Connect with us

News

USPS says full-EV fleet not possible by 2033, requires $2.3B in additional investments

Credit: USPS TV | YouTube

Published

on

The United States Postal Service said in its December 2021 Environmental Impact Statement report that committing to a fully-electric fleet of 75,000 mail delivery vehicles would require an additional $2.3 billion investment. Additionally, the USPS may not be willing to commit to more than ten percent of its new fleet to electric powertrains as the government agency says it “is not achievable.”

The report was published on January 7th and details potential alternatives to its plan to purchase between 50,000 and 165,000 new vehicles that will “replace existing delivery vehicles nationwide that have reached the end of their service life.” In February 2021, the USPS announced a contract award to Oshkosh Defense, LLC for the production of the “Next-Generation Delivery Vehicles,” or NGDVs. The NGDVs will consist of at least 10 of having battery-electric powertrains. The remainder would have internal combustion engines.

The USPS is considering alternatives for comparison, which include 100 percent of the new vehicles being “commercial-off-the-shelf” (COTS) ICE vehicles, or 100 percent COTS electric cars. These are referred to in the report as Alternative 1.1 and 1.2, respectfully.

The current plan is for the USPS to begin replacing between 50,000 to 165,000 new vehicles. Ten percent will be EVs, at the minimum. The plan will take ten years to complete and will begin in 2023, as the first NGDV will make deliveries sometime in 2023. “The actual timeline and quantities of NGDV purchased and delivery vehicle types replaced would be contingent upon the Postal Service’s operational needs, including individual carrier route needs, and financial position,” the report says.

Advertisement

USPS new vehicles

Credit: USPS

However, it appears unlikely that the USPS will commit to increasing the share of EVs in its fleet due to affordability reasons. In its report, it states that, while it understands BEVs are better for the environment, funding would not allow the USPS to make any significant changes to the current plan. The USPS states that its preferred alternative is actually the Proposed Action, which is to purchase and deploy up to 90 percent ICE NGDVs with 10 percent BEV NGDVs. “This Preferred Alternative is also the most achievable given the Postal Service’s financial condition, as the ICE NGDV is significantly less expensive than the BEV NGDV and does not have the same route length and other operational constraints as the BEVs. Finally, the 90 percent ICE NGDV Preferred Alternative would result in less fuel consumption and reduced direct and indirect greenhouse gas emissions as compared to the existing delivery vehicles being replaced,” the report adds.

Realizing that a full fleet of BEVs is better for the environment, as it would reduce “about 200 percent fewer direct and indirect greenhouse gas emissions than the 90 percent ICE NGDV” plan, the financial situation does not allow for it. The USPS says that “committing to purchase more than 10 percent BEV NGDV as part of the Preferred Alternative is not achievable, absent additional funding, as the 100 percent BEV NGDV Preferred Alternative is $2.3 billion more expensive than the 90 percent ICE NGDV Preferred Alternative for an order of 75,000 vehicles.” If the USPS wanted to transition all 165,000 vehicles to BEV powertrains, it would cost an additional $1 billion.

The USPS does have a third alternative: No action. The Postal Service will likely not commit to this option, but it does state that, “Utility service and infrastructure in place at Postal Service facilities currently are meeting service demands.”

The full report is available below.

Usps+Ngdv+Feis Dec+2021 by Joey Klender on Scribd

Advertisement

I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

NASA’s first human outpost on the Moon starts now – SpaceX on deck

NASA named the rovers, landers, and vendors that will build America’s first Moon Base.

Published

on

By

NASA has laid out its most detailed Moon Base plan to date, describing a permanent outpost near the Moon’s south pole that the agency intends to build over the coming decade as a direct stepping stone to Mars. “The Moon Base will be America’s and humanity’s first outpost on another celestial world,” NASA Administrator Jared Isaacman said, adding that every mission crewed and uncrewed “will be a learning opportunity as we return to the lunar surface, build the infrastructure to stay, and master the skills required to live and operate in one of the most demanding and dangerous environments imaginable.”

The plan is structured in three phases involving both uncrewed and crewed missions to deliver equipment, vehicles, and infrastructure to the surface, with the first three moon base missions targeted to launch before the end of 2026.

Moon Base I, targeting fall 2026, will use Blue Origin’s Blue Moon Mark 1 lander to deliver scientific instruments to the Shackleton Connecting Ridge, the same region where Artemis astronauts will land. Moon Base II will send Astrobotic’s Griffin lander carrying more than 1,100 pounds of cargo including Astrolab’s FLIP rover to begin developing mobility systems on the surface. Moon Base III will carry the Lunar Vertex science mission on Intuitive Machines’ Nova-C Trinity lander to study lunar swirls near the south pole, with ESA and Korean science payloads aboard.

Elon Musk pivots SpaceX plans to Moon base before Mars

Advertisement

 

On the rover side, NASA awarded Astrolab $219 million and Lunar Outpost $220 million to build the first phase of Lunar Terrain Vehicles, with both rovers targeted for deployment to the lunar surface by 2028. Astrolab’s crewed rover weighs roughly 2,000 pounds and can reach over 6 mph. Lunar Outpost’s Pegasus rover can operate autonomously or via remote control at over 9 mph. Blue Origin separately received $188 million with an option worth $280.4 million to deliver cargo landers for rover transport.

