Connect with us

News

SpaceX Falcon 9 booster and first thrice-flown fairing return to port [photos]

SpaceX successfully returned two Falcon fairings halves and booster B1058 to Port Canaveral in just ~12 hours. (Richard Angle)

Published

on

In a period of just 12 hours last Friday, SpaceX successfully returned Falcon 9 booster B1058 and two payload fairing halves to Port Canaveral and a photographer-laden helicopter was airborne to capture it.

With its safe return to dry land, fairing recovery ship GO Ms. Tree’s bullseye catch of an already twice-flown fairing all but guarantees that the record-breaking payload fairing will have a chance to launch a fourth time in the near future. Meanwhile, Falcon 9 booster B1058 – the first US-built rocket to launch US astronauts since June 2011 – will soon be well on its way to its own fourth flight, likely for one of several dozen Starlink missions SpaceX aims to launch in the next ~15 months.

Aside from placing what CEO Elon Musk says is the last batch of satellites needed to kick off the Starlink internet network’s first public beta tests, the Starlink-12 mission was SpaceX’s 17th this year, leaving the company on track to beat its annual launch record by at least a small margin.

Falcon 9 booster B1058, drone ship OCISLY, and fairing catcher Ms. Tree return to Port Canaveral as Blue Origin and ULA launch pads stand watch in the background. (Richard Angle)

If SpaceX continues to follow its 2020 average of one Falcon 9 launch ever ~16.4 days, the company will likely end the year with 22 missions under its belt, narrowly beating the 21 launches it completed in 2018. If it follows its launch average – ~12.8 days per launch – from just the last four or so months, however, SpaceX could crush its record with some 24 or 25 launches this year. Given recent disruptions from reliably bad weather and a rare last-second launch abort, which trajectory SpaceX will follow over the next ~12 weeks is entirely up in the air.

Starlink-12 marks the thirteenth such launch for SpaceX, adding to the 12 flights pictured here. (SpaceX/Richard Angle)

Regardless of the outcome, though, reusability will have played a foundational role to a degree thus far unprecedented. Barring a major surprise, SpaceX will end 2020 having launched just five new Falcon 9 boosters – three of which will likely launch within the last two months of the year.

For fairing recovery and reuse, 2020 has been an even more groundbreaking, seeing SpaceX (seemingly) begin to find steadier footing with increasingly consistent fairing catches. Impressively, in the measly 11 months since SpaceX first reused a Falcon fairing, nearly a third of all launches and almost half of all Starlink missions have flown with one or two flight-proven halves. Recently, Musk even revealed that SpaceX intends for fairings and boosters to be capable of at least 10 launches each, confirming that Starlink-12’s now thrice-flown fairing half is no fluke.

Ms. Tree seemingly took a victory lap to welcome Falcon 9 B1058 home and celebrate a successful fairing catch. (Richard Angle)
SpaceX had to call off Ms. Chief’s catch attempt but still fished the half (right) out of the water. The left half has now made it through three orbital launches, two splashdowns, and one catch. (Richard Angle)

Drone ship Of Course I Still Love You’s (OCISLY) successful Starlink-12 booster recovery ended an agonizing three weeks of back and forth as SpaceX was tugged in a circle by ULA’s launch priority, technical difficulties, and stormy summer weather. Originally meant to recover Falcon 9 booster B1058 as early as mid-September, the launch slowly slipped its way to October 6th. Beginning in late-September, drone ship Just Read The Instructions (JRTI) joined the fray for its role in SpaceX’s GPS III SV04 launch for the US military, a launch that would also find itself delayed several times.

Two seconds before liftoff, new Falcon 9 booster B1062 automatically aborted its October 2nd launch attempt due to bad pressure readings in at least one of its nine Merlin 1D engines. SpaceX has since taken the rocket horizontal and is likely swapping multiple engines, possibly necessitating a second static fire test before the next attempt sometime later this month. That abort has also delayed SpaceX’s second NASA astronaut launch (Crew-1) from Halloween to mid-November to ensure no commonality.

Advertisement

SpaceX has an absolutely jam-packed fourth quarter ahead of it, ranging from GPS III SV04 and Crew-1 to a Sirius XM radio satellite, a Turkish communications satellite, and the joint NASA/ESA/CNES Sentinel 6A oceanography spacecraft. Stay tuned for updates and spectacular new photos from the Teslarati team.

Eric Ralph is Teslarati's senior spaceflight reporter and has been covering the industry in some capacity for almost half a decade, largely spurred in 2016 by a trip to Mexico to watch Elon Musk reveal SpaceX's plans for Mars in person. Aside from spreading interest and excitement about spaceflight far and wide, his primary goal is to cover humanity's ongoing efforts to expand beyond Earth to the Moon, Mars, and elsewhere.

Advertisement
Comments

Elon Musk

Tesla looks to expand Robotaxi geofence once again with testing in new area

It looks as if Tesla is preparing for its next expansion of the geofence, potentially moving toward a much larger service area that could eclipse 150 square miles.

Published

on

Credit: Joe Tegtmeyer | X

Tesla looks to be preparing for the potential expansion of the Robotaxi geofence once again, as the company was spotted testing the suite in an area well outside of the Austin service area.

