Connect with us

Elon Musk

Tesla rolls out Steer-by-Wire improvements to Cybertruck

Published

on

Credit: Weibo (via YYDS on X)

Tesla is rolling out some improvements to the Steer-by-Wire system on Cybertruck, which is one of the features exclusive to the vehicle as it is not active on any other vehicle in the company’s all-electric lineup.

Steer-by-wire is a steering system that turns the direction of wheels mechanically. It differs from vehicles with typical electric power steering systems in the way that those rely on the steering wheel column to transfer steering torque to the wheels.

There are a handful of EVs that use steer-by-wire, including the Cybertruck, Hummer EV, and Silverado EV. The latter two use a traditional steering column and only have steer-by-wire on their rear wheels, so they differ from the system the Cybertruck uses.

Credit: Tesla

The system has made the massive Cybertruck have better steering, and although its size is large, it is one of the easier Tesla vehicles to steer through tight spaces — granted you have the room.

Tesla is making an improvement to the system, according to a new update that will roll out in the 2025.8.4 Software Update as the steering wheel is now going to give more realistic feedback by adapting to road surfaces, the company said (via Not a Tesla App):

Advertisement

“The steering wheel now gives you more realistic feedback, adapting to different road surfaces for a better driving experience.”

This feature will work alongside another improvement as the Cybertruck’s air suspension ride height is now adjustable through the Tesla App.

Tesla Cybertruck steer-by-wire system helps avoid potential collision

The changes from the update, in terms of the more realistic feedback, will improve the overall feel of the road for drivers, making for a better driving experience.

Advertisement

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

Elon Musk’s Starbase, TX included in $84.6 million coastal funding round

The funds mark another step in the state’s ongoing beach restoration and resilience efforts along the Gulf Coast.

Published

on

Credit: SpaceX/X

Elon Musk’s Starbase, Texas has been included in an $84.6 million coastal funding round announced by the Texas General Land Office (GLO). The funds mark another step in the state’s ongoing beach restoration and resilience efforts along the Gulf Coast.

Texas Land Commissioner Dawn Buckingham confirmed that 14 coastal counties will receive funding through the Coastal Management Program (CMP) Grant Cycle 31 and Coastal Erosion Planning and Response Act (CEPRA) program Cycle 14. Among the Brownsville-area recipients listed was the City of Starbase, which is home to SpaceX’s Starship factory.

“As someone who spent more than a decade living on the Texas coast, ensuring our communities, wildlife, and their habitats are safe and thriving is of utmost importance. I am honored to bring this much-needed funding to our coastal communities for these beneficial projects,” Commissioner Buckingham said in a press release

“By dedicating this crucial assistance to these impactful projects, the GLO is ensuring our Texas coast will continue to thrive and remain resilient for generations to come.”

Advertisement

The official Starbase account acknowledged the support in a post on X, writing: “Coastal resilience takes teamwork. We appreciate @TXGLO and Commissioner Dawn Buckingham for their continued support of beach restoration projects in Starbase.”

The funding will support a range of coastal initiatives, including beach nourishment, dune restoration, shoreline stabilization, habitat restoration, and water quality improvements.

CMP projects are backed by funding from the National Oceanic and Atmospheric Administration and the Gulf of Mexico Energy Security Act, alongside local partner matches. CEPRA projects focus specifically on reducing coastal erosion and are funded through allocations from the Texas Legislature, the Texas Hotel Occupancy Tax, and GOMESA.

Checks were presented in Corpus Christi and Brownsville to counties, municipalities, universities, and conservation groups. In addition to Starbase, Brownsville-area recipients included Cameron County, the City of South Padre Island, Willacy County, and the Willacy County Navigation District.

Advertisement
Continue Reading

Elon Musk

The Boring Company wins key approval for Nashville Music City Loop

The approval allows The Boring Company to use state-owned right-of-way along Tennessee’s highway system.

