Connect with us

News

Sierra Space’s Dream Chaser space plane to be moved to Florida ahead of launch

Dream Chaser Tenacity undergoing testing (Credit Sierra Space)

Published

on

Sierra Space recently completed testing of Dream Chaser ‘Tenacity’ at NASA’s Neil Armstrong Test Facility in Sandusky, Ohio.

The space plane will be launched atop United Launch Alliance’s Vulcan rocket and will carry cargo to the International Space Station, finished an intense amount of testing that included facing extreme temperatures and shock testing.

Advertisement

Dream Chaser was put through many tests to ensure it could survive the trip to space and a lengthy stay in orbit at the Space Station.

The first test saw the space plane, along with its additional cargo attachment ‘Shooting Star’, connected to the Vulcan Centaur stage separation mechanism for a shock test, followed by being placed on the most powerful spacecraft shaker table in the world. This testing took place over 5 weeks as teams replicated the conditions the space plane would see during launch on Vulcan. They also conducted the same testing but replicated the separation of the cargo attachment from Dream Chaser before de-orbiting.

After that round of testing, the space plane was moved into a thermal vacuum chamber which can cycle temperatures from -150F to +250F (-101C to +121C), the same temperatures it would see while in space.

With this testing complete, Sierra Space will transport Dream Chaser Tenacity to NASA’s Kennedy Space Center for its last round of testing before being attached to ULA’s Vulcan rocket. Sierra Space and ULA are hoping to launch in 2024 if final testing flows smoothly and the Vulcan rocket is ready.

Sierra Space is also currently working on its next Dream Chaser, Reverence, which will also be used to transport cargo to the ISS.

Questions or comments? Shoot me an email at rangle@teslarati.com, or Tweet me @RDAnglePhoto.

Advertisement

Launch journalist, specializing in launch photography. Based on the Space Coast, a short drive from Cape Canaveral and the SpaceX launch pads.

Advertisement
Comments

Elon Musk

Tesla Cybercab coming next to Giga Berlin, Optimus possibly after

“From a next major product standpoint, I think most likely is the Tesla Cybercab,” Musk said.

Published

on

Credit: Cybercab

Tesla could add the Cybercab and Optimus humanoid robot to the production lineup at Giga Berlin, as per recent comments from CEO Elon Musk. 

During a recent interview with Giga Berlin plant manager André Thierig, Musk identified the Cybercab as the most likely next major product for the German factory, with Optimus potentially following after.

“From a next major product standpoint, I think most likely is the Tesla Cybercab,” Musk said. He added that there are also “possibilities of Tesla Optimus” being produced in the facility.

Tesla has already begun production of the Cybercab in Giga Texas, with volume production expected to ramp this year. Based on Musk’s comments, it appears that if conditions align in Europe, Giga Berlin could eventually join that effort.

Advertisement

The CEO’s comments about Optimus coming to Gigafactory Berlin are quite unsurprising too considering that Musk has mentioned in the past that the humanoid robot will likely be Tesla’s highest volume product in the long run. 

Giga Berlin will likely be able to produce mass volumes of Optimus, as the Model S and Model X lines being converted to an Optimus line in the Fremont Factory are already expected to produce 1 million units of the humanoid robot annually. 

Apart from his comments about the Cybercab and Optimus, Elon Musk also confirmed that Giga Berlin has started ramping battery cell production and will continue expanding Model Y output, particularly as supervised Full Self-Driving (FSD) gains regulatory approvals in Europe.

Taken together, the remarks suggest Berlin’s role could evolve beyond vehicle assembly into a broader multi-product manufacturing hub, not just a regional Model Y plant.

Advertisement
Continue Reading

Energy

Tesla Powerwall distribution expands in Australia

Inventory is expected to arrive in late February and official sales are expected to start mid-March 2026.

Published

on

Credit: Tesla

Supply Partners Group has secured a distribution agreement for the Tesla Powerwall in Australia, with inventory expected to arrive in late February and official sales beginning in mid-March 2026.

Under the new agreement, Supply Partners will distribute Tesla Powerwall units and related accessories across its national footprint, as noted in an ecogeneration report. The company said the addition strengthens its position as a distributor focused on premium, established brands.

“We are proud to officially welcome Tesla Powerwall into the Supply Partners portfolio,” Lliam Ricketts, Co-Founder and Director of Innovation at Supply Partners Group, stated.

“Tesla sets a high bar, and we’ve worked hard to earn the opportunity to represent a brand that customers actively ask for. This partnership reflects the strength of our logistics, technical services and customer experience, and it’s a win for installers who want premium options they can trust.”

Advertisement

Supply Partners noted that initial Tesla Powerwall stock will be warehoused locally before full commercial rollout in March. The distributor stated that the timing aligns with renewed growth momentum for the Powerwall, supported by competitive installer pricing, consumer rebates, and continued product and software updates.

“Powerwall is already a category-defining product, and what’s ahead makes it even more compelling,” Ricketts stated. “As pricing sharpens and capability expands, we see a clear runway for installers to confidently spec Powerwall for premium residential installs, backed by Supply Partners’ national distribution footprint and service model.”

Supply Partners noted that a joint go-to-market launch is planned, including Tesla-led training for its sales and technical teams to support installers during the home battery system’s domestic rollout.

Continue Reading

Elon Musk

Tesla Giga Berlin growth could stall if not “free from external influences”: Elon Musk

The comments were delivered in a pre-recorded video discussion.

Published

on

Credit: Andre Thierig/X

Tesla CEO Elon Musk has reportedly warned that future expansion of Gigafactory Berlin could be jeopardized if the site does not remain “free from external influences.”

Musk’s comments were delivered in a pre-recorded video discussion with employees and came at a sensitive moment for the facility, where union representation has been a recurring issue.

According to reports from Handelsblatt and Der Spiegel, citing participants at the event, Musk suggested that if Giga Berlin is no longer “free from external influences,” further expansion would become unlikely. He did not, however, hint that the plant would shut down.

While Musk did not name IG Metall directly, his remarks were widely interpreted as referencing the union, which is currently the largest faction on the works council but does not hold a majority, as noted in an electrive report. 

Advertisement

The video conversation was conducted between Musk in Austin and Grünheide plant manager André Thierig, then played back to the workforce in Germany. Works council elections are scheduled for early March, heightening the tension between management and organized labor.

The CEO has previously voiced concerns that stronger union influence could limit Tesla’s operational flexibility and long-term strategy in Germany.

Despite the warning on expansion, Musk praised the Giga Berlin site during the same address, describing it as one of the most advanced factories worldwide and highlighting its cleanliness and team culture.

The discussion also reportedly touched on battery cell production. According to attendees cited in German media, Musk indicated that Tesla has begun ramping cell production at the site. That would mark a notable shift from earlier expectations that large-scale cell manufacturing in Brandenburg would not begin until 2027.

Advertisement
Continue Reading