Connect with us

News

SpaceX breaks Falcon 9 flight record once more

Falcon 9 launches 23 Starlink satellites to orbit (Credit SpaceX)

Published

on

SpaceX launched a Falcon 9 for the 21st time on Friday with a launch from Space Launch Complex 40 at Cape Canaveral Space Force Station, breaking their record set just 35 days prior.

It only took 35 days for Booster 1062 to take to the skies again to help deliver 23 V2 mini Starlink satellites to orbit, showcasing SpaceX’s ability to quickly refurbish their fleet flight leaders.

Advertisement

The 23 Starlink satellites — part of Group 6-59 — were launched to the Southeast and into a 43-degree orbital inclination, the same as prior Group 6 missions. The company had recently gone through a slight lull in launches from Florida as the Just Read the Instructions droneship was undergoing maintenance. The droneship is now back in action and already heading toward the next landing zone for a Starlink launch this week.

Booster 1062 broke the launch record in style, with a launch just after sunset local time. As B1062 ascended, it flew back into sunlight right before stage separation, and as the second stage ignited, the exhaust plume lit up, creating a “Jellyfish effect,” putting on a beautiful show for anyone who happened to be outside to catch the launch.

The “Jellyfish effect” created by the 2nd stage of the Falcon 9. (Credit SpaceX)

The lighting was just right to where you could track not only the first stage but also both nose cone fairings with all three using cold gas thrusters to help orient themselves for the trip back through the atmosphere to be recovered.

Advertisement

B1062 made its 21st landing on the droneship ‘A Shortfall of Gravitas’ just short of eight and a half minutes after liftoff. The view of the launch from the recovery was just as epic which could be seen in this post from Elon Musk below.

SpaceX has a busy week if weather or technical issues don’t get in the way. First up is a classified payload for the National Reconnaissance Office currently scheduled for no earlier than 1:00 am PT on May 22nd from California, followed by back-to-back Starlink launches from Florida on May 22nd (NET 10:33 pm ET) and May 23rd (NET 6:45 pm ET).

Advertisement

Questions or comments? Shoot me an email at rangle@teslarati.com, or Tweet me @RDAnglePhoto.

Launch journalist, specializing in launch photography. Based on the Space Coast, a short drive from Cape Canaveral and the SpaceX launch pads.

Advertisement
Comments

News

Ferrari unveils its Luce EV, and its reception has been a disaster

Published

on

Credit: Ferrari

Ferrari unveiled its Luce EV over the weekend, and so far, its reception has been an absolute disaster, gathering negative reactions from a wide variety of people, including former executives.

The stock even took a hit on its first day of trading following the unveiling, dropping over 7 percent.

Ferrari moving to EVs from its traditional V12s and mid-engine sports cars is a massive move. It was designed by Sir Jony Ive and Marc Newsom’s LoveFrom studio, which is known for design work for tech giant Apple. “Luce” means “light” in Italian, so Ferrari drew inspiration for its name from its sleek design, characterized by a smooth, sculpted body with rounded edges.

But its reception has been far from what Ferrari expected. The overall design has drawn some harsh criticism since its reveal, and it is simply stunning that such a storied company, with a rich history of beautiful, powerful cars has revealed a design that many are not a fan of.

Advertisement

Responses to the design were widely negative, with some saying, “Enzo is rolling in his grave,” and “This looks like a Nissan LEAF with a bad body kit.”

Advertisement

Former Ferrari Chairman Luca di Montezemolo said:

“I’ve seen the project has already been delayed more than two years. I don’t like commenting from the stands—when I was in the game, it annoyed me when people did that. I think for now the electric Ferrari could have been avoided, but clearly Ferrari made huge investments in plants and the car itself for their own reasons. Maybe Porsche’s lesson is useful for reflection.”

Ferrari has scaled back EV commitments in the past, primarily in response to weaker-than-expected demand for its electric powertrains.

Priced at roughly $640,000 in the U.S., it is tough to see how this car will ever truly live up to the massive expectations many had for it. It almost feels like, to a certain extent, Ferrari is looking for a way to get out of building EVs.

