Connect with us

Investor's Corner

Tesla mega-bull Ron Baron has an aggressive timeline for $25k EV

Credit: @Teslaconomics/X

Published

on

Tesla mega bull Ron Baron has an aggressive timeline for the company’s plans for a $25,000 electric vehicle.

Ron Baron has been one of Tesla’s biggest investors and is one of Elon Musk’s most outspoken believers and supporters. Last week, we detailed his comments on his portfolio’s growth due to Tesla stock and his outlook for SpaceX, Musk’s space exploration company.

Tesla investor who made billions on stock says SpaceX will be bigger

Baron’s sentiments were reiterated during an interview with CNBC this morning when he said that Tesla would start building a $25,000 vehicle within 18 months, an extremely aggressive timeline considering recent comments by Musk.

Advertisement

The Tesla CEO detailed during the Q3 Earnings Call that he expects to be a challenging production ramp for the Cybertruck and how high-interest rates make monthly payments too high for the average consumer.

Offering a new affordable model is the key to unlocking access to new customers and driving Tesla’s yearly production and deliveries toward 20 million units per year.

“Wait ’til you see what’s going to happen when all of a sudden they start selling cars, instead of $40,000 a piece, for $25,000 a piece, which is going to happen in about a year or year-and-a-half,” Baron said.

He also added that Tesla plans to build 5 million units a year of the “Model 2,” which is what he referred to the $25,000 as.

Advertisement

Baron has a good grip on the Tesla story, and we know the mass-market vehicle has been worked on since Q2 when the automaker detailed the “next-gen platform” as “in development.” With that being said, it is definitely an aggressive expectation that Tesla would start producing a new car in just 18 months.

This is especially pertinent when you consider Musk believes it will take 18 months just to get the Cybertruck to volume production:

“I would be very disappointed if it took us — and that would be shocking if it took us three years. But 18 months from initial deliveries to have — to reach volume and reach prosperity with an immense — I can’t tell you how much the blood, sweat, and tears level required to achieve. That is just staggering.”

While it is absolutely possible for Tesla to do so, especially as it has talked about building the $25,000 vehicle in Shanghai, Berlin, Texas, and Mexico, the Cybertruck ramp and overall macroeconomic conditions seem to be where things get interesting.

Advertisement

Tesla expands plans for €25k EV to Europe

Musk said the Cybertruck would be one of the most complex and challenging projects in manufacturing and that expectations should be tempered because there will likely be growing pains with it. It could take until the end of 2024 for things to really pick up.

“But this difficulty going from a prototype to volume production is like 10,000 percent harder to get to volume production than to make the prototype in the first place,” Musk said during the Q3 Earnings Call. “And then it is even harder than that to reach positive cash flow. That is why there have not been new car start-ups that have been successful for 100 years apart from Tesla. So, I just want to temper expectations for Cybertruck.”

It seems unlikely that Tesla would take on a new vehicle manufacturing project with the Cybertruck ramp and the construction of the new factory in Nuevo Leon.

Advertisement

However, Tesla has pulled off some crazy timelines before, but it has also been late to others. It is never out of the realm for something crazy to happen, especially as the project is already moving along in Austin, according to Walter Issacson’s biography about Musk.

I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.

Quotes via Motley Fool

Advertisement

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

California snubs Tesla in its newly passed EV incentive that favors Rivian and Lucid

California passed a $135 million EV incentive that rewards Rivian and Lucid while sidelining Tesla

Published

on

By

tesla fremont

California just drew a line in the EV incentive sand to put Tesla on the wrong side of it. The state recently passed a $135 million program offering first-time electric vehicle buyers a direct incentive with no application required, but the rules were written in a way that leaves Tesla at a structural disadvantage compared to Rivian and Lucid.

The program caps eligible vehicles at $50,000 for new EVs and $25,000 for used ones. That pricing threshold rules out a significant portion of Tesla’s lineup, though some lower-priced Model 3 and Model Y configurations would still qualify. California-based automakers are exempt from the price cap entirely, regardless of what their vehicles cost. Rivian, headquartered in Irvine, and Lucid, based in the San Francisco Bay Area, both benefit from that exemption. Rivian’s R2 starts at roughly $45,000 but has versions above the cap. Lucid’s Air and Gravity start at $70,990 and $79,990 respectively, well above any threshold a non-California company would face.

California hits Tesla Cybercab and Robotaxi driverless cars with new law

Tesla built its reputation and a significant portion of its early market share in California, where EV adoption has consistently led the nation. The company operates its original factory in Fremont, California, and the state was home to Tesla’s headquarters for most of its existence. That changed in 2021 when Tesla moved its corporate headquarters to Austin, Texas. Since then, the relationship between the company and California Governor Gavin Newsom has been openly adversarial, with Musk and Newsom trading public criticism on multiple occasions.

Advertisement

California’s EV incentive landscape has shifted repeatedly in recent years, and Tesla has previously lost eligibility for state-level programs as its vehicles exceeded income-adjusted price thresholds. The federal $7,500 EV tax credit, which Tesla models have qualified for and lost depending on policy cycles, is no longer available after it expired without renewal, making state-level programs more meaningful to buyers than they have been in years.

