Connect with us

Elon Musk

Tesla still has two major milestones on track before end of Q2

Tesla still is on track to complete two monumental achievements as Q2 nears its end.

Published

on

(Credit: Tesla)

Tesla still has two major milestones it is on track to complete before the end of the second quarter, according to statements made by the automaker earlier this year.

With the launch of the Robotaxi platform in Austin on Sunday, Tesla has already completed perhaps its biggest milestone of 2025.

However, these are not the only things the company hopes to accomplish before we head into the latter half of the year, as there are two major things the company said it is aiming to complete before the third quarter starts next week.

Affordable Models

Tesla said earlier this year, on two separate occasions, that it is still on track to develop, build, and unveil the first affordable models that will be built on both the next-gen platform and also have aspects of the current vehicle platform.

Potential affordable Tesla “Model 2/Model Q” test car spotted anew in Giga Texas

In the Q4 2024 Earnings Call in January, the company said:

Advertisement
-

“Preparations are underway across our existing factories for the launch of new products in 2025, including more affordable models.”

The company continued:

“Plans for new vehicles, including more affordable models, remain on track for start of production in the first half of 2025. These vehicles will utilize aspects of the next generation platform as well as aspects of our current platforms and will be produced on the same manufacturing lines as our current vehicle line-up.”

Although there are only a few days left, Tesla has yet to confirm that these affordable models are delayed, so we can expect that they’ll be arriving before the quarter ends.

The company might have been hinting toward one recently at the Fremont Factory, but it is more likely that the vehicle seen was the new Model Y Performance trim:

Tesla’s apparent affordable model zips around Fremont test track

Advertisement
-

Tesla delivers itself to customers

Back in late May, CEO Elon Musk said that the first Tesla to self-deliver would happen in June:

Tesla just launched its Robotaxi platform on Sunday, so this would be a tremendous step if it can, in fact, make this happen.

Advertisement
-

The customer would likely be extremely local to Gigafactory Texas. In the future, the company would load the vehicles onto haulers and then drive to customer homes from delivery centers, showrooms, and repair centers.

Teslas will self-deliver to customers, Elon Musk says: here’s when

Tesla has a few days left to complete both of these tasks, and then it will report delivery figures for the second quarter next week.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

Elon Musk says he knows how to save Earth for a billion years

Elon Musk says sentient AI satellites launched from the Moon could keep Earth livable forever.

Published

on

By

Elon Musk spent part of his weekend describing a plan to keep the planet livable for roughly a billion years, and it starts with satellites that can think for themselves.

In a post on X, Musk argued that swapping fossil fuels for solar and wind power will not be enough to protect humanity from what he called extremely severe extinction events, the kind that occur roughly every 100 million years. His fix is what he called sentient satellites, or solar-powered satellites, controlled by AI, that would sit in a fixed spot between Earth and the Sun after being launched off the Moon using a giant electromagnetic catapult instead of rockets.

The satellites’ onboard AI would make continuous, small adjustments rather than waiting on human instructions. The mass driver is Musk’s proposed way of getting the raw material there cheaply by using an electromagnetic launch track built on the Moon, where lower gravity and no atmosphere make it far easier to fling cargo into space than it is from Earth.

Musk shared a Grok generated estimate suggesting roughly 5 percent of Florida’s land, or about 1.68 million acres, could face regular flooding by 2070 under a high sea level rise scenario, and said humanity has about 50 years to act before coastal living looks very different than it does today.

Advertisement
-

This is not the first time Musk has floated the idea. He raised a similar concept in November, describing a solar powered AI satellite constellation that could make tiny adjustments to incoming sunlight to fine tune Earth’s temperature. Musk has also tied planetary risk to his broader vision at SpaceX, where his compensation package is explicitly linked to establishing a self-sustaining Mars colony, one he has described as an insurance policy against the kind of extinction event he referenced this weekend, and where he has said humans could set foot within five to seven years.

Continue Reading

Elon Musk

OpenAI cites distrust of SpaceX in decision to drop Cursor partnership

OpenAI will cut SpaceX-owned Cursor’s model access in November, citing Musk’s history of broken contracts.

Published

on

By

OpenAI, the company behind ChatGPT, announced late Friday that it is ending its partnership with Cursor, cutting off the coding tool’s access to its models on November 12. The move comes two weeks after SpaceX completed its $60 billion acquisition of Cursor’s parent company, Anysphere, folding the popular AI coding assistant into Elon Musk’s growing SpaceXAI division.

