Connect with us

News

Tesla rolls out software update – labeled ‘recall’ – to 55k Model X vehicles

Credit: Tesla

Published

on

Tesla rolled out an over-the-air (OTA) software update to almost 55,000 Model X units this week, due to an issue in which a vehicle controller malfunctioned and the car failed to warn drivers of low brake fluid.

The National Highway Traffic Safety Administration (NHTSA) announced a recall on 54,676 Tesla Model X vehicles on Tuesday built between 2021 and 2023, due to vehicle controllers failing to detect low brake fluid and subsequently not displaying a warning light (via Reuters). Tesla deployed a free OTA update to the vehicles to fix the issue.

In the recall document, the NHTSA says the controller failure “may impact braking performance and may increase the risk of a collision.” As for the cause of the issue, the document states that the “vehicle controller’s set threshold range for the sensor may not be set to the correct range at low brake fluid levels.”

As of October 10, Tesla says it isn’t aware of any accidents, injuries or fatalities as a result of the malfunction. The automaker discovered the problem in September and worked with the Brakes Integration Team to identify and fix the set threshold range.

Advertisement

Tesla stores and service centers will be notified, though Tesla software update 2023.32.7 or later will fix the setting, according to the document.

You can read the NHTSA’s full recall notice here, complete with a chronology of Tesla’s discovery and response to the malfunction.

Some have criticized the use of the word “recall” in cases where Tesla or other automakers don’t need to perform any physical maintenance to fix a given problem. CEO Elon Musk criticized the use of the word recall in February, and he called the term “outdated and inaccurate” regarding these kinds of cases last fall.

In the past, Tesla has often fixed so-called recalls by deploying an OTA update to the involved vehicles, which the cars then download and install — and often well before the NHTSA can officially send notice letters to them.

Involved Model X owners will still receive letters regarding the brake fluid controller recall notice, which the agency says will be mailed out by December 12. The related recall number is SB-23-00-005.

Tesla-style Over-the-Air updates will save OEMs $1.5B: research

Advertisement

What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send your tips to us at tips@teslarati.com.

Zach is a renewable energy reporter who has been covering electric vehicles since 2020. He grew up in Fremont, California, and he currently lives in Colorado. His work has appeared in the Chicago Tribune, KRON4 San Francisco, FOX31 Denver, InsideEVs, CleanTechnica, and many other publications. When he isn't covering Tesla or other EV companies, you can find him writing and performing music, drinking a good cup of coffee, or hanging out with his cats, Banks and Freddie. Reach out at zach@teslarati.com, find him on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Advertisement
Comments

News

Tesla unveils juicy new detail on the Roadster and hints at new unveil timeline

Published

on

A red Tesla Roadster driving around a turn
(Credit: Tesla)

Tesla unveiled a juicy new detail on the Roadster, its long-delayed supercar project, and additionally hinted at a new unveiling timeline, as it appears yet another month will pass without seeing the capabilities of the vehicle.

Vice President of Vehicle Engineering at Tesla, Lars Moravy, revealed on the Ride the Lightning podcast that the Roadster will be built at Gigafactory Texas, adding that “you’ll start to see a lot of things unfold in the next months.”

While we get a good detail on the plant of manufacture, we also get another letdown, as it appears the unveiling event will not take place in May, as CEO Elon Musk hinted during the Earnings Call.

The Roadster was first unveiled back in 2017, alongside the Semi, which entered production earlier this year. It was Tesla’s attempt at a true supercar; it would be rare, expensive, and lightning quick, among other incredible capabilities, like potentially hovering for a short period thanks to a collaboration project with SpaceX.

However, the vehicle was set to be delivered in 2020. Parts and supply chain issues due to the COVID-19 pandemic started these delays, and since then, Tesla, and specifically Musk, have wanted to push the capabilities of the Roadster to somewhere the human mind may not be able to currently comprehend.

Both Chief Designer Franz von Holzhausen and Moravy have said many things about the Roadster over the past few years, hinting that the car truly could be worth the wait. However, the continuous delays we’ve seen have undoubtedly been discouraging.

Advertisement

With that being said, it’s not like Tesla has been doing nothing. Instead, the company has been focusing on revamping current models, phasing out others, and working on developing the cars of the future, specifically, the Cybercab, which entered production at Giga Texas in April.

Despite the Roadster’s delays, there is still a ton of anticipation for the vehicle to be released. It will have a steering wheel, as Musk said it will be “the best of the last of the human-driven cars.”

