News
Tesla lands new partnership with Uber as Semi takes center stage
Tesla and Uber will work together, using the company’s all-electric Semi, to make sustainable Class 8 electric trucks more affordable with three main strategies: Subsidized Pricing, Predictable Growth, and Optimization of Utilization.
The Tesla Semi has led to a new partnership between the company and Uber, as the two are launching a program that aims to revolutionize logistics by making sustainable commercial vehicles more accessible.
Uber announced on Tuesday that it was planning to launch the Dedicated EV Fleet Accelerator Program in a new partnership with Tesla. Uber’s Freight division is mainly responsible for the new program, which it calls a “first-of-its-kind buyer’s program designed to make electric freight more affordable and accessible by addressing key adoption barriers.”
Tesla and Uber will work together, using the company’s all-electric Semi, to make sustainable Class 8 electric trucks more affordable with three main strategies: Subsidized Pricing, Predictable Growth, and Optimization of Utilization.
- Subsidized Price: Fleets purchasing Tesla Semis through this program will receive a subsidy on the purchase price.
- Predictable Growth: Fleets will integrate their Tesla Semis into Uber Freight’s dedicated solutions for shippers for a pre-determined period. This creates an opportunity for carriers to forecast revenue with confidence, while shippers gain consistent access to reliable, zero-emission capacity.
- Optimize Utilization: Uber Freight taps into its extensive freight network to match carriers with consistent, high-quality freight from our strong shipper base—helping ensure the addition of these Tesla Semis stay fully utilized and carriers see dedicated, real, measurable returns from the start
Tesla will work directly with interested companies to iron out technical details about the Semi, as well as its cost of ownership based on the tailored needs of their business. Fleets can expect savings on the first day, Uber says, as they will avoid diesel fuel costs and reduced maintenance, a widely known advantage of EVs.
Uber announced that it had partnered with select carriers to pilot the Dedicated EV Fleet Accelerator Program prior to its launch:
“During the 2-month pilot program, the Tesla Semis showcased both reliability and efficiency for Uber Freight’s shipper network. Over 394 hours of drive time, carriers covered 12,377 miles. With an average net energy consumption of just 1.72 kWh per mile and only 60 hours of total charge time, these results highlight the operational viability of Tesla Semis on demanding freight lanes. “
In its press release launching the program, Uber effectively highlights how the use of the Semi can impact a company’s margins and profitability through fuel savings, reduced maintenance costs, and lower total cost of ownership.
This is something that turns so many people away from gas cars and toward EVs, so it’s no surprise that Uber wanted to emphasize this point on a larger scale with a company that utilizes a fleet of vehicles.
Tesla Semi shows strong results in ArcBest’s real-world freight trial
Tesla has been experimenting with a select group of companies, as well. It partnered with PepsiCo. several years ago, in an effort to launch a pilot program for the Semi. It had excellent results, showing higher efficiency, lower costs, and an exceptional ability to handle long runs.
Drivers have had a lot of positive things to say:
The Semi will enter mass production next year, but we anticipate that some companies will commit to Uber’s new platform well before then.
Featured
Tesla finally got its Nevada Robotaxi Permit but with a few catches hard to miss
Nevada granted Tesla’s robotaxi permit, but capped the fleet at just ten vehicles for now.
Tesla has received its robotaxi permit in Nevada, more than two months after regulators closed the public comment period on the company’s application. News of the approval surfaced Wednesday night when Tesla investor and longtime company watcher Sawyer Merritt posted a copy of the interim order, and the Nevada Transportation Authority’s own carrier registry now lists the permit, AVNC Permit 002 under Docket 26-05015, as active for Tesla Robotaxi, LLC.
Tesla asked Nevada in June for authority to run up to 5,000 vehicles in Clark County within a year, however the permit the NTA issued is initially capping Tesla at ten fully autonomous vehicles and confines them to a defined geofence along the Las Vegas Strip corridor. Any expansion of that operating area, or any increase to the fleet size, requires the NTA’s approval first.
Tesla has received its Autonomous Vehicle Network Company permit in Nevada.
The Nevada Transportation Authority says that operations are limited to a maximum fleet of 10 fully autonomous vehicles and shall be conducted only within the Authority-approved Operational Design… https://t.co/Cxfd6GIfDk pic.twitter.com/iOO6wSZkHF
— Sawyer Merritt (@SawyerMerritt) August 13, 2026
The order also sets rules that look more restrictive than what Tesla runs in Austin. Rides are barred on roads with posted speed limits above 45 miles per hour, pickups are off limits within a quarter mile of Harry Reid International Airport without separate authorization, and every vehicle has to carry visible “Robotaxi” markings while notifying riders before each trip that no one is driving. The order also requires “appropriate human supervision”, language that suggests Nevada isn’t ready to let Tesla offer the rides without a safety monitor that it has run in parts of Austin since January. As with standard protocol with robotaxi services, Tesla must report any accident, system failure, or vehicle that becomes stranded on a Nevada road within five business days.
