Connect with us

Investor's Corner

Elon Musk’s new pay plan ties trillionaire status to Tesla’s $8.5 trillion valuation

Shareholders are expected to vote on the proposal at the annual meeting on November 6.

Published

on

USAFA_Hosts_Elon_Musk_(Image_1_of_17)_(cropped)
U.S. AIR FORCE ACADEMY, Colo. -- Tesla Inc. Chief Executive Officer Elon Musk poses for a photograph with U.S. Air Force Academy Cadets in Mitchell Hall during a tour hosted by Superintendent Lt. Gen. Richard Clark on April 7, 2022. Musk met with Academy senior leadership and delivered remarks to a crowd of cadets and faculty. (U.S. Air Force photo by Justin R. Pacheco)

Tesla’s board has proposed a new compensation package for CEO Elon Musk that could make him the world’s first trillionaire and Tesla the most valuable company in history. 

The 2025 CEO Performance Award, outlined in a securities filing on Friday, would be worth up to $900 billion in Tesla stock (NASDAQ:TSLA) if the automaker achieves a series of aggressive performance and valuation goals, according to the New York Times. 

Shareholders are expected to vote on the proposal at the annual meeting on November 6.

Tesla is aiming for an insane $8.5 trillion market cap

The package requires Musk to lift Tesla’s market capitalization from about $1.1 trillion today to $8.5 trillion over the next decade. At that level, Tesla would surpass every major public company in existence. Nvidia, currently the world’s most valuable firm, has a market cap of around $4.2 trillion today, as noted in a Motley Fool report. Microsoft and Apple follow at $3.8 and 3.6 trillion each, while Saudi Aramco is valued at around $1.5 trillion.

If Tesla achieves its $8.5 trillion target, it would be worth more than twice Nvidia’s present valuation and nearly eight times its current size. The compensation plan also requires Tesla’s operating profit to grow from $17 billion last year to $400 billion annually.

Credit: Tesla

Elon Musk’s path to a trillionaire status

Apart from leading Tesla to become the world’s biggest company in history, Musk is also required to hit several product targets for the electric vehicle maker. These include the delivery of 20 million Tesla vehicles cumulatively, 10 million active FSD subscriptions, 1 million Tesla bots delivered, and 1 million Robotaxis in operation.

Tesla board chair Robyn Denholm and director Kathleen Wilson-Thompson said retaining Musk is “fundamental to Tesla achieving these goals and becoming the most valuable company in history.” If successful, the plan would raise Musk’s Tesla stake from 13% to about 25%, further consolidating his control. It would also result in the CEO earning $900 billion in TSLA stock, allowing him to effectvely become a trillionaire. 

Advertisement
-

The proposal mirrors a 2018 compensation plan that was invalidated in Delaware court earlier this year in the way that it is focused on very aggressive targets and operational milestones. Tesla has since shifted its corporate registration to Texas, where challenges from potential activist shareholders are less of a risk.

Tesla’s SEC filing can be viewed below.

www-sec-gov-Archives-edgar-data-1318605-000110465925087598-tm252289-4_pre14a-htm… by Simon Alvarez

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Investor's Corner

Tesla showrooms picked clean ahead of Q3 end as demand looks strong

Published

on

Credit: @thaichiminh1907/X

Tesla (NASDAQ: TSLA) showrooms have been picked clean ahead of the end of the third quarter of the year, as demand looks to be strong and delivery estimates for new vehicles are pushed into late 2026 and early 2027.

Tesla appears to have sold out of many of its Model 3 and Model Y trim levels in the United States, as only the Model Y RWD and Model Y All-Wheel-Drive are available for delivery before the end of the year.

Additionally, many showrooms are either completely empty or void of all but just one demo unit within the buildings themselves in an effort to bolster what could be one of Tesla’s best quarters in vehicle deliveries in recent memory.

Additionally, when I spoke to the guys at Tesla Mechanicsburg two weeks ago, when I returned the Model Y L, their third hauler of the week had just arrived, and every vehicle on it, along with every vehicle in their delivery lot, was accounted for and had a name attached to it for delivery.

Tesla saw a 25 percent increase in deliveries in Q2 compared to the same quarter the year before. The vast majority of the 480,126 units it delivered, 467,762 vehicles to be exact, were the Model 3 and Model Y.

In Q3 2025, Tesla delivered 497,099 vehicles, once again a figure that was dominated by the company’s two mass-market vehicles. Analysts have unusually wide predictions for this quarter, likely because so many firms missed the Q2 delivery figure by such a substantial margin; Wall Street predicted 408,000 cars, while Tesla delivered 480,000.

Goldman Sachs has Tesla slotted for 435,000 deliveries in Q3, while JPMorgan said it anticipates 482,000. The median guess is about 449,000 deliveries for Q3.

Interested in ordering a Tesla? Use my referral code for three free months of Full Self-Driving (Supervised) here.

Continue Reading

Elon Musk

SpaceX turned a heralding moment for Starship into its greatest

Starship reached orbit despite losing an engine, deployed 26 Starlink V3 satellites on Flight 14.