NASA also confirmed that MoonFall, a mission deploying four survey drones to scout Artemis landing sites, has selected Firefly Aerospace to build the transport spacecraft, with a 2028 launch target.

SpaceX sits at the center of that commercial layer. SpaceX holds the NASA Human Landing System contract for the Starship-derived lander that will put astronauts on the surface under Artemis IV, currently targeting 2028. Before that can happen, SpaceX must demonstrate in-orbit propellant transfer at scale, a process requiring multiple Starship tanker launches to fuel a single mission. Water ice at the lunar south pole is central to the base’s long-term viability, as it can be converted into drinking water, breathable oxygen, and rocket fuel, directly reducing dependence on Earth resupply. That resource loop becomes far more practical if Starship can land and be refueled on or near the Moon itself.

Advertisement

Elon Musk has publicly stated that Starship V3, which recently completed its first flight, should be capable enough for initial Mars missions. The Moon Base plan announced Tuesday is the infrastructure layer that connects everything between those two ambitions, and SpaceX is the only American company currently contracted to build the rocket that gets humans to either destination.

Continue Reading

News

Tesla patent reveals strategy for solving major Full Self-Driving, Optimus issue

Published

on

Credit: Tesla

A new Tesla patent that has been granted to the company this week has revealed a potential strategy for solving a major issue that could impact both the Full Self-Driving suite and Optimus.

The patent, which is No. 12,636,684, describes a “Lens Cleaning System,” and was submitted by Tesla in May 2025.

The language in the patent details a lens cleaning system that can dispense fluid and wipe it away with a wiper assembly.

This would effectively clean any debris that would potentially impact the visibility of the cameras on Tesla automobiles or Optimus’s camera eyes. Perhaps the most pertinent example is through the Full Self-Driving suite, as debris that can accumulate on the vehicle’s exterior cameras can impact the suite’s ability to operate effectively.

This requires a remedy through manual cleaning, but this patent hints that Tesla could be planning to implement this new technology on its upcoming vehicles.

Advertisement

Interestingly, we have started to see it on some Robotaxi vehicles, and it will likely be included in the Cybercab, especially as that vehicle will enable full autonomy.

Back in January, the first Model Y Robotaxi units were spotted with camera washers on the side repeaters, as the video below shows fluid squirting and rinsing off any debris that is limiting visibility.

Advertisement

This hardware patent does bring up an interesting question for those of us who own Teslas with AI4 and have been told that our cars will one day be capable of full autonomy: Will this washer be available as a retrofit on already-built cars?

Perhaps the “Lens Cleaning System” patent is a good look at one way Tesla plans to combat one of the most obvious issues of autonomy that utilizes a camera-based system. For Optimus, it could be less needed as it could be manually cleaned by owners. For cars, it seems like a bigger necessity, especially as autonomy nears and Tesla gets close to launching a feature-complete FSD suite.

Continue Reading

News

SpaceX Starlink gets its latest airline adoptee, grabbing three of the ‘Big Four’

Published

on

Credit: American Airlines

SpaceX’s Starlink product has just gotten its latest airline adoptee, and the move marks the successful partnership of three of the “Big Four” U.S. airlines.

American Airlines announced on Tuesday that it would utilize Starlink in more than 500 narrowbody aircraft beginning in the first quarter of 2027. These include the Airbus aircraft in its fleet, including the new A321XLR and A321neo.

With the new partnership with American Airlines, Starlink is now present on three of the largest airlines in the country: American, United, and Southwest.

Starlink gets its latest airline adoptee for stable and reliable internet access

Advertisement

Starlink’s VP of Enterprise Sales, Jason Fritch, said:

“We are proud to bring Starlink on board American Airlines, delivering fast and reliable internet to passengers and crew. Whether traveling for leisure or business, Starlink enables a fully connected experience gate to gate, making every flight smoother and more enjoyable.”

Additionally, American Airlines Chief Customer Officer, Heather Garboden, said:

“As a premium global airline, we are continuously seeking out world-class partners like Starlink to deliver what our customers need and want. The addition of Starlink solidifies American as a leading airline in keeping passengers connected in flight.”

Advertisement

Starlink has been on a tear over the past year, as it has continued to be adopted by a wide variety of airlines as a more consistent and reliable way to provide WiFi to its passengers. It has already gained a great reputation among residential users, but its biggest commercial application appears to be how it is being used in the air.

Advertisement

The only airline of the Big Four not to adopt Starlink thus far is Delta, which chose to opt for the alternative, which is Amazon Leo. CEO Ed Bastian said to Bloomberg that Delta chose Amazon’s product over Starlink’s because “the opportunities, in terms of the improved bandwidth with a much lower price point than what we’ve ever seen from Starlink, will make a big difference.”

Delta will not start installing Amazon Leo until 2028.

“Of course, we expect Starlink will be warning people that we’re going to go with an inferior product,” Bastian said. “But I’m not too worried about partnering with Amazon.”

Advertisement
Continue Reading