Connect with us

News

GM equips MIT grad’s battery company to slash cell costs by 60%

(Credit: AutoGuide.com)

Published

on

General Motors has struck up a deal with SolidEnergy Systems, an MIT grad’s lithium metal battery innovation company. SES plans to use its technologies to create smaller cells with higher energy density, a strategy that GM hopes can slash the cost of battery cells by 60%.

GM announced the partnership on March 11th, adding that it would build a manufacturing prototyping line in Woburn, Massachusetts, for a high-capacity, pre-production battery by 2023.

SES was started by Harvard and MIT grad Qichao Hu, who also gave more details on the partnership with GM.

“In the coming years, SES and GM will work closely to optimize the design and manufacturing of automotive-grade Li-Metal battery cells,” Hu said. “In 2023, we will deliver a high-performance, Li-Metal EV battery prototype intended for production. Our battery technology will be validated through GM’s rigorous qualification process.”

In the past, GM had announced that its Ultium EV battery platform would slash EV costs by 60% by 2025. With the company planning to go completely electric by 2035, GM has around a decade and a half to figure out how it will transition from one of the largest automotive manufacturers in the ICE market to a highly-competitive player in the sector of electric cars. Currently, GM has EVs across the Chevrolet brand in the Chevy Bolt, and has plans to unveil a new variant of the GMC Hummer EV in April. Expanding the company’s product line will require large-scale EV battery production, and SES is the company that has been tasked with this mission.

Earlier this week, Cairn Energy Research Advisors released a report that targeted GM’s battery purchasing costs at $169 per kWh, while the company’s packs are averaging around $207 per kWh. A 60% reduction in cost would benefit GM greatly as it plans to launch a massive offensive into the EV space over the next few years.

Advertisement
-

GM reveals Hummer EV: $80k starting price, 200 kWh battery, up to 350 mile range, ‘Crabwalk,’ and more

GM invested in SES six years ago in 2015. While the company declined to outline how much it invested into the battery company, they did admit it catalyzed “the start of a close working relationship between SES and General Motors’ research and development organization.”

The first generation Ultium batteries will begin deployment in the GMC Hummer EV later this year and is the initial segment of a $27 billion investment plan into electric cars for GM.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

News

Tesla Roadster is available for order once again following brief hold

Published

on

(Credit: luxunsheep/Instagram)

Tesla has reopened reservations for its long-delayed next-generation Roadster, asking buyers for a $50,000 deposit just days before an October 1 reveal event in Waco, Texas. The move revives a reservation process first launched in 2017 and later paused when Tesla pulled pricing from its website in 2021.

The reservation page requires an immediate $5,000 credit-card payment, described as fully refundable, followed by a $45,000 wire transfer due within 10 days, which is identical to what was expected previously. Reservations are not considered final until the wire clears.

The structure matches the 2017 terms Tesla used when it first collected deposits after unveiling a prototype. Tesla has not published a confirmed retail price or production start date on the order page.

The October 1 event is scheduled in Waco, about 90 minutes north of Tesla’s Austin headquarters and near SpaceX’s McGregor rocket test site. Tesla sent invitations to existing reservation holders and posted a “Go for launch” teaser on September 12.

Advertisement
-

The Federal Aviation Administration (FAA) established a temporary flight restriction over the McGregor area from September 18 through October 2, consistent with plans for a demonstration involving SpaceX-designed cold-gas thrusters. Elon Musk has previously described the optional package as enabling extreme acceleration or brief hovering. Tesla has said the event will include pricing, specifications, and production targets.

The second-generation Roadster was first shown in November 2017 during Tesla’s Semi launch. Musk promised production in 2020, with claimed performance of 0-60 mph in 1.9 seconds, more than 250 mph top speed, and roughly 620 miles of range.

Those targets have slipped repeatedly.

Tesla later pointed to 2022, 2023, 2024, and 2025-2026 before indicating production would not begin until 2027 or 2028 at Gigafactory Texas. Design work has continued, with reports of a sharper, Cybertruck-influenced look replacing the original curvy prototype.

Original reservation holders who paid $50,000 in 2017, or $250,000 for the Founders Series, have waited nearly nine years without a production car. Some high-profile customers canceled. Tesla’s decision to reopen orders now, after previously shutting them down, tests whether new buyers will commit substantial funds before seeing a finalized production vehicle. The October 1 event is intended to answer remaining questions about what those buyers will actually receive and when.

