk says that the company’s South Texas workforce has already begun to fabricate the first orbital-class Starship prototype, while Hawthorne engineers and technicians are in the midst of performing small-scale testing of the vehicle’s unprecedented stainless steel heat shield.

To be assembled out of hexagonal tiles of (presumably) stainless steel, Starship’s metallic heat shield will be one of the most crucial aspects of the orbital spacecraft, particularly with respect to ensuring that it’s extraordinarily easy to reuse. To survive extreme interplanetary-velocity reentry conditions at Mars, Earth, and beyond and remain in a functional, flight-ready condition after landing, SpaceX will need to implement the world’s first orbital-class, large-scale metallic heat shield with an immature technology known as transpirational cooling.

By quite literally drilling tiny holes (pores) into heat shield plates at the hottest parts of Starship’s hull, transpirational cooling effectively allows a large portion of the heat of reentry to be wicked away by the flash evaporation of a liquid, typically water. For SpaceX’s Starship, it’s likely that the coolant of choice would be either liquid water or liquid methane, the former of which offers better cooling per unit of mass at the cost of added plumbing complexity and spaceship mass, while the latter would make use of the same propellant fueling the ship at the cost of worse cooling per unit of mass. Either way, SpaceX will be heading into unproven territory, demanding extensive ground and flight testing to first ensure that the concept is truly viable and then to verify that it can be made as reliable and reusable as it simply has to be.

Tests like those shown on March 17th by Musk indicate that SpaceX is indeed deep into the process of extensive and often destructive testing, something the company has proven to be exceptionally good at. It’s unclear if the above test of Starship’s hexagonal heat shield tiles – likely made out of a variant of 300-series stainless steel – involved tiles with active or passive cooling, but Musk suggested that the hot-spots created with spin-forming torches reached temperatures as high as 1650 Kelvin (2500ºF/1400ºC. Unlike the ablative heat shields SpaceX is familiar with building and operating through its Crew and Cargo Dragon spacecraft, a stainless steel heat shield would be expected to almost entirely resist erosion (i.e. ablation) during extremely high-velocity reentries of at least 12-14 km/s (~31,000 mph, Mach 40+).

Meanwhile, Musk also confirmed that SpaceX has decided to skip constructing a replacement nosecone/fairing for Starhopper, a functional Starship prototype that will be used to conduct extremely short hop tests like Falcon 9’s development-era Grasshopper and F9R test articles. Over the last several weeks, SpaceX technicians have been rapidly assembling what was initially assumed to be the replacement fairing Musk had previously suggested would be built. Instead, the duo of stainless steel barrel sections – relying on steel much thinner than the heavy-duty stuff used to build Starhopper – are apparently the beginnings of the first orbital-class Starship prototype, said by Musk to be aiming for flight-readiness as early as June 2019 around two months ago.

While still an extraordinarily ambitious target for a vehicle that has yet to conduct any integrated hops or flight-tests in any form, the fact that SpaceX is began the process of building the first orbital Starship in late February could actually give the company’s engineers and technicians a fighting chance to complete Starhopper testing and Starship assembly over the next 90-100 days.

If stacked atop each other, the two new steel sections in work would likely stretch a solid 20-30 meters (65-100 ft) tall. Meanwhile, the first orbital-grade tank domes and/or conical nose section is also in the process of being welded together out of smaller segments, already fast approaching something ready to be installed inside the steel barrel sections.

Advertisement

Check out Teslarati’s Marketplace! We offer Tesla accessories, including for the Tesla Cybertruck and Tesla Model 3.

Eric Ralph is Teslarati's senior spaceflight reporter and has been covering the industry in some capacity for almost half a decade, largely spurred in 2016 by a trip to Mexico to watch Elon Musk reveal SpaceX's plans for Mars in person. Aside from spreading interest and excitement about spaceflight far and wide, his primary goal is to cover humanity's ongoing efforts to expand beyond Earth to the Moon, Mars, and elsewhere.

Advertisement
Comments

Elon Musk

SpaceX to launch military missile tracking satellites through new Space Force contract

SpaceX wins a $178.5M Space Force contract to launch missile tracking satellites starting in 2027.

Published

on

By

Space Force officials say the Falcon 9 booster pictured here in SpaceX's rocket factory will have to wait a few months longer for its launch debut. (SpaceX)

The U.S. Space Force awarded SpaceX a $178.5 million task order on April 1, 2026 to launch missile tracking satellites for the Space Development Agency. The contract, designated SDA-4, covers two Falcon 9 launches beginning in Q3 2027, one from Cape Canaveral Space Force Station in Florida and one from Vandenberg Space Force Base in California. The satellites, built by Sierra Space, are designed to bolster the nation’s ability to detect and track missile threats from orbit.

The award falls under the National Security Space Launch Phase 3 Lane 1 program, which Space Force uses to move payloads to orbit on faster timelines and at more competitive prices. “Our Lane 1 contract affords us the flexibility to deliver satellites for our customers, like SDA, more easily and faster than ever before to all the orbits our satellites need to reach,” said Col. Matt Flahive, SSC’s system program director for Launch Acquisition, in the official press release.

SpaceX is quietly becoming the U.S. Military’s only reliable rocket

The SDA-4 contract is the latest in a long string of national security wins for SpaceX. As Teslarati reported last month, the Space Force recently shifted a GPS III satellite launch from ULA’s Vulcan rocket to SpaceX’s Falcon 9 after a significant Vulcan booster anomaly grounded ULA’s military missions indefinitely. That move made it four consecutive GPS III satellites transferred to SpaceX after contracts were originally awarded to its competitor.

