In the past, Tesla didn’t spend any money on advertising its products, only launching plans to test the ad waters earlier this year. However, since the announcement that Tesla would begin to promote its cars, several of the company’s ad campaigns have been spotted in public — including one recent sighting in a Japanese airport.
X user Omarr0717 spotted a large row of screens featuring Tesla advertisements at the Tokyo Haneda International Airport this week, as posted in a short video. The displays shared a range of ads, including information about the Tesla Model Y, the Autopilot system, Superchargers, Camp Mode and more.
The advertisements cycled through the different topics on a huge row of side-by-side screens, each including a QR code that viewers could scan to navigate directly to the automaker’s website. You can see Omar’s full 19-second video of the advertisements below, as posted on X.
Advertising in Japan. #hanadaairport pic.twitter.com/lKzxRGVP8A
— CuriosityCortex (@CortexCuriosity) October 10, 2023
The news comes after much discussion in recent weeks and months about how much Tesla should invest in advertising. CEO Elon Musk only announced plans to commit to “a little advertising” in May, and some still say the automaker needs to advertise more, despite a string of Tesla advertisements being spotted in recent months.
One such Tesla bull who has been pro-advertising for Tesla is Future Fund Managing Partner Gary Black, who has criticized the automaker for not making its consumers aware of its products through ads. Black said in April that he thought Tesla should use ads to help educate its audience about its vehicles, especially as the automaker cut prices across its entire lineup.
More recently, Black suggested that Tesla could improve its perception in mainstream media sources through advertising by highlighting the gradually decreasing costs of its vehicles to consumers. He’s also been outspoken about the company embracing a public relations approach, saying that Tesla refuses to engage when false stories and details come out in traditional news sources.
I’m tired of $TSLA uberbulls complaining about the unfair mainstream media. If TSLA doesn’t make the effort to tell their side of the story you can’t blame the MSM for not posting the positive stuff TSLA is doing. I speak with DJ, Bloomberg, Reuters and others about all the TSLA…
— Gary Black (@garyblack00) October 4, 2023
Tesla got rid of its public relations department in 2020, declining to respond to press inquiries ever since. The move represented the first time in history that an automaker had completely dissolved its PR department, representing just one of Tesla’s many unique approaches compared to traditional car manufacturers.
Musk has also echoed the concept that Tesla advertisements could help educate the public about the company’s vehicles, with related statements dating as far back as 2021. Still, Tesla has largely focused on word of mouth to advertise its products, along with Musk’s regular posts on X about Tesla and many other unrelated subjects.
Elon Musk ponders using ‘informational’ Tesla advertisements for public awareness
What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send your tips to us at tips@teslarati.com.
Elon Musk
Starlink powers Europe’s first satellite-to-phone service with O2 partnership
The service initially supports text messaging along with apps such as WhatsApp, Facebook Messenger, Google Maps and weather tools.
Starlink is now powering Europe’s first commercial satellite-to-smartphone service, as Virgin Media O2 launches a space-based mobile data offering across the UK.
The new O2 Satellite service uses Starlink’s low-Earth orbit network to connect regular smartphones in areas without terrestrial coverage, expanding O2’s reach from 89% to 95% of Britain’s landmass.
Under the rollout, compatible Samsung devices automatically connect to Starlink satellites when users move beyond traditional mobile coverage, according to Reuters.
The service initially supports text messaging along with apps such as WhatsApp, Facebook Messenger, Google Maps and weather tools. O2 is pricing the add-on at £3 per month.
By leveraging Starlink’s satellite infrastructure, O2 can deliver connectivity in remote and rural regions without building additional ground towers. The move represents another step in Starlink’s push beyond fixed broadband and into direct-to-device mobile services.
Virgin Media O2 chief executive Lutz Schuler shared his thoughts about the Starlink partnership. “By launching O2 Satellite, we’ve become the first operator in Europe to launch a space-based mobile data service that, overnight, has brought new mobile coverage to an area around two-thirds the size of Wales for the first time,” he said.
Satellite-based mobile connectivity is gaining traction globally. In the U.S., T-Mobile has launched a similar satellite-to-cell offering. Meanwhile, Vodafone has conducted satellite video call tests through its partnership with AST SpaceMobile last year.
