Connect with us

News

Tesla gets courted by Brazil to establish a Gigafactory in the country

Tesla factory in Tilburg, Netherlands. (Credit: Tesla)

Published

on

Brazil’s Minister of Science, Technology, Innovations and Communications Marcos Pontes and Congressman Daniel Freitas are reportedly in early talks about the potential for a Tesla Gigafactory in Brazil.

Both Pontes and Freitas did not disclose what company they’re negotiating with, only they hinted that it is one of the most valuable automakers in the world today. The officials also noted that they are hoping the talks will eventually result in the company opening one of its facilities in the country by 2023, the Brazilian publication NSC Total first reported.

However, a Tweet posted on Thursday by Eduardo Bolsonaro, son to Brazil’s President and a lawmaker in the country, would later confirm that talks have taken place between Brazilian authorities and William Popp, charge d’affaires at the U.S. embassy in Brasilia, on the prospect of Tesla opening up a factory in South America’s largest country.

Bolsonaro’s tweet follows earlier reports that officials met on Feb. 12 to discuss the initial plans to help the federal government convince Tesla of the benefits of setting up shop in the country. The plan is to form a delegation that may include President Jair Bolsonaro to visit the Tesla headquarters in the United States.

Advertisement
-

The official entry plotted on the schedule of Minister of Science, Technology, Innovations and Communications reveals that Tesla’s Senior Staff Manufacturing Engineer Anderson Pacheco was present via video conference in the office of Pontes. Pachecho graduated with a Master of Science in Production Engineering from Brazil’s Universidade Federal de Santa Catarina. He has been with Tesla for over 4 years now and works both at the Fremont facility and Gigafactory 1 in Sparks, NV.

Details are limited as of reporting but the proponents may encourage Tesla to put its first Gigafactory in South America at Santa Catarina, a state in Southern Brazil and roughly 1.5 hours by plane from Rio De Janeiro.

Meanwhile, Freitas is the author of a bill that pushes for the exemption of electric vehicles from import tax. The said bill also proposes tax incentives for EVs or hybrid vehicles produced in Brazil.

If the talks of the Brazilian government and Tesla prospers and results in the building of Giga Brazil, it would be another step towards Tesla CEO Elon Musk’s goal of having Gigafactories in every continent.

Advertisement
-

Elon Musk also recently hinted that Tesla is considering a Giga Texas, which could be a perfect solution to ramp battery production or may even be the facility to help produce its upcoming all-electric Cybertruck.

Gigafactory Brazil also makes perfect sense as the country is considered a sleeping tech giant and is one of the countries of the future. With a Tesla strong foothold in Brazil, the distribution of Tesla vehicles in South America will be easier just like how the carmaker plans to do it in Asia with Giga Shanghai and in Europe with Giga Berlin.

A curious soul who keeps wondering how Elon Musk, Tesla, electric cars, and clean energy technologies will shape the future, or do we really need to escape to Mars.

Advertisement
Comments

News

SpaceX hid behind another name in the Arizona desert, and now it’s going big

SpaceX puts a $50 billion price on its Arizona supercompute campus ahead of December’s hearing.

Published

on

By

SpaceX has put a price tag on the supercomputer campus it wants to build in the southern Arizona desert. In a statement Thursday, the company said it is pursuing a roughly $50 billion supercompute campus in Cochise County, about 80 miles east of Tucson. Together with a separate facility planned at Starbase, Texas, the two projects add up to more than $74 billion in planned investment.

The Arizona figure had not been disclosed before. SpaceX’s involvement only became public on November 4, when company representatives hosted a packed town hall at Cochise Elementary School for an application filed under the name Tombstone Resources LLC. A SpaceX representative told residents the filing used another name because putting SpaceX on it “draws attention” from outside the county, local station KVOA reported.

The application describes a 747-acre site near the Willcox Playa with up to nine buildings of about 493,000 square feet each. SpaceX plans to bring the campus online in four phases of roughly 1.5 GW, reaching 6 GW at full build, backed by a 24 GWh battery system and about $3.6 billion in grid upgrades. At that size, it would draw about 2.5 times more power than every data center in Maricopa County combined, according to an Arizona Republic analysis.

SpaceX says the project will create about 5,500 construction jobs and 1,000 permanent jobs, and that it could cut electricity bills for members of the local cooperatives by up to 20 percent. The campus would use dry cooling with no industrial groundwater use. Its application estimates ongoing water needs of 7 to 10 acre-feet a year, roughly what 20 to 30 homes consume.

Power is the bigger question. The site sits next to the Apache Generating Station, a coal and natural gas plant with about 1 GW of capacity that had been slated to retire by 2028. SpaceX told residents its investment could expand the station to more than 6 GW.

Advertisement
-

Local opposition is organized. A petition asking the county to deny the permit has gathered about 2,400 signatures, and the nearby playa is a landing spot for federally protected sandhill cranes, which SpaceX says its design accounts for. The Cochise County Planning and Zoning Commission will hold a public hearing on December 9 in Bisbee, with written comments due November 27. If approved, construction could start in March 2027.