Published

on

the boring company's vegas loop entrance
(Credit: Sam Morris, LVCVA/Las Vegas News Bureau)

Tennessee Gov. Bill Lee announced that the Tennessee Department of Transportation (TDOT) and the Federal Highway Administration (FHWA) have jointly approved The Boring Company’s lease application and enhanced grading permit for the Music City Loop.

The approval allows The Boring Company to use state-owned right-of-way along Tennessee’s highway system, clearing a key hurdle for the privately funded tunnel project that aims to connect downtown Nashville to Nashville International Airport in approximately eight minutes, the Office of the TN Governor wrote in a press release.

“Tennessee continues to lead the nation in finding innovative solutions to accommodate growth, and in partnership with The Boring Company, we are exploring possibilities we couldn’t achieve on our own,” Gov. Lee said in a statement.

“The Boring Company is grateful for the leadership and hard work of federal, state, and local agencies in bringing this project to a shovel-ready point,” The Boring Company President Steve Davis said. “Music City Loop will be a safe, fast, and fun public transportation system, and we are excited to build it in Nashville.”

Advertisement

With lease and permitting approvals secured, The Boring Company will move forward with the Loop system’s construction immediately. The first segment of the Loop system is expected to be operational by the end of the year.

The Music City Loop will run beneath state-owned roadways and is designed to connect downtown Nashville to the airport, as well as lower Broadway to West End. The project will be 100% privately funded.

“The Music City Loop shows what’s possible when we leverage private-sector innovation and American ingenuity to solve transportation challenges,” said U.S. Transportation Secretary Sean Duffy. “TDOT’s lease approval will help advance this ambitious project as we work to reduce congestion and make travel more seamless for the American people.”

The Boring Company described the Loop as an all-electric, zero-emissions, high-speed underground transportation system that will meet or exceed safety standards. The Vegas Loop, for one, earned a 99.57% safety and security rating from the DHS and the TSA, the highest score ever awarded to any transportation system.

Advertisement
Continue Reading

Elon Musk

Elon Musk’s The Boring Company closes Tunnel Vision Challenge

The Tunnel Vision Challenge invited individuals, companies, and governments to propose a tunnel project up to one mile long.

Published

on

Credit: The Boring Company/X

Elon Musk’s The Boring Company has officially closed submissions for its Tunnel Vision Challenge, confirming that a total of 487 entries were received before the deadline.

In a post on X, the company wrote, “Tunnel Vision Challenge is closed! 487 entries received – TBC team is excited to go through them all!” The company added that “We will select the top ~15 in the next week, and reach out with follow-up questions,” and that an “overall winner will be announced on March 23.”

The Tunnel Vision Challenge invited individuals, companies, and governments to propose a tunnel project up to one mile long with a 12-foot inner diameter. The winning entry will have its tunnel constructed free of charge.

Submissions could range from Loop passenger tunnels to freight, pedestrian, utility, or water tunnels. The only requirement was that the project clearly demonstrate how tunneling would meaningfully improve transportation or infrastructure between two points.

Advertisement

Just days before the deadline, the company provided an interim update noting that 407 entries had already been received. “Update on the Tunnel Vision Challenge – 1 mile of free tunnel! With 3 days left to submit, 407 entries have been received. Great to see enthusiasm for tunnels!” The Boring Company wrote at the time on X. By the close of submissions, the total had grown closer to 500 entries, hinting at strong interest in underground transportation solutions.

Entries are being evaluated on usefulness, stakeholder engagement, and technical, economic, and regulatory feasibility. Applicants were required to quantify projected benefits, such as time saved per rider or cost savings per shipment, and provide maps showing proposed alignments and other details. Submissions that included geotechnical or subsurface data are expected to receive additional consideration.

The Boring Company will fund the tunnel’s construction itself, though related infrastructure costs may be discussed with the winning team. The company also retains discretion to modify or cancel the challenge.

Advertisement
Continue Reading