Connect with us

Elon Musk

Tesla Earnings: financial expectations and what we should to hear about

In terms of discussions, Tesla earnings calls are usually a great time to get some clarification on the company’s outlook for its current and future projects.

Published

on

Credit: MarcoRP | X

Tesla (NASDAQ: TSLA) will report its earnings for the first quarter of 2026 this evening after the market closes, and analysts have already put out their expectations from a financial standpoint for the company’s first three months of the year.

Additionally, there will be plenty of things that will be discussed, including the recent expansion of the Robotaxi program, the Roadster unveiling, and Full Self-Driving (Supervised) approvals across the globe.

Financial Expectations

Wall Street consensus expectations put Tesla’s Earnings Per Share (EPS) at $0.36, while revenues are expected to come in around $22.35 billion.

This would compare to an EPS of $0.27 and $19.34 billion compared to Tesla’s Q1 2025. Last quarter, EPS came in at $0.50 on $29.4 billion of revenue.

Tesla beat analyst expectations last quarter, but the next trading day, the stock fell nearly 3.5 percent. We never quite can gauge how the market will respond to Tesla’s earnings; we’ve seen shares rise on a miss and fall on a beat.

It really goes on the news, and investor consensus, it seems.

Advertisement
-

What to Expect

In terms of discussions, Tesla earnings calls are usually a great time to get some clarification on the company’s outlook for its current and future projects. Right now, the big focus of investors is the Robotaxi program, the Roadster unveiling, and what the outlook for Full Self-Driving’s expansion throughout Europe and the rest of the world looks like.

Robotaxi

Tesla just recently expanded its unsupervised Robotaxi program to Dallas and Houston, joining Austin as the first cities in the U.S. to have access to the company’s ride-hailing suite.

Tesla expands Unsupervised Robotaxi service to two new cities

Some saw this move as a quick effort to turn attention away from a delivery miss and an anticipated miss on earnings. However, we’ve seen Tesla be more than deliberate with its expansion of the Robotaxi suite, so it’s hard to believe the company would make this move if it were not truly ready to do so.

The company is also working to expand its U.S. ride-hailing service outside of Texas and California, and recently filed paperwork to build a Robotaxi-exclusive Supercharger stall.

Expansion is planned for Florida, Nevada, and Arizona at some point this year, with more states to follow.

Advertisement
-

Roadster Unveiling

The Roadster unveiling was slated for April 1, and then pushed back (once again) to “probably late April,” according to Elon Musk.

It does not appear that the Roadster unveiling will happen within that time frame, at least not to our knowledge. Nobody has received media or press invites for a Roadster unveiling, and given the lofty expectations set for the vehicle by Musk and Co., it seems like something they’d want to show off to the public.

Tesla Roadster unveiling set for this month: what to expect

The Roadster has become a truly frustrating project for Tesla and its fans; evidently, there is something that is not up to the expectations Musk and others have. Meanwhile, fans are essentially waiting for something that is six years late.

At this point, also given the company’s focus on autonomy, it almost seems more worth it to just cancel it, remove any and all timelines and expectations, and surprise people with something crazy down the line, maybe in two or three years. There should be no talk of it.

Full Self-Driving Global Expansion

We expect Musk and Co. to shed some details on where it stands with other European government bodies, as it recently was able to roll out FSD (Supervised) to customers in the Netherlands.

Advertisement
-

Tesla Full Self-Driving gets first-ever European approval

Spain is also working with Tesla to assess FSD’s viability as a publicly available option for owners.

With that being said, there should be some additional information for investors as they listen to the call; no talk of it would be a pretty big letdown.

Optimus

There will likely be a date set for the Gen 3 Optimus unveiling, and we’re hopeful Tesla can keep that date set in stone and meet it. Not reaching timelines is a relatively minor issue, but a company can only do this for so long before its fans and investors start to lose trust and disregard any talk about dates.

It seems this is happening already.

Optimus has been pegged as Tesla’s big money maker for the future. The goals and expectations are high, but it is a privilege to have that sort of pressure when investors know the company’s capability.

Advertisement
-

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

Tesla reveals Optimus Academy, where robots teach themselves

Tesla has begun building production quality Optimus robots in Fremont and revealed its training plan.

