Connect with us

News

Tesla initiates rare physical recall for 2016 Model X over appliqué issue

Credit: Tesla Asia/X

Published

on

Tesla has initiated a rare physical recall for the 2016 Model X SUV. As per the National Highway Traffic Safety Administration’s (NHTSA) Safety Recall Report, a total of 9,136 units of the 2016 Model X that were produced through July 31, 2016 are affected by the issue. 

The Tesla Model X is equipped with a cosmetic front appliqué just behind the windshield, as well as a spine appliqué at the center of the roof in between the falcon door roof glass. Both appliqués are attached to the vehicle using urethane. If not enough primer was used in the appliqué-to-urethane interface, the adhesion of the part could weaken, and the appliqué could separate from the Model X. Such an issue could be a traffic hazard, especially if the appliqué comes off while the 2016 Model X is in motion.

Interestingly enough, Tesla already initiated a physical recall in November 2020 to inspect 2016 Model X units for proper appliqué retention. At the time, Tesla used an inspection method that involved pulling the appliqué in several areas with a maximum force of 60N. If the components weathered the 60N pull inspection, they were not replaced. Tesla has now determined that either the inspection pull force or the location and number of locations where the pull force was applied in the 2020 recall were not sufficient to accurately identify faults in the component. 

To address this issue, Tesla will be inspecting affected 2016 Model X vehicles and perform an improved retention test with a higher pulling force at a minimum of 120N. If the appliqué passes the retention test and shows sufficient adhesion, then no further action would be necessary. If the appliqué fails the retention test, Tesla Service will reattach the affected component using the proper primer and urethane procedure. A full replacement for the appliqué would also be performed if needed. 

It should be noted that the appliqué issue seems to be present only on 2016 Tesla Model X units that were produced through July 31, 2016. Following this date, the supplier of the component implemented new processes to standardize and document its primer application, addressing the appliqué adhesion issue. 

The NHTSA’s Safety Recall Report about the 2016 Tesla Model X’s appliqué issue can be viewed below. 

Advertisement
-

RCLRPT-24V615-6995 by Simon Alvarez on Scribd

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

SpaceX’s $24B Starbase supercomputer plan slipped past a key roadblock

SpaceX wants a Starbase tax break for a $24 billion gas plant and supercomputer campus.

Published

on

By

Concept rendering of SpaceX President Gwynne Shotwell overlooks the company’s Hawthorne, California headquarters as an American flag flies over the campus at sunset.

SpaceX is asking its own company town for a tax break on a $24 billion natural gas power plant and supercomputing facility at Starbase, Texas, and the land it picked sits just outside the reach of a data center moratorium that took effect in neighboring Brownsville last week.

A City of Starbase public hearing notice says SpaceX “proposes to construct, own, and operate a gas-fired power plant and super-compute facility” on roughly 444 acres between Boca Chica Boulevard and the Port of Brownsville. The $24 billion figure covers only the initial phases, and the notice leaves room for future expansions. The Starbase City Commission will consider a property tax abatement and a related economic development agreement at a 7 p.m. hearing on December 9. The notice does not disclose the size or length of the abatement, or how much computing capacity the site would hold.

The location has a history. Over the summer, SpaceX asked Brownsville to remove the tract from its city limits and offered $220 million for water and wastewater projects in return. Brownsville approved the move in August, and Starbase later annexed the land. Brownsville’s own 90-day pause on data center applications took effect last week, and had the tract stayed inside the city, the project likely would have needed a different home.

The power side is already in front of state regulators. SpaceX has applied to the Texas Commission on Environmental Quality for air permits covering 35 mobile gas turbines producing roughly 750 megawatts, according to Politico, which also noted that two of the three Starbase commissioners voting on the incentives are SpaceX executives.

Building its own plant lets SpaceX skip the Texas grid. Gov. Greg Abbott paused new data center grid connections in August pending an audit, but a facility that generates its own electricity does not need one. The air permit still has to clear the TCEQ, where Abbott also ordered a halt on data center permits.

Advertisement
-

The bigger test arrives in January. Governor-elect Gina Hinojosa, who unseated Abbott last week, has said she will block data center approvals until the legislature passes new protections, and she has already asked state officials to hold off on any sale of Boca Chica State Park to SpaceX until she is sworn in. Tesla and SpaceX shares both fell the day after the election, and Musk’s first reaction on X was “Data centers in space looking pretty appealing right now.”

That line points to Starmind, SpaceX’s orbital compute constellation. Musk has said terrestrial compute will be “peanuts compared to orbital compute” and expects monthly orbital deployments to pass ground deployments around the end of 2028, as Teslarati reported. Until then, SpaceX still needs gigawatts on the ground. It ended the third quarter with 1.7 GW of nameplate compute, is targeting 2.5 to 3 GW by the end of this year and wants at least 10 GW more in 2027. Its existing Colossus sites around Memphis already run on gas turbines and face a lawsuit from residents over emissions.

