Connect with us
Falcon Heavy Flight 2. The booster in the middle - B1055 - was effectively sheared in half after tipping over aboard drone ship OCISLY. (Pauline Acalin) Falcon Heavy Flight 2. The booster in the middle - B1055 - was effectively sheared in half after tipping over aboard drone ship OCISLY. (Pauline Acalin)

News

SpaceX’s first flight-proven Falcon Heavy Block 5 rocket ready for static fire test

Falcon Heavy Block 5 is seen here ahead of the rocket's commercial launch debut, April 2019. Both side boosters (left and right) will launch again on the USAF's STP-2 mission. (Pauline Acalin)

Published

on

According to NASASpaceflight.com, SpaceX is just ~48 hours away from Falcon Heavy Flight 3’s critical static fire test, in which all 27 of the rocket’s Merlin 1D engines will be briefly ignited.

If the routine test goes as planned, SpaceX’s third completed Falcon Heavy will be ready to lift off as early as 11:30 pm ET (03:30 UTC), June 24th. Atop the massive rocket will be the US Air Force’s Space Test Program-2 (STP-2) mission, a collection of 24 small satellites from a variety of US government agencies and academic institutions. Practically speaking, STP is often more of an engineered excuse to launch, involving satellites and customers that are willing to accept higher risk than more valuable payloads, making it far easier for the US military to certify new technologies and new commercial launch vehicles.

As previously discussed on Teslarati, STP-2 is an extremely ambitious mission that aims to simultaneously certify or pave the way towards certification of critical capabilities. First and foremost, it will (barring serious anomalies) give the US military the data it needs to certify SpaceX’s Falcon Heavy rocket for all national defense launches, giving ULA’s Delta IV Heavy its first real competition in a decade and a half.

Each of those three rocket nozzles is roughly 2.5m (8 feet) across, plenty of room for all but the tallest humans to stand up in.
ULA’s Delta IV Heavy lifts off in August 2018 during the launch of NASA’s Parker Solar Probe. (Tom Cross)

Included under the umbrella of that catch-all certification is a sort of torture-test validation of the long-coast capabilities of SpaceX’s Falcon upper stage. To successfully complete STP-2, the upper stage will be subjected to “four separate upper-stage engine burns, three separate deployment orbits, a final propulsive passivation maneuver, and a total mission duration of over six hours.” It will likely be SpaceX’s most technically-challenging launch ever.

To complete STP-2, Falcon Heavy’s upper stage – essentially the same thing that flies on Falcon 9 – will be subjected to its most challenging mission profile yet. (SpaceX)

Finally, the US Air Force has decided that STP-2 presents an excellent opportunity to begin the process of certifying flight-proven SpaceX rockets for military launches. The STP-2-related work is more of a preliminary effort for the USAF to actually figure out how to certify flight-proven commercial rockets, but it will still be the first time the a dedicated US military mission has flown on a flight-proven launch vehicle. Down the road, the processes set in place thanks – in part – to STP-2 and Falcon Heavy may also apply to aspirational rockets like Blue Origin’s New Glenn and ULA’s “SMART” concept for Vulcan reuse.

Still, New Glenn is unlikely to be ready for flight-proven military launches until the mid-2020s, while ULA has no plans to even attempt to implement Vulcan’s “SMART” reuse until ~2026, meaning that military certification probably wont come until 2028-2030 at the earliest. SpaceX has thus earned roughly half a decade where it will be the only viable US launch provider that can offer certified flight-proven hardware with an established record of reliability. Although the Air Force Research Laboratory (AFRL) had a lone smallsat aboard SpaceX’s February 2019 launch of PSN-6 and Spaceflight’s GTO-1 mission, STP-2 will be the first time a dedicated Department of Defense mission has flown on flight-proven launch vehicle hardware since 1992 (STS-53).

USAF photographer James Rainier's remote camera captured this spectacular view of Falcon Heavy Block 5 side boosters B1052 and B1053 returning to SpaceX Landing Zones 1 and 2. (USAF - James Rainier)
Falcon Heavy side boosters B1052 and B1053 land at Landing Zones 1 and 2 (LZ-1/LZ-2) after their launch debut and Falcon Heavy’s first commercial mission. Both will fly again as part of the STP-2 mission. (USAF – James Rainier)

Aside from flight-proven Falcon Heavy side boosters B1052 and B1053, STP-2 is expected to use a new center core, B1057. SpaceX is in the late stages of vehicle integration and should be nearly complete by Monday, June 17th in order to support a June 18th static fire. The specific static fire window is not yet public but Falcon Heavy will likely roll out to Pad 39A no less than 12 hours before.