After it first launched the Robotaxi platform on June 22, Tesla has managed to expand its geofence twice, essentially doubling the travel area both times.

The most recent expansion took the size of the geofence from 42 square miles to about 80 square miles, bringing new neighborhoods and regions of the city into the realm of where the driverless vehicles could take passengers.

However, it looks as if Tesla is preparing for its next expansion of the geofence, potentially moving toward a much larger service area that could eclipse 150 square miles.

Over the weekend, one fan noticed a Robotaxi validation vehicle testing in Bee Cave, Texas, which is roughly 25 minutes from the edge of the current geofence:

Tesla has been testing vehicles in the western suburbs of Austin for some time, and it seems the company is laying some groundwork to push its geofence expansion into Plaid Mode as competition with Waymo continues to be at the forefront of the conversation.

Waymo has been expanding with Tesla for some time, as the pace of expansion for the two companies has been relatively accelerated for the past couple of months.

Tesla’s expansions of the geofence sent a clear message to competitors and doubters, but it is still aiming to keep things safe and not push the envelope too quickly.

The geofence expansion is impressive, but Tesla is also focusing on expanding its vehicle fleet in both Austin and the Bay Area, where it launched a ride-hailing service in July.

Tesla Bay Area autonomous fleet to grow to over 100 units: Elon Musk

Still, safety is the priority at the current time.

“We are being very cautious. We do not want to take any chances, so we are going to go cautiously. But the service areas and the number of vehicles in operation will increase at a hyper-exponential rate,” CEO Elon Musk said during the Q2 Earnings Call.

Continue Reading

News

Tesla considers making a big move with Model Y pricing as demand is skyrocketing

“Trending toward a need to expedite output even further, which could mean adjusting pricing upward in the coming days. Trying hard not to, will see.”

Published

on

Credit: Tesla

Tesla is considering making a big move with Model Y pricing as demand is skyrocketing due to the EV tax credit expiring in just over a month.

With the $7,500 EV tax credit set to be removed on September 30, Tesla is experiencing increased demand for its Model 3 and Model Y. Customers are doing whatever they can to take delivery of the car they ordered as soon as possible.

The IRS recently adjusted the EV tax credit’s rules slightly.

Tesla set to win big after IRS adjusts EV tax credit rules

Previously, the vehicle had to be delivered by September 30, but a slight tweak the agency made last week will now allow customers to enter a legally binding contract along with a marginal down payment by that date. The delivery can occur after September 30, and the car can still qualify for the credit.

However, demand is getting so crazy for the Model Y that Tesla is considering a price increase on the all-electric crossover, as well as a potential boost in production output to keep up with orders.

Inventory is dwindling in several markets across the United States, a good sign for the company, as it could have one of its best quarters in recent history in terms of deliveries.

However, Tesla is thinking of bumping the price slightly, Raj Jegannathan, the company’s VP of IT, AI Infrastructure, Apps, Infosec, and Vehicle Service Operations, said on X:

The price adjustment would come as a response to increasing production output, Jegannathan’s response seems to indicate.

The bump would help Tesla’s margins, but the idea that the company could adjust pricing by increasing it would not be popular with potential car buyers. It might encourage some buyers to put their orders in sooner, hoping to avoid a new, higher price.

However, it could also steer some buyers away from putting an order in on a vehicle, especially if the price increase is more than a few hundred dollars.

Tesla boosted the price of the Model S, Model X, and Cybertruck recently, but brought in a “Luxe Package” to help justify it.

It comes with Free Full Self-Driving, Free lifetime Supercharging, four years of premium service, and lifetime Premium Connectivity.

Continue Reading

News

Tesla produces 100,000th new Model Y in Giga Berlin

The milestone was announced on X.

Published

on

Credit: Tesla Manufacturing/X

Tesla has produced its 100,000th new Model Y at Gigafactory Berlin. The milestone was announced by the electric vehicle maker through its official Tesla Manufacturing account on social media platform X. 

New Tesla Model Y milestone

The milestone was announced by Tesla on X, when the company wrote “Today, we built the 100,000th New Model Y at Giga Berlin!” The announcement was accompanied by an image of a new Model Y coming off the line.

The milestone was received warmly by members of the Tesla community, many of whom expressed excitement at the further progress of the new Model Y program at Giga Berlin. The facility, after all, only produces Model Y units, which would make it the perfect site to produce new variants like the Model Y Performance and possibly even the Model Y L, which was recently launched in China. 

New Model Y ramp

As noted in a previous report from electrive, the initial production of the new Model Y started in Giga Berlin around mid-January 2025. Since the new Model Y involved a changeover from the legacy Y to the new variant, the ramp of the new Model Y’s production at the Germany-based facility was likely a gradual process over the past months. 

It would then be no surprise if the next 100,000 new Model Y units would be produced in Giga Berlin in a shorter period. Giga Berlin could become an even bigger factor in Tesla’s global sales, after all, especially if it becomes the site that produces the Model Y Performance and the Model Y L for Europe and other territories. Giga Berlin, if any, seems to be quite busy recently, with aerial videos of the facility showing a fleet of mysteriously covered Model Y units being stored within the complex.

Advertisement
Continue Reading

Trending