Connect with us

News

Lucid expands its Arizona plant to prepare for Gravity production

Credit: Lucid Motors

Published

on

Electric vehicle (EV) startup Lucid Motors is expanding its factory in Casa Grande, Arizona, as it prepares to enter production of the Gravity SUV later this year.

The expansion of the Advanced Manufacturing Plant 1 (AMP-1) is set to increase the plant’s floor space by about 3 million square feet, bringing the total area in the factory up to more than 3.85 million square feet, according to a press release shared by the company last week. The expansion also comes as Lucid prepares to launch the Gravity crossover SUV by the end of 2024.

“The expansion of our manufacturing footprint in Arizona is a significant milestone for the company, as we prepare for the next phase of Lucid’s growth,” said Lucid CEO Peter Rawlinson in the release.

Lucid’s expanded factory now includes a new manufacturing facility and warehouse area, and upon full completion it will include a new general assembly line, new quality and semi-knock down (SKD) centers, increased space for body and paint shops, a new logistics site, and a larger powertrain facility.

Advertisement

Additionally, Lucid says the AMP-1 factory now includes one of the world’s most advanced stamping facilities, for which operations are slated to begin later this year.

“In just a few short years, the Lucid team has evolved our manufacturing footprint into one of the few highly integrated electric vehicle manufacturing plants in the U.S.,” said Steven David, SVP of Operations at Lucid. “This expanded state-of-the-art plant will bring greater operational efficiency to our manufacturing process and allow us to continue to deliver our high-quality, groundbreaking electric vehicles to our customers.”

Lucid unveiled the Gravity SUV in November, set to feature around 440 miles of range and be priced at around $80,000. The Gravity SUV is also expected to feature a 900-volt architecture and a 0-60 MPH acceleration of under 3.5 seconds.

Lucid struggles in Q4 and decreases deliveries from a year earlier

Advertisement

What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send your tips to us at tips@teslarati.com.

Zach is a renewable energy reporter who has been covering electric vehicles since 2020. He grew up in Fremont, California, and he currently lives in Colorado. His work has appeared in the Chicago Tribune, KRON4 San Francisco, FOX31 Denver, InsideEVs, CleanTechnica, and many other publications. When he isn't covering Tesla or other EV companies, you can find him writing and performing music, drinking a good cup of coffee, or hanging out with his cats, Banks and Freddie. Reach out at zach@teslarati.com, find him on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Advertisement
Comments

Elon Musk

Elon Musk hints what Tesla’s new vehicle will be

After Musk’s post earlier this week, many considered the possibility that the Tesla CEO was potentially talking about the Roadster, which is slated for an unveiling (again) next month. Some considered the possibility of the Robovan, which was unveiled back in 2024.

Published

on

Credit: Grok

Elon Musk hinted at what Tesla’s new vehicle will be just a day or so after he essentially confirmed the company is developing something that will eventually be available for consumers.

Earlier this week, Musk said that something “way cooler than a minivan” was on the way from Tesla after a fan posted on X that the company needed to build something for larger families. Requesting this type of vehicle has been a move of many Tesla fans over the years, but now, the urgency is even higher for this type of car because of the company’s decision to sunset the Model X.

Following reports of Musk’s plans to build something that will be cooler than a minivan, speculation consisted of what could possibly be on the way.

Tesla has teased a CyberSUV for quite a while, and there were even some clay models built by the company that were strategically placed in a promotional video.

Advertisement

After Musk’s post earlier this week, many considered the possibility that the Tesla CEO was potentially talking about the Roadster, which is slated for an unveiling (again) next month. Some considered the possibility of the Robovan, which was unveiled back in 2024.

However, a new post from Musk seems to indicate that it will be a new project altogether. After one follower of Musk’s said:

“If Tesla makes a car with 3 rows of seats, each with its own pair of doors so nobody has to climb over anybody else to get to their seat, they will create a baby boom the likes of which we haven’t seen in 80 years.”

Musk’s reply was simple but definitely shed more insight into the company’s plans, as he said:

Advertisement

“Noted.”

Musk’s simple one-word answer might be enough to essentially expect something large, like a full-sized SUV. This would be an incredible addition to the Tesla lineup, especially as the Model X is going away.

Advertisement

Even the Model X is not quite big enough, and not comparable to vehicles like the Chevrolet Tahoe, so a three-row, six-door SUV might be exactly what Tesla fans want.

It certainly does not sound like Tesla is planning to launch the Model Y L in the U.S., at least not exclusively, or use that car, which is currently built in China, to solve the needs of a larger family.