Advertisement
-
Continue Reading

News

Tesla Full Self-Driving expands to another European country

Published

on

Credit: Tesla

Tesla’s Full Self-Driving (Supervised) is heading to Czechia after the Czech Ministry of Transport recognised the Dutch RDW’s provisional type approval, making the country the seventh EU member state to clear the system for public roads. Tesla Europe announced on 21 September 2026 that “FSD Supervised is now approved in Czechia” and that rollout “will begin soon.”

The decision marks a notable reversal. Earlier in 2026, Prague had declined to automatically recognise the Netherlands’ April approval, citing concerns over speed-limit compliance, traffic-sign recognition and driver-attention monitoring, and arguing that a coordinated EU approach was preferable. Officials said months of expert review, talks with Tesla and other member states, and real-world data from countries already using the system resolved those issues.

“Safety remains the top priority,” the ministry stated.

FSD Supervised remains a Level 2 driver-assistance system: the driver must stay engaged and is legally responsible. Eligible vehicles need AI4, the company’s most up-to-date hardware version. Tesla is expected to push the feature over the air in the coming days, following the pattern seen after earlier national approvals.

Advertisement
-

Europe’s rollout began when Dutch regulator RDW issued a provisional EU type approval on 10 April 2026 after extensive testing. Mutual recognition then produced a rapid cascade: Lithuania (20 May), Estonia (29 May), Denmark (9 June), Belgium (10 June) and Slovenia (7 September). Czechia now completes that list of seven.

The approvals cover only a modest share of the EU population, but they add political weight ahead of a 6 October vote by the Technical Committee on Motor Vehicles. A qualified majority, at least 15 of 27 member states representing 65 percent of the EU population, could open the remaining markets, including large ones such as Germany, France, Italy and Spain that have so far preferred to wait for a bloc-wide decision.

For Czech Tesla owners, the immediate prize is access to the same supervised highway and city driving already available in the other six countries. For Tesla, each new market generates additional European driving data and strengthens the case that FSD Supervised can operate safely under the continent’s varied road rules. The Czech approval is therefore both a local milestone and another incremental step toward a wider European launch.

Continue Reading

News

Tesla Roadster event requires restricted airspace, and the FAA obliges

Published

on

Credit: @BLKMDL3/Twitter

The Federal Aviation Administration (FAA) has established a Temporary Flight Restriction over SpaceX’s McGregor, Texas, rocket development and test facility, a move widely viewed as preparation for Tesla’s October 1 Roadster reveal. The restriction took effect September 18 and runs through October 2.

NOTAM FDC 6/3825 covers a 1.5-nautical-mile radius around the site near Waco and extends from the surface to 10,000 feet above ground level. The FAA cited hazards under 14 CFR 91.137(a)(3) and barred aircraft and drones from the zone. Tesla’s invitation to reservation holders already placed the event in Waco, about 20 minutes from McGregor, making the timing and location more than coincidental.

What stands out is the altitude. Typical recent TFRs at McGregor for engine static fires and component tests have used far lower ceilings, often around 2,000 feet. Raising the limit to 10,000 feet is unusually high even compared with some Starbase restrictions and signals operations that go beyond a standard ground-level engine test.

That extra airspace has fueled speculation about the long-promised SpaceX Package for the Roadster. Elon Musk has described cold-gas thrusters that could deliver sub-one-second 0-60 times and, more dramatically, brief lift-off. Reports earlier this year indicated Tesla planned a remote-controlled demonstration at McGregor in which the car would leave the ground with no one inside; spectators kept hundreds of yards away because of the noise.

Advertisement
-

The 10,000-foot envelope would give operators a large safety buffer even if the vehicle only hovers a short distance.

Tesla has not confirmed a flight demo. The company has only used the phrase “Go for launch” and posted a teaser image of the car on what looks like a launch pad. The TFR itself mentions only hazards. Still, closing airspace this high and this close to the reveal date strongly suggests the event will include more than a static display.

Whether the Roadster actually hovers on October 1 remains to be seen. What is certain is that the FAA has cleared a large vertical slice of Texas sky for whatever Tesla and SpaceX intend to show. Reservation holders heading to Waco will be among the first to find out if the car can do more than drive.

Continue Reading