Published

on

By

SpaceX’s Starship reached orbit for the first time on Monday, and for a few nail-biting minutes it looked like it wouldn’t. During ascent on Flight 14, one of Ship 41’s six Raptor engines shut down early, and SpaceX’s livestream host Dan Huot told viewers the team had decided not to commit to orbit. Minutes later, after what Huot described as a lot of conversation in the control room, the final poll came back in favor, and a roughly 19 second burn of a single Raptor pushed the ship into orbit about 170 miles up.

The reversal matters because SpaceX had written the exit ramp into the mission plan. The company said it would only fire the orbital insertion burn if flight controllers confirmed enough backup hardware remained for the deorbit burn, a condition Teslarati laid out ahead of the flight. Losing an engine was exactly the scenario that rule was built for.

Pressing forward fits Elon Musk’s history. Falcon 1 failed three straight times before its fourth launch reached orbit in 2008, with SpaceX nearly out of money, and Starship was developed by flying prototypes until they broke. What changed this year SpaceX going public, and with $SPCX sliding below its IPO price in July when Flight 13 slipped, the short interest climbed significantly, as Teslarati reported at the time. A Starship potentially lost today with revenue generating next-gen Starlink satellites aboard would have landed directly on shareholders.

That pressure showed up after orbit. SpaceX cut a flight planned to last nearly 10 hours to about three, moving splashdown from west of Chile to the North Pacific near Hawaii. SpaceX gave no reason, though Musk said this month the company was being extremely cautious about debris risk. The single Raptor for deorbit worked, and Ship 41 completed its flip and landing burn before breaking apart in the water, an outcome SpaceX expected. Musk has structured SpaceX’s governance to shield long term bets from market pressure.

The payload is the bigger business story. Musk posted that all 26 Starlink V3 satellites deployed and are “operating nominally.” Each V3 is rated for about 1 Tbps of downlink and 160 Gbps of uplink, so this single launch adds roughly 26 Tbps, about 10 times what a Falcon 9 load of V2 Mini satellites adds. The V3 is too large for Falcon 9, making Starship the only vehicle that can build out the planned 100,000 satellite constellation, at up to 60 per flight once it reaches routine service. Unlike the 20 V3 units on Flight 13, which reentered on a suborbital path, these will raise their orbits and could begin serving customers within weeks and bring in hundreds of millions of additional dollars in projected Starlink revenue.

SpaceX has already begun winding down Falcon 9 Starlink launches from Florida in favor of Starship. Reported targets put Flight 15 as early as October 19, leaving about three weeks to diagnose Monday’s engine shutdown before the next orbital attempt.

Continue Reading

Elon Musk

SpaceX just got the green light Starship has waited years for

The FAA has cleared Starship Flight 14, setting up SpaceX’s first orbital attempt on Monday.

Published

on

By

SpaceX has cleared the last regulatory hurdle standing between Starship and its first trip to orbit. The Federal Aviation Administration issued the launch license for Starship Flight 14 late Saturday, keeping the mission on track for liftoff Monday, September 28, from Pad 2 at Starbase, Texas.

The 75 minute launch window opens at 7:15 a.m. Central, and Boca Chica Beach closures are also scheduled for September 29 and 30 as backup dates. This will be Starship’s first revenue generating mission.

The license was the missing piece after SpaceX completed a full wet dress rehearsal with Booster 21 and Ship 41 on September 24. At the time, the company said the flight remained on track pending regulatory approval. Because Flight 14 flies an orbital profile, the FAA had to sign off on a modified license that met its safety, payload and financial responsibility requirements.

Observers combing through the new FAA paperwork also noticed that lightning no longer appears among Starship’s listed launch hazards. If that holds, it matters more for where Starship is headed than for Monday’s attempt. Florida and Louisiana, home to LC-39A and the planned Starbase Louisiana site, see some of the most frequent lightning in the United States.

SpaceX tells the FCC that Starship Flight 14 is going to orbit

Flight 14 is the mission SpaceX has been building toward for months. Ship 41 will carry 26 Starlink V3 satellites, the first operational V3 units to be deployed, and attempt roughly six orbits at about 275 kilometers over a flight lasting just under 10 hours. SpaceX says the ship will only perform its orbital insertion burn after flight controllers confirm enough hardware redundancy remains for the deorbit burn at the end of the mission. Ship 41 is targeting a splashdown in the Pacific west of Chile, while Super Heavy will return to the Gulf of Mexico.

The date carries some symbolism as well. A Monday launch would come 10 years and one day after Elon Musk first presented the Interplanetary Transport System, the design that became Starship, at the International Astronautical Congress in Guadalajara, Mexico.

Advertisement
-

SpaceX has not announced what comes next, but air traffic planning slides reported this week, list Flight 15 no earlier than October 19 and a first Starship launch from LC-39A in Florida no earlier than October 30. Both dates depend on how Monday goes.

Continue Reading