Connect with us

Lifestyle

Tesla’s ‘Plaid Powertrain’ could be game over for the Taycan before it’s begun

A Tesla Model S prototype at the Nurburgring. (Credit: TALEA Media/YouTube)

Published

on

Now that Tesla CEO Elon Musk and the company’s research and development team have revealed the existence of upcoming ‘Plaid Powertrain’ variants, a few more questions about their recently-announced competition come to mind. Will the Porsche Taycan’s engineering achievements be overshadowed before they’ve even been enjoyed by future customers? Will Taycan reservation holders decide to wait for Tesla’s newest Model S to come out before making their Porsche purchase?

Musk’s latest play to stop the competition looks like it may just be as effective as he’s hoping it will be. Brian from the YouTube channel i1Tesla summed the move up nicely in a message to Porsche: “Your car’s not even out yet, and Tesla’s diminishing what you’re going to be doing…With powertrain technology and battery technology…Tesla is so superior.” Brian further opined that what the Taycan has ultimately achieved is along the lines of what Tesla did with the Model S in 2012, or perhaps a step above it. The Plaid system then becomes an achievement that renders the question of whether the Taycan is a ‘Tesla killer’ completely moot.

Tesla Model S with development ‘Plaid’ powertrain sets Laguna Seca track record for 4-door sedan (Credit: Tesla)

As its flagship electric car, Porsche considers the Taycan is one of its most important vehicles since the 911. It’s priced in the same bracket as the iconic sports car, around $150,000, and claims a battery range in the neighborhood of 240 miles per charge with a 100 kWh battery pack. A current Model S Performance, which now includes Ludicrous Mode and Autopilot as a standard offering, has about 100 additional miles of range than the Taycan’s ratings and has a price tag around $50,000 less. Perhaps there are significant differences in the driving experience of both cars and the customers they are designed to appeal to have differences as well, but on paper there’s definitely a nod to Tesla’s current Model S. Once the new Roadster is on the market, of course, an entirely different comparison will be on the table.

Although the upcoming “refreshed” Model S and X are arguably exciting enough to depress future Taycan sales, there’s the other question of whether or not the latest plaid-centered announcement will impact Tesla’s sales as well. Musk has said that the newer versions will be more expensive than current offerings, but it’s not clear that the additional cost would deter buyers from investing in the superior battery and powertrains that would come with them. New Model S and X sales could suffer as a result if customers take the ‘wait and see’ approach.

Musk cited this particular concern when it came to the Model Y. If customers stopped purchasing the Model 3 in favor of waiting for the Model Y, Tesla would majorly suffer as a result, especially considering the annual sales expectations for the all-electric crossover are estimated to be around 1 million units per year. This was probably why the Model Y unveiling event was notably subdued compared to other unveilings. However, it was likely important for Tesla’s long-term investment worth to show the progress being made towards a vehicle that is hoped to be a game changer in the electric vehicle market (and greater auto market overall) despite this risk.

Advertisement

Obviously, the results of the so-called battle between the Porsche Taycan and Tesla’s current and future Model S offerings remains to be seen. The first front looks like it will take place on the Nürburgring racetrack in Western Germany as Tesla attempts to beat the Taycan’s 7 minutes and 42 seconds track time using a Plaid prototype Model S (or other variants) with a roll cage and 7 seats. For the record, Brian at i1Tesla has put his bets on a Tesla time of 7 minutes and 38 seconds. Stay tuned!

Accidental computer geek, fascinated by most history and the multiplanetary future on its way. Quite keen on the democratization of space. | It's pronounced day-sha, but I answer to almost any variation thereof.

Advertisement
Comments

Elon Musk

NASA sends humans to the Moon for the first time since 1972 – Here’s what’s next

NASA’s Artemis II launched four astronauts toward the Moon on the first crewed lunar mission since 1972.

Published

on

By

NASA’s Space Launch System rocket launches carrying the Orion spacecraft with NASA astronauts Reid Wiseman, commander; Victor Glover, pilot; Christina Koch, mission specialist; and CSA (Canadian Space Agency) astronaut Jeremy Hansen, mission specialist on NASA’s Artemis II mission, Wednesday, April 1, 2026, from Operations and Support Building II at NASA’s Kennedy Space Center in Florida. NASA’s Artemis II mission will take Wiseman, Glover, Koch, and Hansen on a 10-day journey around the Moon and back aboard SLS rocket and Orion spacecraft launched at 6:35pm EDT from Launch Complex 39B. (NASA/Bill Ingalls)

NASA launched four astronauts toward the Moon on April 1, 2026, marking the first crewed lunar mission since Apollo 17 in December 1972. The Artemis II mission lifted off from Kennedy Space Center aboard the Space Launch System rocket at 6:35 p.m. EDT, sending commander Reid Wiseman, pilot Victor Glover, mission specialist Christina Koch, and Canadian astronaut Jeremy Hansen on a 10-day journey around the far side of the Moon and back.

The mission does not include a lunar landing. It is a test flight designed to validate the Orion spacecraft’s life support systems, navigation, and communications in deep space with a crew aboard for the first time. If the crew reaches the planned distance of 252,000 miles from Earth, they will set a new record for the farthest any human has ever traveled, surpassing even the Apollo 13 distance record.

Elon Musk pivots SpaceX plans to Moon base before Mars

As Teslarati reported, SpaceX holds a central role in what comes next. The Starship Human Landing System is under contract to carry astronauts to the lunar surface for Artemis IV, now targeting 2028, after NASA restructured its mission sequence due to delays in Starship’s orbital refueling demonstration. Before any Moon landing happens, SpaceX must prove it can transfer propellant between two Starships in orbit, something no rocket program has done at this scale.