Continue Reading

Elon Musk

NASA just gave SpaceX more crew missions because Boeing can’t certify

Published

on

By

NASA has filed a procurement notice announcing its intent to add six post-certification missions to SpaceX’s existing Commercial Crew Transportation Capability contract. The agency said it would order up to three of those missions immediately upon adding them to the contract, with the remaining three available as needed through the end of the International Space Station’s planned operations in 2030.

The reason for the expansion is straightforward. NASA cited recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, and the ongoing technical challenges of maintaining a reliable crew transportation capability as the driving factors behind the decision. Boeing’s CST-100 Starliner has still not been certified for crewed flights, and a cargo-only Starliner mission was not included on NASA’s most recent mission manifest. With Boeing effectively sidelined for the foreseeable future, SpaceX is the only American company capable of rotating crews to the station.

SpaceX Board has set a Mars bonus for Elon Musk

The history behind this contract tells the fuller story of how SpaceX got here. NASA originally awarded SpaceX its Commercial Crew contract in 2014 for $2.6 billion. In 2022 NASA modified the contract to add five missions covering Crew-10 through Crew-14, worth $1.436 billion, bringing the total contract value at that point to $4.9 billion. The recent May 18 filing by NASA extends that runway further, with Crew-12 currently docked at the station and Crew-13 assigned and targeting a mid-September 2026 launch.

Advertisement

According to a report by SpaceNews, NASA stated in its filing: “It is necessary to award additional PCMs to SpaceX given the recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, NASA’s projections for when an alternative crew transportation system may become available, and the ongoing technical challenges of maintaining a reliable capability for crewed flights to ISS.”

No dollar value for the new six missions has been publicly confirmed yet, but based on the 2022 precedent of roughly $287 million per mission, the new block could represent close to $1.7 billion in additional contract value. With SpaceX simultaneously preparing Starship as NASA’s Artemis lunar lander, filing its S-1 for a June IPO, and now absorbing more ISS crew rotation work, the company’s role as the primary contractor for American human spaceflight is no longer a matter of circumstance. It is NASA policy.

Continue Reading

Energy

Zuckerberg’s Meta taps Musk’s Tesla for massive clean energy project

Published

on

Credit: Tesla

In a notable intersection of Big Tech powerhouses, Meta, led by Mark Zuckerberg, has partnered with Canadian energy infrastructure giant Enbridge on a significant renewable energy initiative that will rely on battery technology from Elon Musk’s Tesla.

The project, which was announced this week, marks another step in Meta’s aggressive push to power its expanding data center operations with clean energy, dispelling many of the complaints people have about them.

This new development is located near Cheyenne, Wyoming, and will feature a 365-megawatt (MW) solar farm paired with a 200 MW/1,600 megawatt-hour (MWh) battery energy storage system, also known as BESS. Tesla is providing the batteries for the project, valued at roughly $200 million.

The story was originally reported by Utility Dive.

Advertisement

This Wyoming project represents the first phase of Enbridge and Meta’s joint “Cowboy Project.” Once operational, it will deliver power to Meta’s regional data centers through Cheyenne Light, Fuel, and Power under Wyoming’s Large Power Contract Service tariff.

This tariff, originally developed in collaboration with Microsoft and Black Hills Energy, is designed specifically for large loads like data centers. It ensures that the renewable supply serves hyperscale customers without impacting retail electricity rates for other users.

The battery system will operate under a long-term tolling agreement, providing dispatchable capacity that enhances grid reliability. During periods of high demand, the utility can access the backup generation, addressing one of the key challenges of integrating large-scale renewables with the explosive growth of data center electricity demand driven by artificial intelligence.

This latest collaboration builds on prior joint efforts between Enbridge and Meta in Texas, including the 600 MW Clear Fork Solar, 152 MW Easter Wind, and 300 MW Cone Wind projects. Together with the Wyoming initiative, the companies have now partnered on roughly 1.6 gigawatts (GW) of combined solar, wind, and storage capacity.

Advertisement

The deal highlights the intensifying demand for reliable, low-carbon power from technology giants. Meta has committed to supporting its data center growth with renewable energy, joining peers like Microsoft and Google in seeking large-scale solutions. Enbridge’s Allen Capps described the project as “one of the larger utility-scale battery installations supporting U.S. data center operations and growth.”

The involvement of Tesla’s battery technology adds an intriguing layer, linking two of the world’s most prominent tech leaders—Zuckerberg and Musk—in the clean energy transition.

As data centers continue to drive unprecedented electricity load growth across the United States, projects like this one illustrate how hyperscalers are turning to strategic partnerships with traditional energy players and innovative storage solutions to meet both sustainability goals and reliability needs.

Advertisement
Continue Reading