Local reaction is split. The South Texas Environmental Justice Network has announced a protest, citing air quality, water use and energy bills, while some Brownsville residents told the Tribune they welcome the jobs. SpaceX did not respond to the Tribune’s questions about the project.

Continue Reading

Elon Musk

Tesla extends Cybertruck production as Musk concedes ‘sentimentality’

Published

on

Credit: diagnosticdennis/Instagram and @smile__no via Tesla Owners of Santa Clarita Valley/X

Tesla CEO Elon Musk announced that the company will extend Cybertruck production slightly to handle its extensive order backlog.

On Wednesday, Musk announced that “In order to work through more of the Cybertruck order backlog, production will be extended through the end of summer 2027.”

Tesla has already attempted to simplify its last months of production for the Cybertruck by eliminating several trim levels and only offering the Cyberbeast, the most expensive trim that starts at $109,990. The other two trim levels, the Cybertruck All-Wheel-Drive and Premium All-Wheel-Drive have both been discontinued.

There has been plenty of backlash against Tesla’s decision to ax the Cybertruck, but the company’s forecast prioritizes Cybercab and autonomy. Factory space at Gigafactory Texas that is not necessary is now being set aside for the Cybercab as the company truly embraces its “transportation-as-a-service” model.

There is still a slim chance the Cybertruck survives. Last evening, Tesla upfitter Unplugged Performance offered to take the Cybertruck line off of Tesla’s hands and continue building it, along with a CyberSUV.

Nevertheless, Tesla seems to be ending the Cybertruck on its terms after what will be a three-and-a-half-year run. It still does not really feel quite real; I think many of us thought the Cybertruck would be around for years to come.

Musk added more detail, stating that while it was not the smartest move, “there must be some room in this world for sentimentality or what’s the point?”

Other EV pickups on the market have experienced a similar fate.

The Ford F-150 Lightning was axed by the Detroit company due to the continued losses the company took from sales. That truck was never profitable, and Ford is still taking a quarterly loss in its EV side. However, things are moving along as it has plans for a mass market EV pickup, which will likely gather some substantial demand if Ford can get it just right.

Perhaps another extension or even a total change of heart might come. Only Musk knows.

Continue Reading

News

Tesla overtakes Waymo in Texas as Robotaxi fleet performs shock flip

Published

on

Credit: Tesla

In a sudden and closely watched milestone, Tesla Robotaxi has edged past Waymo on the Texas Department of Motor Vehicles automated vehicle registry. As of November 10, Tesla lists 1,302 registered vehicles under Tesla Robotaxi, LLC, compared with Waymo’s 1,297.

The flip is narrow, but real, according to the State’s books. Tesla’s Texas fleet, following an expansion on November 10, now consists of 729 Model Ys and 573 purpose-built Cybercab vehicles. Waymo’s roster is dominated by the Jaguar I-PACE and a growing number of Zeekr-based Ojai minivans.

Those figures come from the same public TxDMV automated vehicle listings that independent trackers have monitored since a Texas law required operators to disclose fleet sizes.

The scale of Tesla’s climb is pretty interesting and shows how much the company has grown its autonomous ride-hailing fleet over the past months. When the registry first became public in late May 2026, Tesla listed just 42 vehicles on it. Meanwhile, Waymo had several hundred vehicles registered to it.

Tesla CEO Elon Musk shades Waymo: ‘Never really had a chance’

Since then, Tesla has multiplied its authorized Texas fleet more than thirty times, driven by repeated Model Y additions and a steady build of Cybercabs. Waymo has also expanded, but at a slower pace than Tesla.

It is also important to note that registrations are not necessarily equal to operational fleet. The TxDMV list shows the number of vehicles each company is permitted to run, but it does not report how many are actively carrying riders, which cities they serve, or trip volume. Both companies stage vehicles and run mixed fleets that can include units in testing or temporarily offline.

A lead on the registry therefore signals capacity and regulatory positioning more than immediate ride volume.

Tesla has use the growing authorized fleet to expand its unsupervised service beyond the original Austin geofence area, as now it is flowing into cities like San Antonio and Dallas. The company has highlighted plans for a broader Cybercab deployment, eventually into new states and territories.

Waymo is operating across multiple Texas markets and in other areas of the United States.

Right now, the five-vehicle margin is thin and could reverse with the next large registration from either side. For the moment, however, the public Texas record shows Tesla holding the larger authorized Robotaxi fleet in the state.

Continue Reading