Published

on

By

Concept rendering of Tesla Optimus in mass production

Tesla has started building Optimus on the high volume line it set up inside its Fremont factory, and the company says the robots coming off it are the first that meet the bar for a real product. “The bots coming off this line are the first production-quality bots that we have manufactured,” Tesla wrote in its third quarter shareholder letter, adding that it has “proven that the current manufacturing process for Optimus is suitable for a commercial product.”

The line sits in space that built the Model S and Model X until this spring. Tesla cleared the old vehicle line in 46 days, as Teslarati reported in July, to make room for robot production sized for one million units a year. On Wednesday’s earnings call, Elon Musk said most of the equipment for that capacity is already in Fremont, with output set to climb toward roughly 20,000 robots a week as the line ramps.

Musk described the ramp as a classic S curve. “The growth of Optimus is an S curve, but the initial curve is a shallow slope,” he said. The team is now refining the robot’s AI, electromechanical design, reliability and service life, and Musk expects that work to be finished by the end of next year, when Tesla plans to start delivering Optimus to outside companies for dangerous, repetitive and around the clock jobs.

The most interesting part of the call was how Tesla plans to teach the robots. Its cars send real driving data back to the AI team from millions of vehicles, but Optimus has no fleet like that yet. “A big difference with Optimus versus the cars is we don’t have this vast fleet of cars from which we can gather training data,” Musk said. Tesla’s answer is an Optimus Academy, where 10,000 to 20,000 robots will practice a wide range of tasks and feed what they learn into the next version of the model. Every unit off the Fremont line becomes a source of that training data.

Smarter hardware is on the way too. Tesla plans to put its AI5 chip into Optimus next year, and Musk said a new Optimus video should arrive within one or two months showing the robot completing tasks driven by AI rather than preprogrammed motions. He took aim at rival humanoid demos that only run scripted routines, saying those would not hold up in the real world.

Advertisement
-

The supply chain is lining up behind the program. In September, Tesla certified Tuopu, Joyson and Sanhua as mass production partners for Optimus components. A far larger Optimus factory is also rising at Giga Texas, where drone footage from Joe Tegtmeyer showed the steel frame nearing completion, and Musk has pegged that plant’s long term target at 10 million robots a year.

Tesla executives also said Optimus production costs are trending toward the expected manufacturing cost of Cybercab, a sign the robot is being engineered for volume from the start. The hands remain the toughest piece of the design, a point Musk also made at the X Takeover event earlier this month, as Teslarati covered at the time, and that is where much of the current engineering effort is focused.

Continue Reading

Elon Musk

The Starship moon landing number NASA and Elon Musk can’t agree on

Musk disputes NASA estimate of 22 Starship launches for Moon landing, predicting 6 to 8.

Published

on

By

Concept rendering of SpaceX Starship landing on the moon via Grok

Elon Musk is disputing a new NASA safety panel estimate of how many Starship launches it will take to put astronauts on the Moon, saying the real number will be less than half the panel’s figure.

On Thursday, NASA’s Aerospace Safety Advisory Panel held its quarterly public meeting. Panel member Charlie Precourt, a former NASA astronaut, flagged the fueling process for SpaceX’s lunar lander as a major risk for Artemis IV, the mission planned to land a crew on the Moon in 2028. “We need to keep our eyes on numerous required fuelings for the lander,” Precourt said, according to Ars Technica. “I think the last estimate is around 22 flights.”

Ars Technica’s Eric Berger posted the comment on X, and Musk replied. “That’s way too high,” Musk wrote. “Actual number will be more like 6 to 8.”

The disagreement comes down to a basic problem with sending a ship as large as Starship to the Moon. Starship burns nearly all of its propellant just reaching Earth orbit, so it cannot continue on to the Moon without stopping for a refill. SpaceX’s answer is a gas station in space. First, a Starship that works as a storage tank, called a depot, is launched into orbit. Then a series of tanker Starships launch one at a time, dock with the depot and pump their leftover propellant into it. Once the depot is full, the lunar lander version of Starship launches, docks, fills up and heads for the Moon.