The last time humans left Earth’s orbit was 53 years ago. Gene Cernan and Harrison Schmitt of Apollo 17 were the final people to walk on the Moon, a record that stands to this day. Elon Musk has long argued that returning is not optional. “It’s been now almost half a century since humans were last on the Moon,” Musk said. “That’s too long, we need to get back there and have a permanent base on the Moon.”

Advertisement

The Artemis program involves 60 countries signed onto the Artemis Accords, and this mission sets several firsts beyond distance. Glover becomes the first person of color to travel beyond low Earth orbit, Koch the first woman, and Hansen the first non-American astronaut to reach the Moon’s vicinity. According to NASA’s live mission updates, the spacecraft’s solar arrays deployed successfully after liftoff and the crew completed a proximity operations demonstration within the first hours of flight.

Artemis II is step one. The Moon landing and the permanent lunar base come later. But after more than five decades, humans are heading back.

Continue Reading

Elon Musk

Tesla Optimus Gen 3 is coming to the Tesla Diner with new ambitions

Tesla’s Optimus robot left the Hollywood Diner within months of opening. Now Musk is planning its return with a bigger role and a major Gen 3 upgrade underway.

Published

on

By

Tesla Optimus Gen 3 [Credit: Tesla]

Tesla’s Optimus robot was one of the most talked-about features when the Tesla Diner opened on Santa Monica Boulevard in Hollywood on July 21, 2025. Dubbed “Poptimus” by Tesla fans, the Gen 2 robot stood upstairs at the retro-futuristic, drive-in theater and Tesla Supercharging station, scooping popcorn into bags and handing them to guests with a wave.

The diner itself had been years in the making. Elon Musk first floated the idea in 2018 with a tweet about building an “old-school drive-in, roller skates & rock restaurant” at a Hollywood Supercharger. What eventually opened was a unique two-story neon-lit space, with 80 EV charging stalls, and Optimus serving as a live demonstration of where Tesla’s ambitions were headed.


But Optimus did not stay long, and was gone by December 2025.

Now, the robot is set to return with a more demanding job. Musk has ambitions for Optimus to take on a food runner role in 2026, delivering meals directly to cars at the Supercharger stalls. While the latest Gen 3 Optimus is likely to initially take on its previous popcorn-serving role, it wouldn’t be out of the question for Optimus to see a quick promotion. With improved  hand dexterity that features 50 total actuators and 22 degrees of freedom per hand, and significantly more powerful processing through Tesla’s latest AI5 chip that includes Grok-powered voice interaction, Musk described Optimus at the Abundance Summit on March 12, 2026, as “by far the most advanced robot in the world, Nothing’s even close.”

That confidence is backed by a major manufacturing shift. At the Q4 2025 earnings call in January, Musk announced Tesla would discontinue the Model S and Model X and convert those Fremont production lines to build Optimus. “It’s time to basically bring the Model S and X programs to an end,” he said, calling for a pivot that reflects where the Tesla’s future lies.

Continue Reading

Elon Musk

The Boring Company clears final Nashville hurdle: Music City loop is full speed ahead

The Boring Company has cleared its final Nashville hurdles, putting the Music City Loop on track for 2026.

Published

on

By

The Boring Company has cleared one of its most significant regulatory milestones yet, securing a key easement from the Music City Center in Nashville just days ago, the latest in a series of approvals that have pushed the Music City Loop project firmly into construction reality.

On March 24, 2026, the Convention Center Authority voted to grant The Boring Company access to an easement along the west side of the Music City Center property, allowing tunneling beneath the privately owned venue. The move follows a unanimous 7-0 vote by the Metro Nashville Airport Authority on February 18, and a joint state and federal approval from the Tennessee Department of Transportation and the Federal Highway Administration on February 25. Together, these green lights have cleared the path for a roughly 10-mile underground tunnel connecting downtown Nashville to Nashville International Airport, with potential extensions into midtown along West End Avenue.

Music City Loop could highlight The Boring Company’s real disruption

Nashville was selected by The Boring Company largely because of its rapid population growth and the strain that growth has placed on surface infrastructure. Traffic has become a persistent problem for residents, convention visitors, and airport travelers alike. The Music City Loop promises an approximately 8-minute underground transit time between downtown and the Nashville International Airport (BNA), removing thousands of vehicles from surface roads daily while operating as a fully electric, zero-emissions system at no cost to taxpayers.

Advertisement

The project fits squarely within a broader vision Musk has championed for years. In responding to a breakdown of the Loop’s construction costs, Musk posted on X: “Tunnels are so underrated.” The comment reflected a longstanding belief that underground transit represents one of the most cost-effective and scalable infrastructure solutions available. The Boring Company has claimed it can build 13 miles of twin tunnels in Nashville for between $240 million and $300 million total, a fraction of what comparable projects cost elsewhere in the country.

The Las Vegas Loop, The Boring Company’s first operational system, has served as a proof of concept. During the CONEXPO trade show in March 2026, the Vegas Loop transported approximately 82,000 passengers over five days at the Las Vegas Convention Center, demonstrating the system’s capacity during large-scale events. Nashville draws millions of convention visitors and tourists each year, and local business leaders have pointed to that same capacity as a major draw for supporting the project.

The Music City Loop was first announced in July 2025. Construction began within hours of the February 25 state approval, with The Boring Company’s Prufrock tunneling machine already in the ground the same evening. The first operational segment is targeted for late 2026, with the full route expected to be complete by 2029. The project represents one of the largest privately funded infrastructure efforts currently underway in the United States.

Continue Reading