News
SpaceX targeting 52 Falcon 9, Falcon Heavy launches in 2022
Shortly before SpaceX was scheduled to launch an Italian Earth observation satellite, a member of NASA’s Aerospace Safety Advisory Panel (ASAP) revealed that the company aims to conduct as many as 52 launches this year.
Supporting several estimates published by Teslarati over the last month, SpaceX officially targeting up to one launch per week in 2022 meshes well with the company’s record-breaking commercial launch manifest and plans for up to 10 Falcon launches in December 2021 and January 2022 alone. It also comes as no surprise after SpaceX’s spectacular performance in the first six months of 2021.

In H1 2021, before major production issues effectively halted all Starlink launches, SpaceX launches 20 Falcon 9 rockets in six months, demonstrating a sustainable cadence of 40 launches per year. Of those 20 launches, 13 were Starlink missions and 7 were commercial. Due to a lack of commercial launches and a lack of Starlink satellites to launch, SpaceX then proceeded to launch just three times between July 1st and November 11th.
However, in the last two months of 2021, SpaceX managed to go from launching three times in 19 weeks to launching eight Falcon 9 rockets in six weeks. Further, SpaceX completed five of those eight launches in less than three weeks. Given that that feat made December 2021 SpaceX’s first five-launch month ever just a year after SpaceX’s first four-launch month ever, it wasn’t unreasonable to assume that five launches in one month was a fluke. However, the fact that SpaceX abruptly went from a record of five launches in ~27 days to five launches in ~19 days did feel like more than a mere coincidence
That was confirmed about two weeks later, when a US military official responsible for managing the Florida range implicitly revealed that SpaceX was targeting up to five East Coast Falcon launches in January 2022. It then became a question of whether SpaceX’s plans would survive the only true constant of spaceflight: delays.
However, three weeks later, SpaceX has successfully launched three Falcon 9 rockets and is on track to launch another two from Florida in the last few days of the month. Originally scheduled to launch in late 2021, the Italian Space Agency’s (ASI) CSG-2 Earth observation radar satellite was eventually rescheduled for January 27th, but poor weather forced SpaceX to delay that launch to 6:11 pm EST (23:11 UTC), Friday, January 28th, 29th, and finally the 30th. Perhaps less than a day later, as early as 2:17 pm (19:17 UTC) on Monday, January 31st (delayed from Jan 29th and 30th), another Falcon 9 rocket is scheduled to launch a batch of approximately 49 Starlink satellites known as Starlink 4-7.
Last but not least, SpaceX has already tested and static-fired a third Falcon 9 rocket and is prepared to launch the National Reconnaissance Office’s (NRO) NROL-87 spy satellite(s) out of California’s Vandenberg Space Force Base (VSFB) no earlier than (NET) 11:07 am PST (19:07 UTC), Wednesday, February 2nd. If all three of those launches happen according to plan, SpaceX will have kicked off 2022 with six launches in the first five weeks of the year and, technically, just 27 days. Further, over a period of 10 weeks, SpaceX will have potentially completed twelve Falcon 9 launches.
In short, while just one month into the year, SpaceX is undeniably maintaining the launch cadence it will need to launch an average of one Falcon rocket per week for all of 2022. It’s obviously far more likely that unexpected issues will arise, significantly delaying a number of launches and pushing SpaceX below its goal of 52 launches in one year, but even 40 launches per year would be an extraordinary achievement. If SpaceX actually does achieve 50+ launches in 2022, Falcon 9 and Falcon Heavy will represent the second rocket family in history to achieve such a cadence – and the first to do so since the 1980s.
Tune in below around 6pm EST on Friday, January 28th to watch SpaceX’s fourth Falcon launch of the year.
Elon Musk
SpaceX just got pulled into the biggest Weapons Program in U.S. history
SpaceX joins the Golden Dome software group, deepening its role in America’s most expensive defense program.
SpaceX has joined a nine-company group developing the core operating software for the Golden Dome, America’s next-generation missile defense system. According to a Bloomberg report, SpaceX is focused on integrating satellite communications for military operations and is working alongside eight other defense and artificial intelligence companies, including Anduril Industries, Palantir Technologies, and Aalyria Technologies, to build software connecting missile defense capabilities.
The Golden Dome concept dates back to President Trump’s 2024 campaign, and on January 27, 2025, he signed an executive order directing the U.S. Armed Forces to construct the system before the end of his term. The system is planned to employ a constellation of thousands of satellites equipped with interceptors, with data centers in space providing automated control through an AI network.
FCC accepts SpaceX filing for 1 million orbital data center plan
Space Force Gen. Michael Guetlein, director of the Golden Dome initiative, has described the software layer as a “glue layer” that would enable officers to manage and control radars, sensors, and missile batteries across services. The consortium is aiming to test the platform this summer.
Trump selected a design in May 2025 with a $175 billion price tag, expected to be operational by the end of his term in 2029, though the Congressional Budget Office projected the cost could reach $831 billion over two decades.
The Golden Dome role is only the latest in a string of military wins for SpaceX. As Teslarati reported, the U.S. Space Force awarded SpaceX a $178.5 million task order on April 1, 2026 to launch missile tracking satellites for the Space Development Agency, covering two Falcon 9 launches beginning in Q3 2027. That came on top of more than $22 billion in government contracts held by SpaceX as of 2024, per CEO Gwynne Shotwell, spanning NASA resupply missions, classified intelligence satellites through its Starshield program, and military broadband.
