Connect with us
tesla giga shanghai production tesla giga shanghai production

News

Tesla will need to ‘rally hard to recover’ from ‘very tough quarter,’ Musk says in internal email

Tesla Model 3 production line in Gigafactory 3, Shanghai, China. (Credit: Tesla)

Published

on

Tesla will need to “rally hard to recover” from a “very tough quarter,” according to CEO Elon Musk’s internal email sent to employees last night. Tesla battled extensive shutdowns at its most productive manufacturing plant Gigafactory Shanghai earlier this quarter, which will require an extra push of effort from employees as Q2 comes to a close.

“This has been a very tough quarter, primarily due to supply chain and production challenges in China,” Musk said in an email to Tesla workers, which was first seen by Electrek. “So we need to rally hard to recover!”

2022’s second quarter was anything but normal for most automakers, Tesla included. While the industry as a whole continues to struggle with supply chain issues and materials shortages, Tesla felt the effects slightly harder than other car companies. Tesla’s Gigafactory Shanghai facility was closed for three weeks in April due to a widespread lockdown in China after a spike in COVID-19 cases. Tesla reported a 97.7 percent decrease in production from March to April due to the shutdown. Tesla sold 65,814 units in March and just 1,512 units in April as lockdowns kept the factory dormant for three weeks.

Tesla Gigafactory Shanghai to exit “closed-loop” system on June 11

Now that Shanghai has returned to full operating capacity, Musk is pushing for the ccompany’sworkers to dig a little deeper with just seventeen days left in Q2. Musk said the Fremont factory achieved an all-time record production day recently, and Berlin made nearly 1,000 units last week. “Shanghai is returning to full strength and Austin is spooling up. Onward to victory!” Musk said in the email.

The employment situation at Tesla has required Musk to eliminate work-from-home positions as a company-wide email that followed a communication to only company executives said workers will be required to spend 40 hours per week at their local Tesla branch.

Advertisement
-

“Everyone at Tesla is required to spend a minimum of 40 hours in the office per week. Moreover, the office must be where your actual colleagues are located, not some remote pseudo office. If you don’t show up, we will assume you have resigned,” Musk said in an email to all Tesla employees on June 1.

The sudden push for in-office work may have something to do with Tesla’ssomewhat regularly-planned end-of-quarter delivery and production blitzes, which require an all-hands-on-deck attitude to accomplish. Musk has even joined production lines to assist Tesla in maintaining manufacturing growth, and Musk more than certainly knows that the automaker’s streak of nine consecutive quarters of growth in deliveries is in jeopardy following Shanghai’sshutdown.

I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

News

NHTSA just escalated its Tesla Cybercab investigation in a big way

NHTSA escalated its Cybercab audit into a sworn Special Order with a September 30 deadline.

Published

on

By

Federal regulators have moved from asking Tesla questions about its Cybercab to demanding sworn answers. The National Highway Traffic Safety Administration issued a Special Order that requires a Tesla officer to sign an affidavit attesting to the completeness of the company’s responses, with a deadline of September 30.

The order builds on Audit Query AQ26002, which NHTSA opened on September 3, the same day Tesla began commercial Cybercab service in Austin. Teslarati covered that initial inquiry when it surfaced, noting the agency wanted to understand how Tesla certified a vehicle with no permanently attached steering wheel, pedals, or mirrors as compliant with Federal Motor Vehicle Safety Standards. A Special Order is a different tool and converts a fact finding review into a legally enforceable demand, the same mechanism NHTSA used against Tesla in 2023 during its Autopilot investigation.

Several of the 21 requests target a specific gap in Cybercab’s design. One asks whether Tesla used temporarily attached human controls at any point to help certify the vehicle, and if so, which standards depended on that equipment being present. Another quotes an existing rule directly: “The service brakes shall be activated by means of a foot control.” Cybercab has no foot pedal. NHTSA wants a detailed explanation of how the vehicle satisfies that requirement, and how it complies without the kind of exemption granted to Zoox in July under Part 555, the regulatory pathway built for steering wheel free vehicles.

The order does not claim Cybercab is unsafe or that Tesla broke a rule. It requires Tesla to explain, under oath, the reasoning behind decisions the company already made when it self-certified the vehicle. That distinction matters, but so does the exposure. Motor1’s reporting, summarized here, put potential civil penalty exposure as high as $139 million if NHTSA later finds the certification was flawed, on top of whatever criminal risk comes with a false sworn statement.

Tesla has not said publicly how it plans to respond. Cybercab is still carrying passengers in Austin through the Robotaxi app while the September 30 deadline approaches, and the company has continued expanding the vehicle’s footprint even as the regulatory question remains open. The Special Order does not pause any of that and just sets a date by which Tesla has to put its certification logic on the record, with a company officer’s name attached to it.

