Connect with us

News

Tesla Model S refresh units spotted in Fremont Factory ahead of customer deliveries

Credit: The Kilowatts/Twitter

Published

on

Tesla’s efforts to produce the Model S refresh seem to be making some headway, with recent videos of the Fremont Factory showing what could very well be the first production units of the all-electric flagship sedan. While Tesla’s deliveries for the Model S refresh are looking to be a bit later than Elon Musk’s February estimate, customer deliveries seem to be coming soon. 

The new Model S refresh units were spotted during a recent visit to the Fremont Factory by electric vehicle advocates Ryan Levenson of The Kilowatts and Model 3 owner Arash Malek. During their short visit, the EV enthusiasts were able to observe a red Model S refresh being driven around the Fremont Factory area. Unlike the test vehicles that have been spotted in the wild recently, the Model S in question was fitted with some window trim wrap and bar code stickers, hinting that they are not intended for simple road tests. 

Another Model S refresh was sighted alongside Tesla’s other vehicles in the Fremont Factory’s holding lots. While the car was a bit difficult to see amidst the sea of Model 3s in the area, several Model S refresh elements were visible in the car, such as its blacked-out trim and updated bumper design. Similar to the red unit spotted driving around the factory, the Model S refresh in the parking lot also had bar code stickers, a potential indicator that the vehicle is intended to be delivered to customers. 

What is quite interesting is that so far, the two new Model S refresh sighted in Fremont were equipped with a round steering wheel. This is quite interesting considering that Elon Musk and Tesla have made it a point to emphasize that the Model S refresh would be fitted with a yoke steering system, a rather controversial set of steering controls that have so far been greenlighted in numerous European countries. 

Advertisement
-

The Model S refresh sightings come at a time when rumors have emerged alleging that Tesla is running into some delays at the Fremont Factory due to a shortage of chips from Samsung, which supplies parts for the Full Self-Driving computer. Samsung’s operations in its Austin fabrication facility were disrupted last week due to the state’s widespread power outages. That being said, reports have also mentioned that Model 3 production is still at around 800 units per day, which should help keep the facility productive while it waits for the chip shortages to subside. 

Elon Musk has noted that the Model S refresh will start customer deliveries in February. While accomplishing this target may seem unlikely considering that the month is almost at its end, the presence of what appear to be production Model S refresh vehicles in the Fremont Factory means that Tesla is indeed working on getting its revamped flagship sedan to customers as soon as possible. 

Watch a video of a production Model S refresh on the road in the video below. 

https://youtu.be/_cFHRKiXvVc?t=187

Advertisement
-

Don’t hesitate to contact us for news tips. Just send a message to tips@teslarati.com to give us a heads up. 

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

News

Tesla’s surprise Roadster video hints the 2017 design is gone

Tesla ended its Semi event with a Roadster teaser revealing a new front light bar.

Published

on

By

Tesla Battery Day event (Credit: Ryan McCaffrey/Twitter)

Tesla closed out its Semi event in Nevada on Thursday night with a nod to its own history, dropping a short Roadster teaser that suggests the production car will look noticeably different from the prototype first shown in 2017.

“We can’t have a Semi event without the Roadster,” Tesla engineering executive Lars Moravy told the crowd before the clip played. The line was a deliberate callback. Tesla first revealed the next generation Roadster in November 2017 by driving it out of the back of a Semi trailer at the truck’s original unveiling in Hawthorne, California.

The new video opens on trailer doors swinging apart in the dark. A thin white light bar glows across what appears to be the nose of the car, Tesla and SpaceX logos flash over the frame, and the Roadster name appears before the clip ends on “See you next week.” Tesla posted the nine second clip on X after the livestream wrapped.

The light bar is the most concrete design detail so far. The 2017 prototype used two separate curved headlamp pods, while a connected front light strip would bring the Roadster in line with the Cybertruck, Cybercab, Semi, and refreshed Model Y. Sawyer Merritt was among the first to point out what looked like part of a SpaceX logo in the video, something Tesla has not addressed.

Advertisement
-

That logo fits the buildup around the optional SpaceX Package, which Elon Musk has long said would use cold gas thrusters to improve acceleration and possibly allow the car to briefly leave the ground. Tesla’s “Go for launch” post on September 12 set the October 1 date, and invitations sent to reservation holders place the event in Waco, Texas, at 8:30 p.m. Eastern. Waco sits roughly 20 minutes from SpaceX’s McGregor rocket test site, where the FAA has put a temporary flight restriction in place from September 18 through October 2, covering a 1.5 nautical mile radius from the surface up to 10,000 feet.

Tesla is also taking money ahead of the reveal. The company reopened Roadster reservations earlier this week with a $5,000 refundable card payment, followed by a $45,000 wire transfer due within 10 days. That puts buyers at $50,000 committed before Tesla has published a price.

The original pitch set a high bar: 0 to 60 mph in 1.9 seconds before any upgrades, 620 miles of range, a top speed above 250 mph, and production in 2020. That timeline has slipped repeatedly, and Tesla has since pointed to production at Gigafactory Texas no earlier than 2027. The company has said next Thursday’s event will include pricing, specifications, and production targets, the three details original reservation holders have been waiting on for nearly nine years.

Continue Reading

News

Tesla Full Self-Driving release in the EU gets delayed

Published

on

Credit: Grok Imagine

Tesla Full Self-Driving’s release in Europe is set to be delayed by at least a few months.