The Texas project faces a vote the same day. The Starbase City Commission will consider a property tax abatement for SpaceX’s $24 billion gas plant and supercompute facility at its own December 9 hearing, as Teslarati reported. SpaceX said Thursday the Starbase site has already generated more than 3,000 construction jobs, and it committed $220 million to Brownsville’s water and wastewater systems, $40 million of which has been paid.

Both campuses would expand a footprint still centered on the Memphis area, where SpaceX’s Colossus data centers run largely on gas turbines and the company won a permit for a power plant in Southaven, Mississippi earlier this year. SpaceX ended the third quarter with 1.7 GW of nameplate compute. The Arizona campus alone, at full build, would be more than three times that size.

Continue Reading

Elon Musk

Nvidia’s board meets on Jensen Huang, and Elon Musk already has an answer

Elon Musk says it would be an honor to hire Jensen Huang amid Nvidia turmoil.

Published

on

By

Elon Musk says he would welcome Jensen Huang at one of his companies if Nvidia’s board decides to push out its longtime chief executive.

On Wednesday evening, the financial account ZeroHedge posted “Elon please hire Jensen” on X. Musk replied roughly two hours later: “That would be an honor.” Neither Huang nor Nvidia had responded publicly as of Wednesday night.

Musk’s reply came as Nvidia’s board met to decide Huang’s future. The Wall Street Journal reported that directors were preparing to oust him following reports of two extramarital relationships. One involves Alice Huang, a Singapore-based businesswoman whom U.S. intelligence officials reportedly believe was working for China’s Ministry of State Security. The New York Times separately reported a relationship with Kimberly Powell, Nvidia’s vice president of health care. Huang acknowledged being unfaithful in a memo to employees on Sunday but gave no details.


Under Nvidia’s bylaws, a majority of its 11 directors can remove the CEO with or without cause. Bloomberg reported that the board has been working with an outside firm on possible replacements and may name an interim chief, with CFO Colette Kress seen as the likely pick. Nvidia shares fell more than 8 percent in extended trading, according to CNBC, and the company is scheduled to report quarterly earnings on November 17.

Musk has more riding on Nvidia’s leadership than most tech executives. In August, he told investors on SpaceX’s first earnings call as a public company that it would build its AI infrastructure exclusively on Nvidia hardware, calling Vera Rubin “the best architecture.” SpaceX is also working with Nvidia on the compute payload for Starmind, its planned orbital AI constellation. In October, SpaceX said it had a binding commitment for a roughly $40 billion lease of Vera Rubin GPUs and related equipment, with the leases expected to begin in the first half of 2027.

The scale of that dependence is already enormous. On its Q3 call, SpaceX said it was bringing roughly 200,000 to 220,000 Nvidia GB300 GPUs online each month and expects 2.5 to 3 GW of nameplate compute by the end of the year. That buildout is now reaching new sites like the proposed $24 billion power plant and supercomputer campus at Starbase.

The relationship between the two executives also goes back nearly a decade. Huang has often told the story of personally delivering Nvidia’s first DGX-1 AI supercomputer to Musk in 2016, when no other customer wanted one. “Nobody wanted to be part of it, except for Elon,” Huang said on the Joe Rogan Experience last December.

Musk did not say what role Huang might fill, and his reply stops short of a formal offer. Huang co-founded Nvidia in 1993 and still owns about 3.6 percent of its stock, so any move to a Musk company would depend on whether, and how, he leaves the chipmaker he has run for more than three decades.

Continue Reading

News

Starlink Mini 2 arrives with one feature for true off-grid connectivity

Published

on

Credit: SpaceX

SpaceX officially launched the Starlink Mini 2 on November 10, delivering the first portable Starlink terminal designed around independent power.

Invitation-only preorders for select U.S. customers are priced at $999 plus tax, a figure that includes a full year of Roam Unlimited service valued at roughly $2,100. A refundable $100 deposit reserves the kit, with the balance due at shipment, expected to begin in mid-December. Broader availability is listed as coming soon.

The headline feature is the quick-swap 71 Wh battery. Clipped to the rear of the dish without tools, it delivers up to 4.5 hours of connectivity on a single charge.

The 490-gram pack includes its own USB-C port and LED indicators, so users can charge a spare separately and swap it in seconds while staying online. Starlink notes that the terminal can continue operating while the battery charges or run directly from a 60 W USB-C source. The retail box includes one battery, a 60 W USB-C charger, and a 3-meter cable.

Beyond power, the Mini 2 is thinner at 23.1 mm (versus 38.5 mm on the original Mini) while measuring 263 × 314 mm. With the battery and kickstand attached it weighs 1.6 kg.

Built-in Wi-Fi 6 expands coverage to up to 1,800 square feet, an IP67 rating protects against dust and water, and a standard 1/4-20 tripod thread plus physical power button round out the design. Field of view remains 110 degrees, and the unit retains support for mobile use.

For travelers, campers, and remote workers, the swappable battery removes the longstanding requirement for an external power bank or vehicle outlet that defined the first Mini. Spare packs sold separately further extend runtime, turning the compact terminal into a more self-contained solution.

While the bundled $999 invitation price sits well above the original Mini’s current $149 starting point, the included year of service and genuine untethered operation mark a clear step forward in portable satellite internet.

Continue Reading