Continue Reading

Investor's Corner

Tesla uber bull Ron Baron says ‘the time to buy the stock is now’

Published

on

Credit: Tesla

In a new interview on Wednesday, Tesla uber bull Ron Baron said that anyone looking to buy the company’s stock should do so as soon as they can.

Baron, founder and CEO of Baron Capital and one of Tesla’s most persistent institutional bulls, used a CNBC Squawk Box appearance on Wednesday to deliver a familiar message with fresh urgency: In his opinion, Tesla stock is a buy:

“The time to buy the stock is now. FSD is catching on, and it’s going to be bigger and bigger. 55% of new buyers are buying it (Teslas) with FSD. It’s going to be everywhere. It’s safer.”

The Baron Capital frontman’s case is built around Full Self-Driving. Tesla reported 1.48 million active FSD subscriptions in the second quarter, up 56 percent year over year, and company officials have said roughly 55 percent of new North American deliveries left with a subscription enabled.

Baron framed that attach rate as proof the product is moving from enthusiast extra to default expectation, and as a reason software, not just vehicle volume, should drive the next phase of value.

His conviction on Tesla shares is not theoretical, as Baron Capital made its first Tesla investment in 2014, after years of meetings that began around the 2010 IPO roadshow. The firm later built a large SpaceX position starting in 2017.

Advertisement
-

Baron said those Musk-led bets have generated about $30 billion of the $71 billion in profits Baron Capital has produced for clients. He put the firm’s current exposure at roughly $25 billion in SpaceX and $5 billion in Tesla. Personally, he described SpaceX as his largest holding, at about $5 billion, with about $1.5 billion in Tesla and additional Tesla exposure through the firm’s funds.

That concentration is also a statement of loyalty. Asked about talk of a SpaceX-Tesla combination, Baron said he had already walked Elon Musk through arguments for and against a deal, then declined to repeat them on air. His public position was simpler: “Whatever you decide is better is what I’m going to support,” he said to Musk.

Baron also said that he picked up the farewell edition of the Model S after Tesla decided to sunset the vehicle earlier this year, calling it his favorite car he’s ever driven.

Advertisement
-
Continue Reading

Elon Musk

SpaceX’s next Starship launch is about to attempt its biggest leap yet

SpaceX targets September 22 for Starship Flight 14, its first attempt to reach real orbit.

Published

on

By

SpaceX has set September 22 as the target date for Starship’s 14th test flight, and this one carries a different goal than any of the 13 that came before it. Every previous Starship mission has intentionally flown a suborbital arc, reentering the atmosphere within the same hour it launched. Flight 14 is designed to send the craft into a genuine orbit around Earth for the first time.

The launch window opens at 7:15 a.m. Central time at Starbase in South Texas and runs for 75 minutes, pending regulatory approval, according to SpaceX’s mission description published Tuesday. If the flight goes as planned, Starship will circle the planet roughly six times at an altitude near 275 kilometers over about ten hours before a deorbit burn sends it toward a splashdown in the Pacific Ocean west of Chile, a departure from the Indian Ocean recoveries used on the last several flights.

The mission also marks the first attempt to put a working batch of Starlink V3 satellites into actual service. Flight 13 carried 20 of the new satellites in July, but because that mission never left a suborbital trajectory, the payload reentered along with the ship instead of separating into orbit.

SpaceX tells the FCC that Starship Flight 14 is going to orbit

Each V3 satellite is rated for roughly one terabit per second of downlink capacity, so a successful deployment on Flight 14 would be SpaceX’s largest single jump in network bandwidth since Starlink began flying on Falcon 9.

Flight 13 still did the heavier lifting on the technical side. That July mission flew a deliberately more stressful reentry profile to test Starship’s heat shield, and the ship survived its softest splashdown yet, intact enough for drone inspections shortly after landing. Elon Musk said the flight delivered “all the heat shield data we needed and then some,” a result Teslarati covered in detail when he later said SpaceX had solved the vehicle’s biggest reusability challenge. Flight 14 is where SpaceX starts spending that confidence on an actual orbital insertion rather than another controlled fall back to Earth.

Advertisement
-

One thing Flight 14 will not attempt is a tower catch of the ship. Musk floated the idea right after Flight 13, but walked the timeline back in August, saying a catch attempt was more likely “in a few months.” The Super Heavy booster will still aim for its own recovery, targeting an offshore landing point in the Gulf of America, the same approach used on recent flights.

September 22 is SpaceX’s own target, not a locked date. Starship’s schedule has slipped before over hardware readiness and FAA sign off, and the company has said as much in its own mission notes. But the plan itself represents the clearest marker yet that Starship is moving from a suborbital test program into something meant to carry paying payloads and, eventually, people.

Continue Reading