Connect with us

News

Tesla Cybertrucks Supercharging and crash testing point to imminent release

Credit: havefunworkhard on TikTok

Published

on

Tesla Cybertrucks are Supercharging in numbers at Giga Texas. A few units were spotted using the automaker’s electric vehicle chargers at the factory yesterday as the Cybertruck nears deliveries.

Earlier this month, a single Cybertruck was spotted at Giga Texas, using the factory’s Supercharger piles located on the property. It was the first instance of a Cybertruck being seen plugged into a Supercharger and gave us an additional look at the frunk of the vehicle, as an insert was spotted in the bed of the truck.

Tesla Cybertruck charging outside Gigafactory Texas shows interesting frunk detail

However, Cybertruck Supercharging is becoming a more popular occurrence at the Texas factory.

Advertisement

A new video from outside the walls of Tesla’s Austin-based production plant shows three units sitting plugged into Supercharger stalls.

Tesla could be performing simple analyses on the Cybertruck to determine its charging performance and could be checking to make sure everything internally with the pickup is normal, as these early units could be the first to make their way to customers.

Advertisement

We have been seeing an increase in sightings of Cybertrucks over the past few months. However, within the last few days, these sightings have become more interesting as nine Cybertruck units arrived at the Fremont Factory in Northern California yesterday.

Additionally, two crash-tested Cybertrucks were spotted in Northern California yesterday. Tesla operates its own crash testing facility within the Fremont property, but TRC California is also nearby, which is a facility commonly used by OEMs for crash testing.

Advertisement

Several days ago, Cybertruck units were also spotted heading northbound on I-55 in Missouri.

Interestingly, the National Highway Traffic Safety Administration (NHTSA) operates a crash testing facility in Ohio, which operates under the same TRC acronym (Transportation Research Center) as the California facility.

Advertisement

One of the three routes Google Maps selected would take the Cybertrucks up I-55 to get to TRC Ohio.

giga texas to trc ohio

Credit: Google Maps

Perhaps crash testing is imminent for the Cybertruck, which would make it available for sale as long as the EPA has granted the all-electric pickup a certificate of conformity for operation on public roads.

The NHTSA and TRC have not yet responded to our inquiries for comment regarding potential crash testing for the Cybertruck.

I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.

Advertisement

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

News

Tesla is using vehicle microphones to improve build quality: here’s how

Published

on

Credit: Tesla

Tesla is using the vehicles’ internal microphones to improve build quality, Vice President of Engineering Lars Moravy revealed recently.

It’s no secret that Tesla is always finding ways to make its manufacturing operations more efficient, accurate, and valuable. Constantly trying to make its cars better, the company has never placed any restrictions on what it will do to improve everything from panel gaps to paint.

As Teslas have been driving autonomously on the property of the Gigafactory Texas plant for a while now, Moravy revealed to Herbert Ong in a new interview that cars rolling off production lines now autonomously navigate themselves through a bumps, squeaks, and rattles (BSR) portion of the line. This helps to identify any loose or improperly installed internal parts.

The cabin’s microphones, which are used for a variety of things in ownership, simultaneously monitor any noises inside the vehicle while it rolls through the BSR portion of the production line. Moravy actually revealed that Tesla is trying to build “Full Self-Hearing,” an AI system that will detect minor imperfections so they can be corrected before delivery.

Advertisement

It’s no secret that build quality is something that Tesla struggled with as it scaled to a fully massive production operation that manufactures over 1.6 million vehicles per year. However, in recent years, especially, there have not been as many complaints. Tesla has truly improved upon its build quality and paint quality over the past several years, especially in the U.S.

Tesla’s ‘megacasts’ are key to massive build quality improvements

While those improvements have been evident, there are still some complaints; no automaker is perfect with this. But this step will now ensure that every single car that rolls off the production lines at Gigafactory Texas will be void of any creaks, squeaks, or squeals when it leaves the factory.

This measure is one of the most unique we’ve seen in terms of a strategy to avoid build quality issues, but it is not exclusive to Tesla.

Advertisement

Ford uses acoustic analysis AI to find abnormalities in seat motors, climate control units, and other components. Suppliers and OEMs will also use microphone arrays or particle velocity sensors in end-of-line stations.

The full interview with Lars Moravy is available below:

Advertisement
Continue Reading

Investor's Corner

Tesla crushes Wall Street expectations, beats delivery estimates by over 15 percent

Published

on

Tesla (NASDAQ: TSLA) beat Wall Street expectations of 406,000 vehicles delivered in Q2 by reporting 480,126 deliveries for the three months ending in June.

Tesla reported it delivered 467,762  Model 3 and Model Y units, while 12,364 Model S, Model X, and Cybertrucks switched hands during the quarter. The Model S and Model X were officially sunset this past quarter and will no longer be part of the company’s Production & Delivery reports moving forward.

