Connect with us

News

Tesla Semi is officially headed to Europe

Published

on

Credit: Tesla

Tesla has officially confirmed plans to bring its all-electric Semi truck to Europe, with full specifications and market-launch details set for unveiling at the IAA Transportation trade fair in Hannover, Germany.

The event runs September 15–20, with a possible press preview on September 14. The announcement, shared via Tesla’s Semi account, marks a significant expansion beyond North America nearly nine years after the truck’s original 2017 reveal.

In the United States, the Semi’s path has been gradual. Limited pilot production and customer deliveries began in late 2022, primarily to fleets such as PepsiCo. After years of refinement, high-volume manufacturing started on April 29, 2026, at a dedicated facility adjacent to Gigafactory Nevada.

Advertisement
-

The plant targets an annual capacity of 50,000 units, though the ramp is expected to be gradual, with “many thousands” of trucks projected by the end of 2026.

Demand is building, with recent orders including 500 units for Einride (deliveries starting September 2026, serving Amazon and others) and hundreds more from operators such as WattEV. Pricing stands at approximately $260,000 for the Standard Range and $290,000 for the Long Range before incentives.

Tesla Semi pricing revealed after company uncovers trim levels

Earlier in 2026, Tesla finalized production specifications that incorporated substantial updates. In February, the company detailed two variants designed for a full 82,000-pound gross combination weight.

The Standard Range offers about 325 miles of range with a 548 kWh battery and curb weight under 20,000 pounds. The Long Range delivers roughly 500 miles with an 822 kWh pack and a 23,000-pound curb weight. Both use three independent rear-axle motors producing up to 800 kW (about 1,073 horsepower), achieve energy consumption of around 1.7 kWh per mile, and support megawatt-class charging at up to 1.2 MW—recovering about 60 percent of range in 30 minutes through the MCS standard.

Additional refinements include a roughly 1,000-pound weight reduction versus earlier prototypes, improved aerodynamics, a 48-volt electrical architecture, electric power take-off up to 25 kW for refrigerated trailers, and fleet management software with over-the-air updates.

Advertisement
-

These advances position the Semi as a competitive option against diesel trucks on operating costs and performance. For Europe, adaptations such as lighting, cab configurations (including potential sleeper options), and regulatory compliance are anticipated.

With series production underway in Nevada and major fleet commitments secured, the upcoming IAA reveal will clarify timelines, European-specific specs, and pricing, potentially accelerating electrification of heavy-duty freight on both continents.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

The Boring Company’s latest Tesla tunnel truck mod “fits like a glove”

The Boring Company has modified a Tesla powered tunnel truck to carry freight containers underground.

Published

on

By

the-boring-company-tesla-robotaxi

The Boring Company has found a second job for the Tesla hardware it already runs underground. In a post on X, Elon Musk’s tunneling company showed its latest Prufrock Liner Truck modified to carry a standard 20 foot shipping container. “Using TBC tunnels to transport freight,” the company wrote. “The latest Prufrock Liner Truck (using Tesla Model 3 batteries and drive units) has been modified to carry a standard 20′ shipping container. Fits like a glove!”

The photo shows a red container sitting on a long, low white chassis parked outside, with drive hardware visible at one end. The Boring Company did not say where or when freight hauling would start, which customers it has in mind, or how many trucks it is converting.

Advertisement
-

Until now, the liner trucks have hauled concrete. Teslarati reported in August on Liner Truck 3, which uses Model 3 battery packs and drive units to move more than 22,000 pounds of precast tunnel segments to the boring machine. It has 28 miles of range, tops out at 12 mph, and is piloted remotely from the company’s operations center in Texas. The freight version appears to be the same platform with a different bed, and The Boring Company has not said whether it will also be remotely piloted.

Freight has been on the company’s menu for years. When TBC updated its product lineup in 2021, its freight tunnel was described as sized to fit a standard shipping container, “barely.” The company later used the idea at Tesla’s own factory, where Prufrock 3 dug a tunnel to Giga Texas that now moves finished Cybertrucks away from the production line.

