Connect with us

News

SpaceX’s next Falcon Heavy reaches milestone as third booster arrives in FL

Falcon Heavy's two side boosters land side-by-side after a successful launch debut. (SpaceX)

Published

on

A new SpaceX rocket was spotted traveling into Florida yesterday on its way to one of the company’s several Cape Canaveral booster storage and processing hangars. More likely than not, this particular booster is the second Falcon Heavy center core ever built, a heavily modified variant of Falcon 9’s first stage.

With the presumed center core’s arrival, all three Falcon Heavy boosters are now at or near SpaceX Launch Complex 39A, a major step forward for the second flight of the super heavy-lift launch vehicle, currently NET March 2019. Aside from the first stage, it appears that Falcon Heavy Flight 2’s payload fairing may have also arrived at Cape Canaveral around the end of January.

SpaceX Facebook group member Joshua Murrah also captured what is likely the third Falcon Heavy booster’s Florida arrival. (Joshua Murrah, 02/11/19)

Captured by SpaceX Facebook group member Joshua Murrah on the morning of February 11th, the shrinkwrapped Falcon booster and truck were stopped at a weigh station on the border of Alabama and Florida, a now-common location for core spottings thanks to its adjacency to Mr. Murrah’s daily commute. No more than an 8-10 hour drive from Florida’s East Coast and Kennedy Space Center, the rocket likely arrived at its destination sometime within the last 12 or so hours.

While Falcon Heavy hardware would normally be expected to head straight for SpaceX’s hangar at Pad 39A, the only facility currently capable of launching the triple-booster rocket, the company faces a mild logistical challenge thanks to the terminally delayed launch debut of Crew Dragon. As of now, Crew Dragon, Falcon 9, and 39A’s transporter/erector (T/E) are integrated inside the pad’s hangar, leaving very little space for additional rocket processing as a result of the sheer scale of the T/E. Past photos of SpaceX’s 39A hangar illustrate that it can nominally house 4 or 5 Falcon boosters with ease, but space becomes far more limited once the T/E is rolled inside.

Advertisement

In essence, Falcon Heavy Flight 2 will likely have to wait until Crew Dragon has completed its launch debut before SpaceX technicians and engineers can begin integrating its three boosters and verifying that all is healthy, only the second time SpaceX will have performed those procedures. Crew Dragon’s uncrewed demonstration mission (DM-1) is currently scheduled for NET March 2nd, although there is a high probability that it will slip at least a few more days into March, if not further. Prior to its latest March 2nd launch target, Crew Dragon was expected to launch sometime in mid-to-late January as of December 2018, a date that has effectively remained 30+ days away ever since.

It’s ambiguous what the causes of those delays are and SpaceX and NASA clearly have no interest in directly tackling an explanation, but the most likely reason can be found in a painfully mundane reality: paperwork, worsened by a record-length US goverment shutdown. While both partners are likely culpable in some way, the fact remains that SpaceX has a long history of doing difficult things faster and cheaper than the old guard perceives as possible, while NASA has its own decades-long history of doing difficult things with extreme caution (for better or for worse).

 

With any luck, Crew Dragon will successfully launch into orbit for the first time in the first several days of March, leaving enough buffer for SpaceX to rapidly integrate, checkout, and static-fire Falcon Heavy for an operational launch debut – carrying communications satellite Arabsat 6A – near the end of March. If all goes well, Falcon Heavy’s third launch – the USAF’s second Space Test Program mission (STP-2) – could occur as early as April 2019, potentially just a month after Flight 2.


Check out Teslarati’s newsletters for prompt updates, on-the-ground perspectives, and unique glimpses of SpaceX’s rocket launch and recovery processes!

Advertisement

Eric Ralph is Teslarati's senior spaceflight reporter and has been covering the industry in some capacity for almost half a decade, largely spurred in 2016 by a trip to Mexico to watch Elon Musk reveal SpaceX's plans for Mars in person. Aside from spreading interest and excitement about spaceflight far and wide, his primary goal is to cover humanity's ongoing efforts to expand beyond Earth to the Moon, Mars, and elsewhere.

Advertisement
Comments

Elon Musk

Elon Musk is setting high expectations for Tesla AI5 and AI6 chips

Musk confirmed this week that Tesla had just completed a design review for AI5.

Published

on

Tesla-Chips-HW3-1
Image used with permission for Teslarati. (Credit: Tom Cross)

Elon Musk is setting high expectations for Tesla’s in-house silicon program. As per Musk in a set of recent posts on X, Tesla’s AI5 and AI6 will be game-changing. 

Tesla’s AI5 and AI6 are incredibly important for Tesla’s future, which will likely be built on the back of very high-volume products like Optimus and the Cybercab.

Musk sets high expectations

Musk confirmed this week that Tesla had just completed a design review for AI5, which will initially be manufactured by TSMC in Taiwan before production ramps in Arizona. As per Musk, consolidating Tesla’s chip design efforts into one architecture has allowed the company to focus its silicon talent on delivering a single high-performance platform. 