The quarter is a pleasant surprise and a good rebound from Q1, when Tesla slightly missed the Wall Street consensus of 365,645 cars by reporting 358,023 deliveries for the first three motnhs of the year.

Energy storage deployments also provided some strength in Tesla’s delivery report, hitting 13.5 GWh for Q2. This is a particular division of Tesla’s business that has been overwhelmingly robust over the past few years, truly being a strong point of the company’s overall model.

Advertisement

For the year, Tesla analysts still predict deliveries to trend in the 1.69 million unit region, a modest 3 to 5 percent increase from the 1.64 million cars the company delivered last year. Tesla will likely return to more sequential and noticeable year-over-year growth as the Cybercab project starts to ramp up considerably in the next few years.

Tesla has some other potential catalysts to spur vehicle deliveries, too. Not only is it expecting Cybercab to truly start making a change in the next few years, but other vehicles could be entering the company’s lineup.

Tesla sends production Cybercab with no steering wheel, pedals to on-road testing

The slightly longer Model Y L has been a highly speculated release candidate in the U.S. It has already done incredibly well in China, and U.S. buyers have been wanting slightly more interior space than the Model Y. Now that the Model X is gone, it is more needed than ever.

Advertisement

Q2 highlights a pretty stable automotive division within Tesla, and no true concerns arise from these figures, especially considering it managed to beat expectations convincingly.

Continue Reading

Elon Musk

Tesla Optimus project fires up as Musk sees production line progress

Published

on

Credit: Elon Musk | X

Tesla CEO Elon Musk posted a photo of himself standing with the Optimus production team inside Tesla’s Fremont factory, arms crossed amid workers in hard hats and safety vests. The image captures a pivotal industrial shift: the same facility space once dedicated to building Tesla’s flagship Model S sedan and Model X SUV is now home to the company’s humanoid robot manufacturing line.

Tesla’s Fremont Factory, acquired in 2010 from the former NUMMI joint venture between Toyota and GM, has been the company’s original U.S. manufacturing hub since Model S production began in 2012.

Advertisement

The Model X followed soon thereafter. These premium vehicles offered lower annual volumes, recently around 30,000 combined, compared to the high-volume Model 3 and Model Y lines that continue around the site. Over their combined run, the S and X accounted for roughly 610,000 units.

In late January 2026, during Tesla’s Q4 2025 earnings call, Elon Musk announced the end of Model S and Model X production in Q2 2026. The final vehicles rolled off the line in early May. Rather than retooling for another vehicle, Tesla chose to convert the dedicated S/X assembly area into a dedicated Optimus Gen 3 production line.

Model 3 and Y manufacturing remains unaffected. Tesla’s official Fremont Factory page now lists Optimus alongside the 3 and Y as core products.

The conversion was executed with remarkable speed. After production stopped, crews dismantled the existing vehicle line and installed entirely new modular equipment—including lines sourced from Germany and dozens of sub-lines for actuators, batteries, and other components—in roughly four months.

Advertisement

Musk described the timeline as “insanely fast,” noting it would be unprecedented for any other manufacturer. Initial Optimus output is expected to ramp slowly due to the robot’s roughly 10,000 unique parts and the brand-new production processes involved. The Fremont line targets an eventual capacity of 1 million Optimus units per year.

Tesla isn’t joking about building Optimus at an industrial scale: Here we go

Optimus Development Timeline

  • August 19, 2021: Optimus (then called Tesla Bot) formally announced at Tesla’s first AI Day. A concept video showed a person in a suit demonstrating the vision for a general-purpose humanoid capable of dangerous, repetitive, or boring tasks using the same AI architecture as Full Self-Driving.
  • 2022: Early prototypes displayed. At the second AI Day in September, semi-functional units demonstrated walking across a stage and basic arm movements
  • 2023: September videos showed improved capabilities, including sorting colored blocks, precise limb awareness, and holding a Yoda pose.
  • 2024-early 2025: Factory integration videos showed Optimus navigating workspaces and handling objects like battery cells.
  • January 2026: Gen 3 mass-production activities began at Fremont, with reports of over 1,000 Gen 3 units already operating inside the factory for real-world learning and AI training
  • April 2026: Musk confirms Optimus production on converted Fremont line would begin in late July or August 2026. The Gen 3 reveal, originally eyed for Q1, was pushed closer to production start. A second, much larger Optimus factory at Giga Texas is under construction, with volume production targeted for Summer 2027 and long-term capacity of 10 million units annually
  • July 1, 2026: Musk’s on-site visit and team photo confirm the Optimus line is operational and the transition is actively progressing

Tesla positions Optimus as potentially its largest project ever, leveraging vertical integration, AI expertise, and car-like manufacturing know-how to scale humanoid robots first for its own factories and later for broader industrial and consumer use.

The Fremont conversion serves as a critical proving ground for this ambitious new chapter in Tesla’s already-rich history.

Advertisement
Continue Reading