The European Union will not vote on Tesla’s Full Self-Driving (Supervised) on October 6. The draft agenda for the 119th meeting of the Technical Committee on Motor Vehicles lists only a 25-minute “continuation of discussions” on the Netherlands’ Article 39 request, not a decision. The next scheduled TCMV session is in December, which is now the earliest date a bloc-wide vote could occur.

Tesla Europe had pointed to October 6 as a possible EU-wide vote after the Dutch vehicle authority RDW granted the first European type approval on April 10.

That approval, under UN Regulation 171 plus an Article 39 exemption in EU Regulation 2018/858, is the legal file other member states have been recognizing one by one. The same committee has already discussed the request twice without voting.

Elon Musk’s reply to the delay was a single word: “Sigh.”

Seven EU countries have now cleared FSD Supervised on their own roads: the Netherlands, Lithuania, Estonia, Denmark, Belgium, Slovenia, and Czechia. Those seven states represent about 53 million people, or roughly 12 percent of the EU population. An EU-wide authorization still needs a qualified majority: at least 15 of 27 member states representing 65 percent of the bloc’s population, about 292 million people.

Germany, France, Italy, and Spain remain the decisive markets. France has already rejected the current system; several other governments have flagged speed-limit compliance as the main sticking point.

The safety case Tesla is putting in front of those governments is now public. On September 1, Tesla Europe said FSD Supervised was in use by more than 70,000 customers, covering over 1 million kilometers a day, and was 4.1 times less likely to be involved in a crash than manual driving across 100 million kilometers on EU public roads.

An earlier mid-year cut of the same fleet data, covering 65 million kilometers in five approved countries, put the collision advantage at 5.2 times, with zero highway collisions over 41.9 million kilometers. Tesla also reported far fewer automatic emergency braking events, harsh accelerations, and hard swerves than in comparable manual Tesla driving. Those figures are company-reported, not independently audited.

Tesla Full Self-Driving is taking over Europe: fourth country gets FSD approval

Advertisement
-

The public-health backdrop is harder to dispute. European countries recorded about 19,400 road deaths in 2025, or roughly 53 a day, most of them attributed to human error. FSD Supervised is not unsupervised autonomy; the driver remains legally responsible. But the software is already legal and in daily use across seven member states.

Until TCMV votes, the rest of the EU remains a patchwork: available in Prague and Amsterdam, locked behind review in Paris and Berlin. December is now the next chance to close that gap.

Continue Reading

News

SpaceX readies Starship Flight 14 for a historic journey into uncharted territory

SpaceX finished Starship’s Flight 14 rehearsal, clearing the way for its first orbital flight Monday.

Published

on

By

Sunrise at Starbase. Starship is stacked for opportunistic full-stack testing ahead of Flight 14 via SpaceX
Sunrise at Starbase. Starship is stacked for opportunistic full-stack testing ahead of Flight 14 via SpaceX

SpaceX has cleared one of the last hurdles before Starship’s first trip to orbit. The company posted on X Thursday afternoon that its launch rehearsal for Flight 14 was complete, keeping the mission on track for Monday, September 28. The launch window opens at 7:15 a.m. CT at Starbase, Texas, and runs for 75 minutes.

A wet dress rehearsal is essentially launch day without the launch. Crews fill Booster 21 and Ship 41 with thousands of tons of extremely cold propellant, run the countdown nearly to ignition, then drain everything back out. It lets engineers catch leaks or equipment problems before anything leaves the pad. SpaceX still needs a launch license from the FAA before the stack, which stands 407 feet tall, can fly.

Flight 14 matters because of where it is going. All 13 previous Starship flights followed a suborbital path, which works like throwing a ball extremely high and far: the vehicle reaches space, but it is always on a course that brings it back down within about an hour. This time, Ship 41 will perform a short engine firing called an orbital insertion burn roughly 25 minutes after liftoff, giving it enough speed to keep falling around Earth instead of back into it. SpaceX plans about six laps at an altitude near 275 kilometers (171 miles) over nearly 10 hours, as Teslarati detailed when the mission was first announced.


Getting into orbit also means Starship has to prove it can get back out. The ship must relight a single Raptor engine in space to slow down for reentry. SpaceX says it will only attempt the orbital insertion burn after flight controllers confirm the hardware needed for that return burn has enough backup, and its flight plan includes health checks that could shorten the mission to two or five orbits.

Flight 14 is also the first to put working satellites into service. Flight 13 carried 20 Starlink V3 satellites in July, but they came back down with the ship because that mission never reached orbit. This time, 26 V3 satellites are meant to stay up and join the constellation within a few weeks. Together they add about 26 terabits per second of network capacity, which SpaceX says is roughly 10 times what a single Falcon 9 launch of older V2 Mini satellites adds. Three of them carry cameras that will photograph Starship’s heat shield in orbit to check for tile damage before reentry.

Advertisement
-

The hardware has changed too. Ship 41 flies with extra fasteners on tiles in the most vulnerable areas, fixes for gaps where superheated plasma slipped behind tiles, and curved tiles designed to reduce heating between them. Two tiles recovered from Ship 40 will fly again, the first reuse of any part of a Starship heat shield. Booster 21 carries better engine filtering and new relight software after ice clogged three center engines on the previous booster, leaving only eight of 13 engines to restart for its landing burn.

Ship 41 is targeting a splashdown in the Pacific Ocean west of Chile, a new recovery zone after several Indian Ocean landings, while Booster 21 aims for the Gulf. Neither will be caught by the tower on this flight. Elon Musk said in August that a ship catch was likely “in a few months.”

Continue Reading