“Just had a great design review today with the Tesla AI5 chip design team! This is going to be an epic chip. And AI6 to follow has a shot at being the best (by) AI chip by far. Switching from doing 2 chip architectures to 1 means all our silicon talent is focused on making 1 incredible chip. No-brainer in retrospect,” Musk wrote in his post.

In a follow-up post, the CEO also stated that the company’s upcoming AI5 chip “will probably be the best inference chip of any kind” for models below ~250 billion parameters, with the “lowest cost silicon and best performance per watt.” Musk added that AI6, which follows AI5, “has a shot at being the best AI chip by far.”

Advertisement

AI6 as Dojo’s successor

While AI5 is nearing production, Musk has also pointed to AI6 as Tesla’s next major target. The chip will be manufactured at Samsung’s upcoming Texas facility, part of a multibillion-dollar deal to support Tesla’s next-generation products such as the Cybercab and the Optimus humanoid robot. Musk also noted that AI6 could effectively replace Project Dojo as Tesla’s training platform, given its potential for both inference and training workloads.

Industry veterans have echoed this view, with former Apple and Rivian engineer Phil Beisel suggesting that “AI6 is now Dojo.” Musk appeared to agree, responding with a “bullseye” emoji. Musk has also noted on X that he would personally be walking the line in Samsung’s upcoming AI6 factory in Texas, to make sure that the facility’s output is accelerated according to Tesla’s requirements. 

Continue Reading

Elon Musk

Elon Musk: Neuralink could restore partial vision to the blind next year

The executive posted the update on social media platform X.

Published

on

Neuralink-Demo-Elon-Musk
Credit: Steve Jurvetson/Twitter

Elon Musk has suggested that Neuralink could attempt to restore limited sight to visually impaired patients as early as 2026. 

The executive posted the update on social media platform X amid news of Neuralink’s first successful Telepathy implants outside the United States. 

Blindsight trials

In a response to a post from Neuralink’s official X account about its first Canadian patients, Musk wrote that the company is “Aiming to restore (limited) sight to the completely blind next year.” The update was well-received on social media, as the device would most likely provide notable quality of life improvements to patients. Neuralink’s current implant, Telepathy, is already changing lives today, and the same will likely be true for Blindsight.

This was not the first time that Musk has provided an update to Neuralink’s Blindsight trials. Earlier this year, Musk told the Qatar Economic Forum that the first human implantation of Blindsight could occur early 2026, potentially in the United Arab Emirates. Neuralink has explored collaboration with the Cleveland Clinic Abu Dhabi to perform the initial surgery. Blindsight has also received a “breakthrough device” designation from the US FDA, hinting at the implant’s development.

Blindsight’s potential

Musk has previously described Blindsight as Neuralink’s brain-computer interface (BCI) designed to restore vision. During Neuralink’s 2022 Show & Tell event, Musk stated that Blindsight would target the brain’s visual cortex, bypassing damaged eyes entirely to generate visual perception. This means that vision could be restored even for people who were born blind. 

Advertisement

“The first two applications we’re going to aim for in humans are restoring vision, and I think this is notable in that even if someone has never had vision ever, like they were born blind, we believe we can still restore vision. The visual part of the cortex is still there. Even if they’ve never seen before, we’re confident they could see,” Musk said.

Continue Reading

News

Sweden Mediation Institute throws in the towel on Tesla vs IF Metall union conflict

After nearly two years, the union’s strike has become the country’s longest labor dispute to date.

Published

on

Credit: @NicklasNilsso14/X

Sweden’s Mediation Institute has formally ended its efforts to resolve the conflict between Tesla Sweden and trade union IF Metall. After nearly two years, the union’s strike has become the country’s longest labor dispute to date. 

Launched 677 days ago by the IF Metall union, the strike was intended to push Tesla Sweden into signing a collective agreement. Tesla Sweden, however, remained firm, maintaining that its working conditions are already better than union standards.

Mediation Institute withdraws

The state-run Mediation Institute, which had been involved early in the strike, confirmed this week that it was officially closing the case. The two parties have had several meetings, but neither side has been able to come to an agreement.

Director General Irene Wennemo described the effort as unprecedented in difficulty in a comment to Ekot. “We have tried in every possible way to get the parties to come closer to each other in a way that allows this conflict to end. But now we have come to the end of the road and have realized that it is just as good to end the case,” she told the Swedish outlet.

Union signals flexibility

The mediators noted in their final report that Tesla Sweden had limited authority in the talks, with key decisions appearing to rest with executives in the United States. The situation, they stated, created barriers to compromise that made the conflict “unlike anything else.” Tesla has maintained throughout that its Swedish workers already receive strong benefits and protections without the need for a formal collective agreement, as noted in a CarUp report.

Advertisement

IF Metall, for its part, has begun hinting that it was open to alternatives. This was highlighted by Union Chair Marie Nilsson, who noted that while the preferred outcome of the country’s longest strike in history is a signed agreement, “other alternative solutions” are now on the table. “You can do it in different ways. The easiest thing would be to sign a collective agreement. But when that is not possible, we have to find other alternative solutions as well, so we are open to discussion,” the union official stated.

Continue Reading

Trending