Connect with us

News

Florida Pension Board votes for Elon Musk’s 2018 CEO Performance Award

Ministério Das Comunicações, CC BY 2.0 , via Wikimedia Commons

Published

on

With just over a day before Tesla’s 2024 Annual Stockholders’ Meeting, the company’s large investors are drawing a line in the sand. Among them is Florida’s Pension Board, which noted that it voted for the ratification of Tesla CEO Elon Musk’s 2018 compensation plan. 

As could be seen in the Florida State Board of Administration’s official website, Florida’s Pension Board followed Tesla management’s suggestion with regard to Elon Musk’s CEO Performance Award. The Florida Pension Board explained the rationale behind its vote as follows. 

“Equity plan exhibits very high levels of pay-for-performance and requires the attainment of strict performance objectives with a strong performance orientation. Plan’s design is very well structured,” the agency noted. 

Credit: Florida Pension Board

The Florida Pension Board currently holds 2.89 million Tesla shares, making the agency the electric vehicle maker’s 80th largest investor. 

While the Florida Pension Board voted for the ratification of Elon Musk’s 2018 CEO Performance Award, the board voted against the proposed redomestication of Tesla from Delaware to Texas. As per the agency, the reincorporation of Tesla to Texas is not in the best interests of shareholders because corporate case law is less mature in the Lone Star state. 

Advertisement

“Not in shareholders’ best interests and may provide uncertain benefits and additional legal risks. Relatively less mature corporate case law environment in Texas,” the agency noted. 

The Florida Pension Board also voted against the election of Kimbal Musk into Tesla’s Board of Directors. This, according to the board, is due to Tesla’s directors not being sufficiently independent. Interestingly enough, the board also voted in favor of electing James Murdoch into Tesla’s Board of Directors. 

Tesla’s 2024 Annual Shareholders Meeting, also dubbed as the 2024 Cyber Roundup, will be held at Giga Texas, 1 Test Road, Austin, Texas, on June 13, 2024. The event, which will be accessible to the public through a livestream, is expected to start at 3:30 p.m. CT. 

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Advertisement

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

SpaceX announces new Starship 13 test flight target date

Published

on

SpaceX Starship V3 flight 12
SpaceX Starship V3 flight 12 (Credit: SpaceX)

SpaceX has announced a new target date for the thirteenth test flight of Starship: Monday, July 20, with the launch window opening at 6:45 p.m ET/5:45 p.m. CT.

This is the first rescheduling attempt of Starship’s 13th test flight. It was set to launch last night, but SpaceX scrubbed the launch attempt.

CEO Elon Musk revealed that some of the engines on Starship did not start, which automatically triggers a launch abort. Two of the Raptor engines will be removed and replaced.

SpaceX officially announced the new launch window this morning.

Starship’s 13th test launch comes with a few new objectives, but SpaceX does not plan to attempt a catch of the booster, which it has done several times in the past.

For Starship’s Upper Stage, there are some adjustments to ensure engine reusability that will be assessed during the ascent, and 20 operational Starlink V3 satellites are also set to make their way into space. SpaceX also plans to attempt an in-space relight of a single Raptor engine, which is a critical demonstration for future orbital deorbit, refueling, and deep space maneuvers.

Ultimately, it will splash down in the Indian Ocean.

The continuous tests help SpaceX advance the Starship program toward eventual full reusability, operational Starlink V3 deployment, and future missions, which include NASA’s Artemis program.

Continue Reading

Elon Musk

SpaceX Starship Flight 13 aborted at Zero and Musk just told us what broke

Four Raptor engines failed to ignite at T-zero, forcing SpaceX to scrub Starship Flight 13 Thursday.

Published

on

By

SpaceX scrubbed the Starship Flight 13 launch attempt Thursday evening at the last possible moment, after four of the Super Heavy booster’s 33 Raptor 3 engines failed to ignite during the startup sequence. The 90-minute window had opened at 6:45 p.m. EDT from Starbase in Boca Chica, Texas, and the countdown had proceeded without issue all day, with more than 11.5 million pounds of liquid methane and liquid oxygen being fully loaded into the rocket before the automated abort triggered. SpaceX’s launch directors posted on X, “Standing down from today’s flight test attempt,” and shut down the livestream shortly after.

Musk confirmed the root cause within hours. “Some of the engines didn’t start, triggering an automatic launch abort,” he wrote on X. “To be confident of a good flight, 2 Raptors will be removed and replaced. Most probable launch timing is early next week.” SpaceX engineers began draining propellant tanks immediately and Booster 20 was rolled back to its hangar for inspection.

SpaceX comes with a slew of changes for Starship Flight 13

 

The timing adds a layer of significance that did not exist during any of the previous 12 Starship flights. This is the first time SpaceX has attempted to launch Starship since the company made its stock market debut in June, listing under ticker SPCX at $135 per share. Public investors are now watching every Starship outcome in real time, and a last-second abort carries more visibility than it would have six months ago.

Flight 13 was designed to be one of the most consequential tests in the program’s history. It was set to carry 20 Starlink V3 satellites, the first operational payload Starship has ever attempted to deploy. Six of those satellites carried external cameras to photograph Starship’s heat shield from the outside during flight, which would act as a self-inspection approach SpaceX has never attempted before. The mission also needed to complete a Raptor engine relight in space, a step SpaceX skipped on Flight 12 in May after losing an engine during ascent. That Flight 12 booster also flipped 90 degrees off course during its boostback burn when five engines failed to reignite.

SpaceX has not announced an official next launch date. Musk’s “early next week” window points to July 21 or 22 at the earliest, pending the engine swap and a return to the pad.

Continue Reading

News

Elon Musk secretly acquires $1B energy company to power the AI future

Published

on

Gage Skidmore, CC BY-SA 4.0 , via Wikimedia Commons

Elon Musk flew under the radar with his recent purchase of a $1 billion energy company, according to Federal Trade Commission (FTC) documents.

Transaction number 202612350 listed Tesla and SpaceX frontman Elon Musk as the acquiring party and CF APR Super Holdings LLC as the seller, with New APR Energy, LLC as the acquired entity. The deal, which closed without public announcement, came to light on May 14.

Analysts inferred the deal’s scale from minority stakeholder disclosures, including one report of a 5 percent interest sold for approximately $50.4 million. Fortress Investment Group had purchased APR’s assets in late 2024, rebranded the operation as New APR Energy, and subsequently transferred ownership to Musk.

APR Energy specializes in rapidly deployable power infrastructure. The company maintains one of the world’s largest fleets of mobile gas and diesel turbines, with more than 1.1 gigawatts of generation capacity. Its modular units, which are often trailer-mounted, enable turnkey installations ranging from 20 MW to over 500 MW.

Elon Musk admits he was ‘clearly wrong’ about Anthropic

APR provides full engineering, procurement, construction, operation, and maintenance services for behind-the-meter power plants, serving everything from data centers, utilities, and industrial clients.

The firm has expanded aggressively to meet surging demand, recently adding turbines and deploying over 100 MW for a major AI hyperscaler. Its solutions bridge critical gaps where grid interconnections face delays of two to five years, according to Yahoo.

The acquisition means something more for Musk. As he continues to expand projects in artificial intelligence, especially xAI, his AI venture, there is a greater need to supply energy-intensive supercomputing clusters, including the Colossus project, with what they need: reliable and high-capacity power.

Ownership of APR provides immediate access to flexible generation assets that can be deployed adjacent to data centers, reducing dependence on a strained infrastructure. It also complements Tesla’s energy storage business, so Musk will be able to pull from his own entities to address the rapid scaling demands of AI training and compute.

Continue Reading