The practical impact for buyers is more nuanced than the headline suggests. California residents purchasing a Tesla under $50,000 for the first time can still access the incentive. But the exemption written for California-based manufacturers is a structural advantage that rewards where a company plants its headquarters flag rather than where it builds its products, and Tesla moved that flag to Texas.

Continue Reading

Elon Musk

SpaceX’s newest logo confirms everything about what it’s become

SpaceX officially absorbed xAI under the SpaceXAI brand, completing the largest private merger in history.

Published

on

By

SpaceX-Ax-4-mission-iss-launch-date

SpaceX made its corporate transformation official in May 2026 when Elon Musk posted on X that xAI would cease to exist as a standalone company. “xAI will be dissolved as a separate company, so it will just be SpaceXAI, the AI products from SpaceX,” he wrote.

A new SpaceXAI logo was announced today, visually embedding the xAI letters inside the SpaceX identity, which can be seen as a deliberate design choice that signals the merger is not a partnership but a full absorption and XAi a core function of the same company. The same way Starlink is not a separate brand but a SpaceX product. The announcement closed the loop on a process that began February 2, 2026, when SpaceX acquired xAI in the largest private merger in history, valued at $1.25 trillion. SpaceX at $1 trillion and xAI at $250 billion.


The reason SpaceX bought xAI was stated plainly by Musk at the time of the deal: to build orbital data centers. SpaceX had simultaneously filed with the FCC to launch up to one million satellites designed to function as AI compute nodes in low Earth orbit, escaping what Musk described as the energy constraints limiting AI development on Earth.

Advertisement

xAI provided the AI software stack, with Grok, the X platform, and the Colossus supercomputer infrastructure in Memphis with over 220,000 NVIDIA GPUs, while SpaceX provided the rockets, Starlink, and the capital base to fund it. The two companies needed each other. xAI was burning $2.5 billion in losses on $250 million in revenue. SpaceX was generating an estimated $8 billion in profit on $15 billion in revenue and needed an AI narrative to command the valuation it was targeting for its IPO.

SpaceXAI just launched into your kitchen with their new app

What SpaceX has done, regardless of how the orbital AI vision ultimately plays out, is walk into a public market as something no company has been before: a rocket manufacturer, satellite internet provider, AI software company, social media platform, and supercomputer operator under one ticker. Whether that combination is worth $2 trillion depends entirely on which of those businesses you believe in most.

Advertisement
Continue Reading

Investor's Corner

Tesla challenges startups to score a gig inside its most advanced European factory

Tesla is challenging startups to bring their best battery tech directly to Gigafactory Berlin.

Published

on

By

Tesla has issued an open challenge to startups across Europe, inviting them to bring their best battery technology directly to the floor of Gigafactory Berlin. The program, called the JUNI x Tesla Battery Cell Giga Challenge, opened applications this month with a deadline of July 24, 2026, and is targeting startups with solutions that can make battery cell manufacturing faster, cheaper, safer, and more scalable at an industrial level.

The timing of the challenge is directly tied to Tesla’s most aggressive European battery investment yet. On May 12, 2026, Giga Berlin plant manager André Thierig announced a $250 million investment to scale the factory’s annual 4680 cell production capacity from 8 GWh to 18 GWh, more than doubling the previous target set just months earlier in December 2025. Thierig confirmed the expansion on X, saying the investment “will enable 18 GWh of annual 4680 cell production and create more than 1,500 new jobs.” Combined with a previously announced battery investment at the Grunheide site now approaches $1.2 billion.


The challenge is looking specifically for startups with proven solutions across five categories: materials, equipment, operations, automation, and artificial intelligence. Applications are screened directly by Tesla’s cell manufacturing team in Grunheide, and the strongest submissions move through technical discussions, a pitch day in front of Tesla stakeholders, and potentially a paid pilot project with the cell team. Tesla is not looking for ideas at concept stage. The program requires applicants to demonstrate working prototypes, test data, or prior pilots before being considered.

Advertisement

The historical context matters here. Elon Musk first announced plans for what he called the world’s largest battery cell production facility alongside the Giga Berlin car factory back in 2020, targeting up to 250 GWh of annual capacity. Those plans were shelved in 2022 when Tesla shifted its battery investment focus to the United States to take advantage of Inflation Reduction Act incentives. The revival of cell production at Giga Berlin, now backed by over $1 billion in committed capital, represents a return to an ambition that was set aside for three years. As Teslarati has reported, the 4680 format is central to Tesla’s long-term cost reduction strategy across vehicles, energy storage, including the Tesla Semi and Cybercab.

By opening the challenge to outside startups, Tesla is acknowledging that reaching 18 GWh at Grunheide will require technology it does not currently have in-house, and it is willing to pay for the right solutions. For a startup in the battery supply chain, a paid pilot with Tesla’s European cell team is as close to a direct commercial path as the industry offers.

Continue Reading