The Boring Company closed a $3 billion Series D in September at a $23 billion valuation, and Teslarati has covered how that money is tied to a UAE tunneling push and a faster Nashville build. In Nashville, Prufrock MB1 and MB2 are mining at the same time, and a third machine is expected to launch in late October. Each machine needs a steady supply of liner trucks, so any design that works for segments and containers alike gives the company more use out of the same Tesla parts.

The Vegas Loop remains the only Boring Company system open to the public, and it moves passengers in Tesla vehicles. A freight service would be a separate product, and the post gave no indication that one is close to launch. For now, it is a truck, a container and a short caption saying they fit together.

Continue Reading

Elon Musk

Elon Musk will give ‘every kid in America’ a SpaceX share in 2027

Published

on

Credit: Grok Imagine

Elon Musk said he is planning to give “every one of his SpaceX shares to every kid in America” in 2027, stating that “this will be the first of many.”

SpaceX went public earlier this year, and its stock price has been relatively stable since leveling off shortly after its IPO. Based on its current price, it’s a gift of just over $10 billion to children across the United States.

It appears to be closely related to President Donald Trump’s bank accounts for children, which were set up earlier this year as Trump Accounts.

Just hours earlier, Anthropic had announced the establishment of its Anthropic Public Benefit Fund, “a new wholly-owned entity dedicated entirely to public benefit.” Musk responded by stating he recommended “giving the shares directly to the public,” and that he would be doing it that way.

Just a little bit later, Musk said children across the U.S. would be getting a share from him:

Advertisement
-

There are roughly 70 million children, meaning someone under the age of 18, in the United States, according to the Federal Interagency Forum on Child and Family Statistics. Musk’s ownership of SpaceX stock shows he has around 849 million Class A shares of SpaceX stock, according to filings with the SEC.

Continue Reading

Elon Musk

Elon Musk reveals why Boring Co’s biggest East Coast project never happened

Published

on

(Credit: The Boring Company)

Elon Musk revealed in a post on X that “Permits were impossible to get,” explaining the fate of The Boring Company’s most ambitious East Coast proposal.

The comment responded to a query about what became of his July 20, 2017 announcement that he had “just received verbal govt approval” for an underground Hyperloop connecting New York City, Philadelphia, Baltimore, and Washington, D.C., capable of carrying passengers from the Big Apple to the Nation’s Capital in just 29 minutes.

The Boring Company receives verbal ‘approval’ to build NY to DC Hyperloop tunnel

The 2017 post, which envisioned city-center stations and multiple elevators in each city, sparked immediate scrutiny. Local and state officials in New York, Philadelphia, Baltimore, and D.C. said they had no knowledge of any approval. A White House spokesperson confirmed only “promising conversations” about the transformative infrastructure.

Musk clarified shortly after that there was “still a lot of work” to do for formal approvals.

Limited progress followed, as Maryland Governor Larry Hogan’s administration issued a conditional utility permit and supported work near Fort Meade. In 2018, Washington, D.C., granted a preliminary permit for site preparation and excavation on a vacant lot at 53 New York Ave. NE in the NoMa neighborhood, which The Boring Company said could become a station.

A draft environmental assessment for a D.C.-Baltimore segment was released in 2019. Yet, by April 2021, the company had removed the project from its website, and the Federal Highway Administration reported receiving no indication of further interest. Communication with Maryland officials had ceased.

The full corridor would have required coordination among the District of Columbia, Maryland, Pennsylvania, New York, the Federal Highway Administration, the Army Corps of Engineers, the National Park Service, and other agencies.

Environmental reviews under the National Environmental Policy Act, utility clearances, and approvals for novel infrastructure added to the overall complexity of the project and its approval.

Speculation on the permitting barriers centers around a few factors, but a multi-state, multi-level route involving unproven high-speed vacuum-tube technology inherently triggers exhaustive safety, environmental, and engineering reviews that can stretch for years, even for conventional projects.

Advertisement
-

There are also other elements, of course, like officials who may face political exposure if a privately funded, untested system encountered anything such as cost overruns, delays, or safety issues. On the outset of this project, there were limited things such as engineering plans or demonstrated technology maturity, which also added to the potential skepticism.

The East Coast vision for Boring Co., once framed as a privately funded revolution that could reshape Northeast travel, quietly ended without construction of the promised network. Musk’s recent statement frames the outcome as a regulatory impasse, unfortunate but not unexpected.

Continue Reading