Advertisement
Continue Reading

News

Tesla unveils juicy new detail on the Roadster and hints at new unveil timeline

Published

on

A red Tesla Roadster driving around a turn
(Credit: Tesla)

Tesla unveiled a juicy new detail on the Roadster, its long-delayed supercar project, and additionally hinted at a new unveiling timeline, as it appears yet another month will pass without seeing the capabilities of the vehicle.

Vice President of Vehicle Engineering at Tesla, Lars Moravy, revealed on the Ride the Lightning podcast that the Roadster will be built at Gigafactory Texas, adding that “you’ll start to see a lot of things unfold in the next months.”

While we get a good detail on the plant of manufacture, we also get another letdown, as it appears the unveiling event will not take place in May, as CEO Elon Musk hinted during the Earnings Call.

The Roadster was first unveiled back in 2017, alongside the Semi, which entered production earlier this year. It was Tesla’s attempt at a true supercar; it would be rare, expensive, and lightning quick, among other incredible capabilities, like potentially hovering for a short period thanks to a collaboration project with SpaceX.

However, the vehicle was set to be delivered in 2020. Parts and supply chain issues due to the COVID-19 pandemic started these delays, and since then, Tesla, and specifically Musk, have wanted to push the capabilities of the Roadster to somewhere the human mind may not be able to currently comprehend.

Both Chief Designer Franz von Holzhausen and Moravy have said many things about the Roadster over the past few years, hinting that the car truly could be worth the wait. However, the continuous delays we’ve seen have undoubtedly been discouraging.

Advertisement

With that being said, it’s not like Tesla has been doing nothing. Instead, the company has been focusing on revamping current models, phasing out others, and working on developing the cars of the future, specifically, the Cybercab, which entered production at Giga Texas in April.

Despite the Roadster’s delays, there is still a ton of anticipation for the vehicle to be released. It will have a steering wheel, as Musk said it will be “the best of the last of the human-driven cars.”

Continue Reading

Elon Musk

NASA just gave SpaceX more crew missions because Boeing can’t certify

Published

on

By

NASA has filed a procurement notice announcing its intent to add six post-certification missions to SpaceX’s existing Commercial Crew Transportation Capability contract. The agency said it would order up to three of those missions immediately upon adding them to the contract, with the remaining three available as needed through the end of the International Space Station’s planned operations in 2030.

The reason for the expansion is straightforward. NASA cited recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, and the ongoing technical challenges of maintaining a reliable crew transportation capability as the driving factors behind the decision. Boeing’s CST-100 Starliner has still not been certified for crewed flights, and a cargo-only Starliner mission was not included on NASA’s most recent mission manifest. With Boeing effectively sidelined for the foreseeable future, SpaceX is the only American company capable of rotating crews to the station.

SpaceX Board has set a Mars bonus for Elon Musk

The history behind this contract tells the fuller story of how SpaceX got here. NASA originally awarded SpaceX its Commercial Crew contract in 2014 for $2.6 billion. In 2022 NASA modified the contract to add five missions covering Crew-10 through Crew-14, worth $1.436 billion, bringing the total contract value at that point to $4.9 billion. The recent May 18 filing by NASA extends that runway further, with Crew-12 currently docked at the station and Crew-13 assigned and targeting a mid-September 2026 launch.

Advertisement

According to a report by SpaceNews, NASA stated in its filing: “It is necessary to award additional PCMs to SpaceX given the recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, NASA’s projections for when an alternative crew transportation system may become available, and the ongoing technical challenges of maintaining a reliable capability for crewed flights to ISS.”

No dollar value for the new six missions has been publicly confirmed yet, but based on the 2022 precedent of roughly $287 million per mission, the new block could represent close to $1.7 billion in additional contract value. With SpaceX simultaneously preparing Starship as NASA’s Artemis lunar lander, filing its S-1 for a June IPO, and now absorbing more ISS crew rotation work, the company’s role as the primary contractor for American human spaceflight is no longer a matter of circumstance. It is NASA policy.

Continue Reading