STP-2 Falcon Heavy Preparations in HIF at 39-A
On June 11th, Joshua Mendoza captured this exceptional view of Falcon Heavy Flight 3 integration inside SpaceX’s Pad 39A hangar. Visible are the rocket’s payload fairing (right), center core (middle), and upper stage (middle/left).

Teslarati photographers Tom Cross and Pauline Acalin will both be on site with a bevy of remote cameras to capture SpaceX’s third Falcon Heavy before, during, and after liftoff. STP-2 will be Falcon Heavy’s first attempted nighttime launch. Stay tuned for updates as we get closer to T-0!

Check out Teslarati’s Marketplace! We offer Tesla accessories, including for the Tesla Cybertruck and Tesla Model 3.

Eric Ralph is Teslarati's senior spaceflight reporter and has been covering the industry in some capacity for almost half a decade, largely spurred in 2016 by a trip to Mexico to watch Elon Musk reveal SpaceX's plans for Mars in person. Aside from spreading interest and excitement about spaceflight far and wide, his primary goal is to cover humanity's ongoing efforts to expand beyond Earth to the Moon, Mars, and elsewhere.

Advertisement
Comments

Investor's Corner

Tesla Robotaxi gets a massive upgrade in Nevada

Nevada regulators just approved a massive expansion of Tesla’s robotaxi fleet across the entire county.

Published

on

By

Concept art of a Tesla Cybercab in Las Vegas Strip as rendered via Grok

Tesla’s robotaxi footprint in Nevada just grew by roughly 500 times in a single regulatory vote.

The Nevada Transportation Authority approved Tesla’s full Autonomous Vehicle Network Company permit on Thursday, clearing the way for the company to deploy up to 5,000 driverless vehicles across Clark County over the next 12 months. The decision came during a four hour general session meeting that Tesla investor Sawyer Merritt watched live and reported on X, noting the vote replaces the interim order that had limited Tesla to just 10 robotaxis on a narrow stretch of the Las Vegas Strip.

That earlier cap, covered here after it surfaced on August 13, came with restrictions that looked stricter than what Tesla runs in Austin: a 45 mph speed ceiling, no airport pickups, and a geofence confined to the Strip corridor. The new approval extends Tesla’s operating authority to all of Clark County, with room to request an even wider geofence across the state.

Tesla representatives at the meeting said they have no intention of putting 5,000 cars on the road right away. Commercial rides are expected to start within 30 days, pending vehicle inspections, insurance filings, and fare approval, the standard steps every robotaxi operator in Nevada has had to clear.

Tesla’s own Robotaxi account replied to the news with a short line, The golden future is upon us.

The timing lines up with Tesla’s broader robotaxi push this month. The company is preparing to open Cybercab rides to the public in Austin as soon as this month, and it opened a sweepstakes for riders to win a seat at the launch event. Tesla filed its original application for a 5,000 vehicle Nevada fleet back in June, a request regulators trimmed to 10 vehicles when they issued the interim order in July. Thursday’s vote effectively grants the number Tesla asked for from the start.

Zoox, the Amazon owned robotaxi operator, has run in Nevada since 2025 and was capped at 100 vehicles before Thursday’s decision. Tesla’s new ceiling puts it well ahead of that comparison on paper, though the company has said its actual fleet size will depend on how quickly FSD v15 rolls out, the software update executives have called the gateway to scaling unsupervised robotaxi operations nationwide.

Continue Reading

News

Tesla admits to slow Model Y Robotaxi integration, but for a good reason

Published

on

Credit: Tesla

Tesla welcomed JPMorgan analysts to one of its factories earlier this month, with the Wall Street firm highlighting its findings in a new note to investors. One of the more pertinent pieces of information is that Tesla admitted to slowly integrating Model Y vehicles into its Robotaxi fleet, but it has a good reason.

JPMorgan analysts recently toured Tesla’s Fremont Factory and met with the company’s investor relations team, emerging with a clearer picture of the automaker’s Robotaxi strategy. According to the bank’s note, Tesla is intentionally limiting the addition of Model Y vehicles to its existing Robotaxi fleet.

The firm’s analysts said:

“Tesla indicated it is intentionally holding back on adding Model Y units to the robotaxi fleet, expressing confidence in its ability to scale Cybercab in the near-term. On FSD V15, Tesla views this release as a step-change in performance, comparable to the leap from V13 to V14. The V15 upgrade encompasses seven core technologies, with ~40% of those currently being tested in the robotaxi fleet, where initial feedback has been encouraging.”