Every tanker trip is its own full rocket launch, which is why the count matters. More launches mean more time, more cost and more chances for something to go wrong before astronauts ever leave Earth. Berger estimated that even if SpaceX reaches twice weekly Starship launches by the end of 2027, filling a depot at the panel’s number would still take roughly three months.

Advertisement
-

How many tankers are needed depends mostly on how much propellant each one can carry to orbit and how much is lost along the way. Starship’s fuel and oxygen are stored at extremely cold temperatures, and some of it slowly boils off while waiting in orbit. More is lost in each transfer. NASA appears to be working from what Starship can lift today, while Musk’s range assumes a more capable rocket.

Musk has pushed back on higher counts before. In 2021, after a government document suggested 16 launches, he called that “extremely unlikely” and said eight tankers would be the most required.

Much of the answer depends on hardware SpaceX has not finished flying. As Teslarati noted earlier this year, the company plans to carry out the refueling process with its upgraded V3 Starship, and Precourt described Artemis IV as carrying “a large number of firsts.” He also praised NASA Administrator Jared Isaacman’s team for working to clear obstacles for both SpaceX and Blue Origin, whose Blue Moon lander does not rely on orbital refueling for its first mission.

Continue Reading

Elon Musk

Tesla’s secretive “Project Crystal Sun” gets a big green light in Texas

Fort Bend County approved four incentive agreements Thursday for Tesla’s proposed $10.1 billion solar factory.

Published

on

By

Elon Musk stands in profile against a clear blue sky, with a bright overhead sun shining above a vast landscape of Tesla solar panels stretching to the horizon, and a smaller Texas flag flying on a pole to his right.

Fort Bend County commissioners on Thursday approved a package of tax incentives for Tesla’s proposed $10.1 billion solar cell factory near Needville, Texas, giving the company one of the last local approvals it needs before it decides where to build. All four Tesla agreements passed 4 to 0.

The votes covered a property tax abatement inside Reinvestment Zone No. 34, a Chapter 381 economic development agreement, a foreign trade zone non-objection paired with payments in lieu of certain taxes, and a separate payment in lieu of taxes “true up” agreement, according to agenda notes from the Fort Bend Commissioners Court meeting.

The project, known internally as “Project Crystal Sun,” would make solar cells and finished modules on roughly 3,000 acres near FM 762 and FM 1994, south of the Brazos River. As Teslarati reported when the filing first surfaced in August, Tesla’s application under the state’s JETI Act splits the investment into $1.5 billion in real property and $8.6 billion in equipment, with 9,712 permanent jobs projected by 2033 and commercial operations targeted for the first quarter of 2029. The plant would handle the full chain from ingot and wafer production through cell testing.

Inside Tesla’s secretive $10 Billion “Project Crystal Sun” filing

Thursday’s approval does not lock in the site. Tesla has told the Texas Comptroller it is still weighing other locations, and site selection adviser David Dennison told Lamar Consolidated ISD trustees in September that the race had narrowed to Fort Bend and one out of state rival with a “very compelling package,” according to the Houston Chronicle. Tesla hopes to decide before the end of 2026, and the incentives still need sign off from the Comptroller and the Governor’s office.

Local officials have now done nearly everything within their control. Commissioners created the reinvestment zone in an August 24 special meeting, with Interim County Judge Daniel Wong formally withdrawing himself over his engineering firm’s past work with Tesla. Lamar CISD trustees voted 7 to 0 on September 15 to advance a JETI agreement that would tax Tesla’s qualifying property at 50 percent of its value for maintenance and operations from 2029 through 2038.

The plant lines up with a target Elon Musk set on Tesla’s Q4 2025 earnings call in January, when he said the company would “work toward getting 100 GW a year of solar cell production, integrating across the entire supply chain from raw materials all the way to finished solar panels.” In March, Tesla was reported to be negotiating a $2.9 billion purchase of Chinese solar manufacturing equipment bound for Texas. The Houston area already hosts Tesla’s Megafactory in Brookshire, where Megapack 3 production has started. Tesla said on its Q3 call that Megapack supply for 2027 is nearly sold out, and Musk wrote on X Thursday that the company is “increasing production of Megapacks as much as possible,” as demand from data centers climbs.

Continue Reading