Tesla is entering a market Nevada already knows well. Zoox, the Amazon owned robotaxi company, has run its own autonomous vehicle permit in the state since last year, building up to roughly 100 vehicles and 350,000 rides along the Strip. That history likely explains why the NTA started Tesla at ten cars rather than the fleet size the company asked for. The agency has a template for scaling a permit up once a company proves out its safety record.
Tesla’s Nevada application first surfaced in June, when the company filed for the permit alongside plans for a maintenance hub in southwest Las Vegas. The company has said it won’t meaningfully scale its robotaxi fleet anywhere until FSD v15 ships, expected in late 2026 or early 2027, which makes the ten vehicle cap less of a constraint today than it might look on paper. For now, Tesla has the legal right to start Nevada rides. Whether it starts before FSD v15 arrives is a separate question the permit doesn’t answer.
Energy
Tesla launches Powerwall Lease for affordable home backup
Tesla Energy has introduced the Powerwall Lease in conjunction with Tesla Electric, making the service available in Texas. This new option delivers whole-home backup power using two Powerwall units for a net monthly cost of $35 after credits, accompanied by a low fixed electricity rate.
Under the lease terms, customers pay a one-time order fee of $100. The base lease payment for the two Powerwalls is approximately $122 per month during the first year, subject to a 3 percent annual escalator thereafter. Enrollment in a qualifying Tesla Electric Backup plan or Virtual Power Plant plan provides an $87 monthly credit.
Powerwall Lease is now available with Tesla Electric in Texas
Whole-home backup for $35/month, with a low fixed electricity rate
– Two Powerwalls, $0 installation
– Storm Watch outage protection
– One app to manage it all pic.twitter.com/oTzqc6K3aF— Tesla Energy (@teslaenergy) August 13, 2026
This credit lowers the effective cost to roughly $35 per month plus applicable tax.
Installation of the standard system carries no additional charge. The package features Storm Watch for outage protection and allows complete management through a single Tesla application. The system supplies continuous whole-home backup capability.
The Powerwall system enables households to maintain electricity during severe storms that disrupt the utility grid. When outages occur, the batteries automatically provide seamless backup power to the home.
Tesla announces 100k Powerwalls are participating in Virtual Power Plants
Tesla Storm Watch monitors weather forecasts and ensures the units are fully charged ahead of anticipated severe weather events so that power remains available throughout the disruption, keeping lights, refrigeration, and other essential systems operating without interruption.
Availability is restricted to select Texas locations where retail electric choice exists. Participants must lease exactly two Powerwall units and maintain continuous enrollment with Tesla Electric. Solar panels cannot be included under this particular lease arrangement.
The monthly credit activates automatically once the system is installed, receives permission to operate, and enrollment is confirmed. To retain the credit, customers are required to stay enrolled in Tesla Electric and fulfill all program conditions.
Nonstandard installations that involve electrical upgrades or special permitting may lead to extra expenses and might impact eligibility for the credit, so be sure to check with either your installer or Tesla to ensure you will still qualify.
News
Elon Musk teases Tesla Roadster unveiling once again
Elon Musk continues to tease the unveiling event for the Tesla Roadster, a continuing trend that has grown into a bigger game of “When” for fans who have been waiting years for the car to finally enter production.
A video shared on X of the Joe Rogan Experience podcast that Musk appeared on last year, teasing the Roadster unveiling, was shared once again on the social media platform. The poster said the Roadster event will be “unforgettable.”
Musk agreed:
Yes
— Elon Musk (@elonmusk) August 12, 2026
The timing is interesting because just yesterday, Musk said that we will be getting flying cars, and for years, Tesla has hinted that it could develop a SpaceX cold gas thruster package that would help the car float or fly for a short period of time.
It would be reasonable to assume Tesla’s major delays with this unveiling event are likely caused by the company’s need to break the rules and push the envelope on nearly everything. Last July, Lars Moravy, Tesla’s VP of Vehicle Engineering, said:
“Roadster is definitely in development. We did talk about it last Sunday night. We are gearing up for a super cool demo. It’s going to be mind blowing. We showed Elon some cool demos last week of the tech we’ve been working on and he got a little excited.”
The latest updates that Tesla has given us are that the Roadster is in design development, and it did have several potential dates for an unveiling event this year, including April. It was then pushed to August.
However, there are no clues as to when Tesla will be ready, and fans are certainly getting frustrated with the delays.
For what it is worth, Franz von Holzhausen told Jay Leno this week that the event would be “very soon.”
We sure hope.