The accumulation of defense contracts, now including a seat at the table on the most expensive weapons program in U.S. history, positions SpaceX as the dominant infrastructure provider for American national security in space. With a SpaceX IPO still on the horizon, each new contract adds weight to what is already one of the most consequential companies in aerospace history, raising real questions about how much of America’s defense architecture will depend on a single private operator before it ever trades publicly.
News
Tesla pulls back the curtain on Cybercab mass production
Tesla’s Cybercab drives itself off the Gigafactory Texas line in a striking new production video.
Tesla has provided a first look from inside a production Cybercab as it drove itself off the assembly line at Gigafactory Texas. The video footage, posted on X, opens on the factory floor with robotic arms and assembly equipment visible through the Cybercab windshield, and follows the car through a branded tunnel marked “Cybercab”, before autonomously navigating itself to a holding lot.
The first Cybercab rolled off the Giga Texas production line on February 17, 2026, with Musk writing on X, “Congratulations to the Tesla team on making the first production Cybercab.” April marked the official shift to volume production. The Giga Texas line is being prepared to produce hundreds of units per week, with 60 units already spotted on the Gigafactory campus earlier this month.
Purpose-built for autonomy
Cybercab in production now at Giga Texas pic.twitter.com/Y9qG3KyWBa
— Tesla (@Tesla) April 23, 2026
The Cybercab was first revealed publicly at Tesla’s “We, Robot” event in October 2024 at Warner Bros. Studios in Burbank, California, where 20 pre-production units gave attendees rides around the studio lot. Musk said he believed the average operating cost would be around $0.20 per mile, and that buyers would be able to purchase one for under $30,000. The two-seat design is deliberate. Musk noted that 90 percent of miles driven involve one or two people, making a compact two-passenger vehicle the most efficient configuration for a fleet-scale robotaxi. Eliminating rear seats also removes complexity and cost, supporting that sub-$30,000 target.
Tesla’s annual production goal is 2 million Cybercabs per year once several factories reach full design capacity. The Cybercab has no steering wheel, no pedals, and relies entirely on Tesla’s vision-based FSD system. What the video shows is the first evidence of that system working not as a demo, but as a production reality, driving itself off the line and into the world.
🚗 Our first ride in Tesla Cybercab last October: pic.twitter.com/kGqIqgJPRn https://t.co/BITCXFhbVd
— TESLARATI (@Teslarati) April 22, 2025
Elon Musk
Elon Musk talks Tesla Roadster’s future
Elon Musk confirmed the Roadster as Tesla’s last manually driven car, with a debut coming soon.
During Tesla’s Q1 2026 earnings call on April 22, Elon Musk made a brief but notable comment about the long-awaited next generation Roadster while describing Tesla’s future vehicle lineup. “Long term, the only manually driven car will be the new Tesla Roadster,” he said. “Speaking of which, we may be able to debut that in a month or so. It requires a lot of testing and validation before we can actually have a demo and not have something go wrong with the demo.”
That single statement is the entire Roadster update from yesterday’s call, and while it represents another timeline shift, it comes as no surprise with Tesla heads-down-at-work on the mass rollout of its Robotaxi service across US cities, and the industrial scale production of the humanoid Optimus.
The fact that Musk specifically framed the Roadster as the last manually driven Tesla is significant on its own. As the rest of the lineup moves toward full autonomy, the Roadster becomes something rare in the Tesla-sphere by keeping the driver in control. Driving enthusiasts who buy a $200,000 supercar are not doing so to be passengers. They want the physical connection to the road, the feel of acceleration under their own input, and the experience of controlling something with that level of performance. FSD, however capable it becomes, removes that entirely. The Roadster signals that Tesla understands this distinction and is building a car specifically for the people who consider driving itself the point.
Tesla isn’t joking about building Optimus at an industrial scale: Here we go
The specs for the Roadster Musk has teased over the years are genuinely unlike anything in production. The base model targets 0 to 60 mph in 1.9 seconds, a top speed above 250 mph, and up to 620 miles of range from a 200 kWh battery. The optional SpaceX package takes it further, rumored to add roughly ten cold gas thrusters operating at 10,000 psi, borrowed directly from Falcon 9 rocket technology. With thrusters, Musk has claimed 0 to 60 mph in as little as 1.1 seconds. In a 2021 Joe Rogan interview he went further, stating “I want it to hover. We got to figure out how to make it hover without killing people.” Tesla filed a patent for ground effect technology in August 2025, suggesting the hover concept has not been abandoned. The starting price remains $200,000, with the Founders Series requiring a $250,000 full deposit. Some reservation holders placed those deposits in 2017 and are approaching a full decade of waiting.
With production now targeted for 2027 or 2028 at the earliest, the Roadster remains Tesla’s most audacious promise and its longest-running delay. But if what Musk is testing lives up to even half of what he has described, the demo alone should be worth waiting for.
Elon Musk says the Tesla Roadster unveiling could be done “maybe in a month or so.”
He said it should be an extraordinary unveiling event. pic.twitter.com/6V9P7zmvEm
— TESLARATI (@Teslarati) April 22, 2026