In a post on its website, OpenAI said the decision came down to trust, not technology. “We cannot be confident that SpaceX will use our technology within our terms of service, based on our experience with Elon Musk’s companies violating contracts,” the company wrote. OpenAI pointed to two specific incidents: X, now part of SpaceX, allegedly breaking the terms of an existing OpenAI contract after Musk bought Twitter.

That lawsuit is the backdrop for all of this. Musk cofounded OpenAI in 2015, left the board in 2018, and sued Sam Altman and Greg Brockman in 2024, arguing they abandoned the company’s nonprofit mission for profit. A federal jury sided with OpenAI in May, finding Musk waited too long to sue rather than ruling on the merits of his claims. Musk said at the time he would appeal to the Ninth Circuit, calling the outcome a “calendar technicality” rather than a real judgment.

Elon Musk breaks silence on OpenAI trial decision

SpaceX’s interest in Cursor predates that verdict by weeks. The company first struck a deal with Cursor in April, securing an option to acquire it for $60 billion or pay $10 billion for joint development work instead. As Teslarati reported at the time, the logic was straightforward: Cursor was paying retail prices to Anthropic and OpenAI, two of its most direct competitors, every time a developer used its product, while SpaceX had idle capacity on its Colossus supercomputer, roughly the equivalent of a million Nvidia H100 GPUs, that Cursor could use to train its own models instead. SpaceX exercised the option in June, days after its own IPO, and the deal closed in mid-August.

Once it closed, Musk moved fast. On an all-hands call with more than 1,000 Cursor employees, he reportedly told staff that SpaceXAI’s Grok was playing catchup in the AI race, unlike Tesla and SpaceX in their own markets, and singled out Anthropic as the company to catch. Cursor CEO Michael Truell now reports directly to Musk inside SpaceXAI.

Advertisement
-

Elon Musk admits he was ‘clearly wrong’ about Anthropic

Losing OpenAI’s models leaves Cursor leaning harder on Anthropic’s Claude, which has its own compute agreement with SpaceX, and on Cursor’s in-house Composer model, the one SpaceX’s compute was supposed to accelerate in the first place. OpenAI framed the November deadline as maximum notice under its contract, and said it wants to “go above and beyond” to help developers through the transition. Whether Anthropic makes the same call is now the open question in AI coding.

Continue Reading

Elon Musk

County vote hands Elon Musk’s Vegas tunnel network a huge new target

Clark County approved 19 more Vegas Loop stations, pushing Boring Company’s entitled total to 123.

Published

on

By

The-boring-company-vegas-loop-riviera

The Boring Company just got permission to nearly double how far Vegas Loop can reach. Clark County commissioners approved 19 additional stations for the underground transit system, bringing the total entitled to 123, the company said in a post on X thanking the county for the vote. Elon Musk’s tunneling company also flagged the direction it sees the project heading long term. “Because Loop is point-to-point with no intermediate stops, in the limit, one could have a Loop station in every driveway,” the company wrote.

That framing captures how far the ambitions have moved. The Vegas Loop opened its first stretch of tunnel in 2021 and has grown its footprint through a string of county approvals since. In 2023, commissioners signed off on 18 additional stations, part of a plan that later doubled the system’s target to 69 stations across 65 miles. By the end of that year the company was describing a build out closer to 93 planned stations. Last year the long term design called for 104 stations across 68 miles of tunnel. The new approval pushes that number to 123, another jump in a project that keeps outgrowing its own blueprints.

The Boring Company gets approval for more stations in Las Vegas

Station count on paper is still well ahead of what riders can actually use. As Teslarati reported earlier this month, the network has about 11 open stations and has carried more than 4 million passengers since it began running, with newer stops at Fontainebleau and Sahara among the latest additions to the Strip corridor. A tunnel connection to Harry Reid International Airport remains under construction and has already slipped past its original first quarter target. The company is also racing to finish a Westgate to Paradise Road segment that Las Vegas Convention and Visitors Authority CEO Steve Hill has said it hopes to have running in time for November’s Formula 1 race.

The gap between entitled stations and operating ones is where the real story sits. Regulatory approval gives Boring Company the legal runway to keep tunneling toward new resorts, residential pockets and eventually the airport, but building each connection still comes down to boring machines, fire safety sign offs and construction timelines that have slipped before. The company’s Prufrock series machines set an internal record in March with a 2.28 mile tunnel near Westgate, evidence that construction has been picking up even as the list of approved destinations grows faster than the tunnels themselves.

Musk’s driveway comment reads as aspirational rather than a near term plan, but it fits how Boring Company has talked about Vegas Loop from the start: treat every approval as a floor, not a ceiling, and keep pushing county officials for room to dig.

Advertisement
-
Continue Reading