Far from signaling delays or doubts about autonomy, the move reflects strong management confidence in the near-term scalability of the purpose-built Cybercab.

Tesla has operated its Robotaxi service primarily with modified Model Ys since launching in Austin and expanding to other markets. Yet the company is now deliberately holding back further Model Y conversions. The rationale is straightforward: leadership believes the Cybercab, a two-seat, steering-wheel- and pedal-free vehicle optimized for high utilization, can ramp production and deployment more efficiently in the coming months.

This dedicated form factor promises better unit economics for the majority of rides, which typically involve one or two passengers, while freeing consumer Model Y inventory for retail sales.

Supporting this pivot is Full Self-Driving (FSD) software version 15, which Tesla describes as a genuine step-change in performance, comparable to the leap from V13 to V14. The update incorporates seven core technologies; roughly 40 percent are already undergoing real-world testing in the current Robotaxi fleet, with early feedback described as encouraging.

Tesla is carefully managing software development to minimize regressions in core driving functions as new capabilities are added. Management positions V15 as the primary gateway to scaling unsupervised FSD. Importantly, the existing AI and Hardware 4 stack is already capable of running V15 and supporting unsupervised operation.

Cybercab itself is only the first vehicle on the platform. Tesla reiterated that additional form factors will follow, pointing to concepts such as the earlier “Robovan” demonstration as examples of how the architecture can evolve.

Tesla’s mysterious Robovan makes a sneak peek with Optimus in Terafab video

Parallel progress continues on the Optimus humanoid robot, which remains on track for start of production in the coming months, with commercial sales possible as early as the second half of 2027. Generation 3 details will be revealed closer to production to preserve competitive advantages, while Generation 4 scope will draw on real-world Gen 3 experience.

JPMorgan left the meeting with a deeper appreciation for Tesla’s manufacturing automation and maintained its $475 price target. The decision to slow Model Y Robotaxi integration is therefore not a setback but a calculated prioritization of a more efficient, purpose-built solution that management believes is ready to scale.

Continue Reading

Elon Musk

Elon Musk gives a timeline for SpaceX’s first Starship catch attempt

Published

on

SpaceX Starship V3 from Starbase, Texas on April 14, 2026

SpaceX CEO Elon Musk announced today that the company will likely attempt to catch the Starship upper stage with its launch tower arms “in a few months.”

In a post on X, Musk wrote, “Looks like we will probably catch the ship with the tower in a few months. If there had been a tower out to sea where we practiced landing the ship, it would have been caught.” He added that the first reflight of a Starship vehicle is expected by the end of 2026 or early 2027, describing it as “a fork in the road of history for consciousness reaching the stars.”

Musk’s prediction comes amid ongoing progress toward full reusability of the Starship system, a two-stage rocket designed for rapid turnaround and dramatically lower launch costs. Catching the upper stage, known simply as “ship,” with the Mechazilla tower’s mechanical arms would mark a major milestone. It would allow both stages to return directly to the launch site for quick refurbishment and reuse, eliminating the need for ocean recovery.

Musk has previously signaled plans for a ship catch. In July, shortly after SpaceX’s wildly successful Starship 13 mission, he stated that the company would attempt to catch the ship with the tower on the next flight unless problems emerged in the mission data review. Earlier comments also outline conditions such as successful soft ocean landings before attempting a land recovery to minimize risk.

SpaceX has solved Starship’s biggest challenge, Elon Musk says

The latest update from Musk adjusts this timeline to a few months, reflecting the iterative nature of the test campaign.

SpaceX has already demonstrated the tower catch technique successfully with the Super Heavy booster on a couple of occasions. The first successful booster catch occurred during Flight 5 in October 2024, when the massive first stage returned to the Starbase pad in Texas and was plucked from the air by the tower arms.

Additional catches followed on later flights, including Flight 7, proving the concept for the booster and building confidence in the system as a whole.

Achieving a similar catch for the upper stage would represent a significant step forward. The ship returns from much higher speeds and greater heat loads after orbital or near-orbital flight. Success would advance SpaceX’s goal of full and rapid reusability, potentially reducing the cost of access to orbit by a factor of 100 or more and supporting ambitions for frequent satellite deployments, lunar missions, and eventual Mars flights.

Musk has long emphasized that true reusability, refueling rather than discarding hardware, is essential for making humanity a multi-planetary species.

As SpaceX continues refining Starship through successive test flights, the coming months will test whether the ambitious catch timeline can be met. The combination of prior booster successes and improving ship landing precision suggests the company is steadily closing in on this historic capability.

Continue Reading