For Starlink, the O2 agreement highlights how its network is increasingly being integrated into national telecom systems, enabling standard smartphones to connect directly to satellites without specialized hardware.
Elon Musk
Elon Musk’s Starbase, TX included in $84.6 million coastal funding round
The funds mark another step in the state’s ongoing beach restoration and resilience efforts along the Gulf Coast.
Elon Musk’s Starbase, Texas has been included in an $84.6 million coastal funding round announced by the Texas General Land Office (GLO). The funds mark another step in the state’s ongoing beach restoration and resilience efforts along the Gulf Coast.
Texas Land Commissioner Dawn Buckingham confirmed that 14 coastal counties will receive funding through the Coastal Management Program (CMP) Grant Cycle 31 and Coastal Erosion Planning and Response Act (CEPRA) program Cycle 14. Among the Brownsville-area recipients listed was the City of Starbase, which is home to SpaceX’s Starship factory.
“As someone who spent more than a decade living on the Texas coast, ensuring our communities, wildlife, and their habitats are safe and thriving is of utmost importance. I am honored to bring this much-needed funding to our coastal communities for these beneficial projects,” Commissioner Buckingham said in a press release.
“By dedicating this crucial assistance to these impactful projects, the GLO is ensuring our Texas coast will continue to thrive and remain resilient for generations to come.”
The official Starbase account acknowledged the support in a post on X, writing: “Coastal resilience takes teamwork. We appreciate @TXGLO and Commissioner Dawn Buckingham for their continued support of beach restoration projects in Starbase.”
The funding will support a range of coastal initiatives, including beach nourishment, dune restoration, shoreline stabilization, habitat restoration, and water quality improvements.
CMP projects are backed by funding from the National Oceanic and Atmospheric Administration and the Gulf of Mexico Energy Security Act, alongside local partner matches. CEPRA projects focus specifically on reducing coastal erosion and are funded through allocations from the Texas Legislature, the Texas Hotel Occupancy Tax, and GOMESA.
Checks were presented in Corpus Christi and Brownsville to counties, municipalities, universities, and conservation groups. In addition to Starbase, Brownsville-area recipients included Cameron County, the City of South Padre Island, Willacy County, and the Willacy County Navigation District.
Elon Musk
The Boring Company wins key approval for Nashville Music City Loop
The approval allows The Boring Company to use state-owned right-of-way along Tennessee’s highway system.
Tennessee Gov. Bill Lee announced that the Tennessee Department of Transportation (TDOT) and the Federal Highway Administration (FHWA) have jointly approved The Boring Company’s lease application and enhanced grading permit for the Music City Loop.
The approval allows The Boring Company to use state-owned right-of-way along Tennessee’s highway system, clearing a key hurdle for the privately funded tunnel project that aims to connect downtown Nashville to Nashville International Airport in approximately eight minutes, the Office of the TN Governor wrote in a press release.
“Tennessee continues to lead the nation in finding innovative solutions to accommodate growth, and in partnership with The Boring Company, we are exploring possibilities we couldn’t achieve on our own,” Gov. Lee said in a statement.
“The Boring Company is grateful for the leadership and hard work of federal, state, and local agencies in bringing this project to a shovel-ready point,” The Boring Company President Steve Davis said. “Music City Loop will be a safe, fast, and fun public transportation system, and we are excited to build it in Nashville.”
With lease and permitting approvals secured, The Boring Company will move forward with the Loop system’s construction immediately. The first segment of the Loop system is expected to be operational by the end of the year.
The Music City Loop will run beneath state-owned roadways and is designed to connect downtown Nashville to the airport, as well as lower Broadway to West End. The project will be 100% privately funded.
“The Music City Loop shows what’s possible when we leverage private-sector innovation and American ingenuity to solve transportation challenges,” said U.S. Transportation Secretary Sean Duffy. “TDOT’s lease approval will help advance this ambitious project as we work to reduce congestion and make travel more seamless for the American people.”
The Boring Company described the Loop as an all-electric, zero-emissions, high-speed underground transportation system that will meet or exceed safety standards. The Vegas Loop, for one, earned a 99.57% safety and security rating from the DHS and the TSA, the highest score ever awarded to any transportation system.