Tesla gives big hint that it will build Cyber SUV, smaller Cybertruck

It seems the time has certainly come for Tesla to answer the call of what consumers want. This has long been requested, and although the company’s sights are ultimately set on achieving full autonomy, there is still a need for larger families, and a full-size SUV could be a great addition for Tesla as it moves into the second quarter of 2026.

Advertisement
Continue Reading

Energy

Tesla’s newest “Folding V4 Superchargers” are key to its most aggressive expansion yet

Tesla’s folding V4 Supercharger ships 33% more per truck, cuts deployment time and cost significantly.

Published

on

By

Tesla V4 Supercharger installation ramping in Europe

Tesla is rolling out a folding V4 Supercharger design, an engineering change that allows 33% more units to fit on a single delivery truck, cuts deployment time in half, and reduces overall installation cost by roughly 20%.

The folding mechanism addresses one of the least glamorous but most consequential bottlenecks in charging infrastructure: getting hardware from factory floor to job site efficiently. By collapsing the form factor for transit and unfolding into an operational configuration on arrival, the new design dramatically reduces the logistics overhead that has historically slowed Supercharger rollouts, particularly at large or remote sites where multiple units are needed simultaneously.

The timing aligns with a broader acceleration in Tesla’s network strategy. In March 2026, Tesla’s Gigafactory New York produced its final V3 Supercharger cabinet after more than seven years and 15,000 units, pivoting entirely to V4 cabinet production. The V4 cabinet itself is already a generational leap, delivering up to 500 kW per stall for passenger vehicles and up to 1.2 MW for the Tesla Semi, while supporting twice the stalls per cabinet at three times the power density of its predecessor. The folding transport innovation layers logistical efficiency on top of that technical foundation.

Tesla launches first ‘true’ East Coast V4 Supercharger: here’s what that means

Advertisement

Tesla Charging’s Director Max de Zegher, commenting on the V4 cabinet when it launched, captured the operational philosophy behind these changes: “Posts can peak up to 500kW for cars, but we need less than 1MW across 8 posts to deliver maximum power to cars 99% of the time.” The design philosophy has always been about maximizing real-world throughput, not just peak specs, and the folding transport upgrade extends that thinking into the supply chain itself.

Continue Reading

Elon Musk

The Boring Company clears final Nashville hurdle: Music City loop is full speed ahead

The Boring Company has cleared its final Nashville hurdles, putting the Music City Loop on track for 2026.

Published

on

By

The Boring Company has cleared one of its most significant regulatory milestones yet, securing a key easement from the Music City Center in Nashville just days ago, the latest in a series of approvals that have pushed the Music City Loop project firmly into construction reality.

On March 24, 2026, the Convention Center Authority voted to grant The Boring Company access to an easement along the west side of the Music City Center property, allowing tunneling beneath the privately owned venue. The move follows a unanimous 7-0 vote by the Metro Nashville Airport Authority on February 18, and a joint state and federal approval from the Tennessee Department of Transportation and the Federal Highway Administration on February 25. Together, these green lights have cleared the path for a roughly 10-mile underground tunnel connecting downtown Nashville to Nashville International Airport, with potential extensions into midtown along West End Avenue.

Music City Loop could highlight The Boring Company’s real disruption

Nashville was selected by The Boring Company largely because of its rapid population growth and the strain that growth has placed on surface infrastructure. Traffic has become a persistent problem for residents, convention visitors, and airport travelers alike. The Music City Loop promises an approximately 8-minute underground transit time between downtown and the Nashville International Airport (BNA), removing thousands of vehicles from surface roads daily while operating as a fully electric, zero-emissions system at no cost to taxpayers.

Advertisement

The project fits squarely within a broader vision Musk has championed for years. In responding to a breakdown of the Loop’s construction costs, Musk posted on X: “Tunnels are so underrated.” The comment reflected a longstanding belief that underground transit represents one of the most cost-effective and scalable infrastructure solutions available. The Boring Company has claimed it can build 13 miles of twin tunnels in Nashville for between $240 million and $300 million total, a fraction of what comparable projects cost elsewhere in the country.

The Las Vegas Loop, The Boring Company’s first operational system, has served as a proof of concept. During the CONEXPO trade show in March 2026, the Vegas Loop transported approximately 82,000 passengers over five days at the Las Vegas Convention Center, demonstrating the system’s capacity during large-scale events. Nashville draws millions of convention visitors and tourists each year, and local business leaders have pointed to that same capacity as a major draw for supporting the project.

The Music City Loop was first announced in July 2025. Construction began within hours of the February 25 state approval, with The Boring Company’s Prufrock tunneling machine already in the ground the same evening. The first operational segment is targeted for late 2026, with the full route expected to be complete by 2029. The project represents one of the largest privately funded infrastructure efforts currently underway in the United States.

Continue Reading