This didn’t come without a fight and dates back years. SpaceX originally had to sue the Air Force in 2014 for the right to compete for national security launches, at a time when United Launch Alliance held a near monopoly on the market. Since then, the company has steadily displaced ULA as the dominant provider, and last year the Space Force confirmed SpaceX would handle approximately 60 percent of all Phase 3 launches through 2032, worth close to $6 billion.

With missile defense satellites now part of its launch manifest alongside GPS, communications, and reconnaissance payloads, SpaceX is giving hungry investors something to chew on before its imminent IPO.

Continue Reading

Elon Musk

SpaceX files confidentially for IPO that will rewrite the record books

SpaceX files confidentially for a record-breaking IPO targeting a $1.75T valuation and $80B raise, driven by Starlink growth and its xAI merger.

Published

on

By

Elon Musk’s rocket and satellite company submitted its draft registration to the U.S. Securities and Exchange Commission today for an initial public offering, targeting June at a $1.75 trillion valuation. This would be the largest in history.

SpaceX has filed confidentially with the SEC, first reported by Bloomberg. SpaceX would be valued above every S&P 500 company except Nvidia, Apple, Alphabet, Microsoft, and Amazon.

The filing uses a confidential process that allows companies to work through SEC disclosures privately before initiating a public roadshow. With a June target, official details through a formal prospectus is expected to go public in April or early May, after which SpaceX must wait at least 15 days before beginning investor marketing.

SpaceX IPO is coming, CEO Elon Musk confirms

While SpaceX is best known for its Falcon 9 and Starship rockets, the $1.75 trillion valuation is anchored by Starlink, its satellite internet service. Starlink ended 2025 with 9.2 million subscribers and over $10 billion in revenue, which is a figure analysts project could reach a staggering $24 billion by the end of 2026. A February all-stock merger with xAI, Musk’s artificial intelligence venture, further boosted the valuation.

SpaceX officially acquires xAI, merging rockets with AI expertise

Bank of America, Goldman Sachs, JPMorgan Chase, and Morgan Stanley are lined up as senior underwriters. SpaceX is also considering a dual-class share structure to preserve insider voting control, and plans to allocate up to 30% of shares to retail investors, which is roughly three times the typical norm.

Continue Reading

Elon Musk

Countdown: America is going back to the Moon and SpaceX holds the key to what comes after

NASA’s Artemis II launches Wednesday, sending humans near the Moon for the first time since 1972.

Published

on

By

For the first time since Apollo 17 touched down on the lunar surface in December 1972, the United States is sending humans back toward the Moon. NASA’s Artemis II mission is set to launch as early as this week from Kennedy Space Center in Florida, carrying four astronauts on a 10-day journey around the Moon and back to Earth. It will not land anyone on the surface this time, but it is the first crewed flight in over half a century to travel beyond low Earth orbit, and it sets the stage for Elon Musk’s SpaceX missions to follow.

The mission uses NASA’s Space Launch System rocket and the Orion spacecraft, which will fly around the Moon before splashing down in the Pacific Ocean around April 10. For context, an uncrewed Artemis I flew the same path in 2022, proving the hardware worked. Artemis II now tests it with people aboard.

According to NASA’s official countdown blog, launch preparations are on track with an 80 percent chance of favorable weather. “Hey, let’s go to the moon!” Commander Wiseman told reporters upon arriving at Kennedy Space Center.

Source: NASA

Beyond Artemis II lies the lander question, and that is where SpaceX enters directly. In 2021, NASA awarded SpaceX a $2.89 billion contract to develop the Starship Human Landing System, a modified version of Starship designed to ferry astronauts from lunar orbit to the surface. The original plan called for SpaceX to deliver that lander for Artemis III, which was to be the first crewed lunar landing. Timing for Starship development, however, caused NASA to restructure the mission sequence entirely.

Before SpaceX’s Starship Human Landing System (HLS) can put anyone on the Moon, it has to solve a problem no rocket has demonstrated at scale, which is refueling in orbit. Because the Starship HLS requires approximately ten tanker launches worth of propellant loaded into a depot in low Earth orbit before it has enough fuel to reach the lunar surface, SpaceX plans to conduct this refueling process using its upgraded V3 Starship. And until that demonstration flies and succeeds, the Starship moon lander remains a question mark.

SpaceX’s Starship V3 is almost ready and it will change space travel forever

In February 2026, NASA Administrator Jared Isaacman confirmed that Artemis III, now planned for mid-2027, and will instead test lunar landers in low Earth orbit, with the actual landing pushed to Artemis IV that’s targeted for 2028.

Musk responded to earlier criticism of SpaceX’s schedule by posting on X that his company is “moving like lightning compared to the rest of the space industry,” and added that “Starship will end up doing the whole Moon mission.” The contract competition was also reopened in October 2025 by then NASA chief Sean Duffy, who cited Starship’s delays and said the agency needed speed given China’s own stated goal of landing astronauts on the Moon by 2030.


Artemis came from the first Trump administration’s 2017 Space Policy Directive 1, which directed NASA to return humans to the Moon. The program picked up pace through the 2020s, with the Orion spacecraft and SLS taking years to develop at enormous costs. SpaceX entered the picture in 2021 as the chosen lander contractor, tying the commercial space sector into what had historically been an all government undertaking.

Whether SpaceX’s Starship ultimately carries astronauts to the lunar surface or shares that role with Blue Origin’s competing lander, this week’s Artemis II launch is the necessary first step. Getting four humans to the Moon’s vicinity and back safely is the proof of concept everything else depends on.

Continue Reading