Connect with us

Energy

Tesla’s million mile battery is a golden goose for large-scale energy projects

Tesla Megapack. | Image: Tesla

Published

on

Tesla Energy is a sleeping giant, rarely considered by analysts covering TSLA stock and largely underrated compared to the company’s electric car business. But something in Tesla’s pipeline may very well be a big catalyst that can fully awaken the behemoth that is the company’s Energy division: the upcoming million-mile battery.

Tesla’s million-mile battery is starting to look very close to production. Patents filed by the company have seemingly teased details about its characteristics. Elon Musk himself has spoken highly about the next-generation batteries, and studies from physicist Jeff Dahn’s team of researchers at Dalhousie University have suggested that such milestones are feasible. Tesla also appears to be gathering the necessary pieces for a massive play on batteries, as hinted at by its acquisition of battery-centric firms like Maxwell and Hibar.

True to its namesake, the million-mile battery is expected to support an electric car for 1 million miles, making them last significantly longer on the roads than comparable petrol-powered vehicles. Such a battery will likely give EVs an even bigger edge compared to their fossil fuel-powered counterparts, especially in terms of practicality. After all, a car that rarely needs maintenance and lasts a million miles is a better buy than one that requires an oil change every 5,000 miles and lasts only about 300,000 miles with extreme care.

(Credit: Tesla)

Electric vehicles are not the only ones that will benefit from Tesla’s million-mile battery. Longer lasting batteries will also be extremely valuable for the company’s energy storage products, making them possibly last decades after their initial installation. This has a lot of positive implications for Tesla Energy, especially with regards to its grid-scale battery solutions. If Tesla’s batteries can match or outlast their fossil fuel-powered grid-scale counterparts, the company could very well see a spike in the demand for its battery storage solutions.

A good example of these benefits lies in how Tesla’s battery storage units are used to support communities that have no access to the power grid. With a million-mile battery, Tesla’s energy storage products could last for a very long time, practically ensuring that communities located off the beaten path could get access to sustainable power for decades.

Advertisement
Tesla Powerpacks were installed on a small town in the Philippines to help address frequent power outages in the area. (Credit: Solar Phils)

The value of Tesla’s battery storage products, such as its Powerpacks and Powerwalls, is only getting more and more prominent with time. Tesla’s projects in South Australia are proof of this. The Hornsdale Power Reserve has saved residents in the region from intermittent blackouts, and the company’s Powerwalls are now being used as the backbone of a 50,000-strong Virtual Power Plant initiative.

Tesla’s million-mile battery can very well be the key for the Powerwall, Powerpack, and Megapack to dominate in their respective segments. A scenario where a Tesla battery storage system lasts decades is not too farfetched either since batteries used for stationary storage are not subject to the same strains experienced by those used in the company’s high-performance electric cars. Tesla’s batteries are already proven to be quick, cost-effective, and high-quality. With the assurance that they will last for a very long time, there’s a good chance that numerous cities and countries across the globe will adopt them for their energy needs.

When this happens, the sleeping giant that is Tesla Energy will likely be awaked fully. Such a scenario bodes incredibly well for Tesla, especially since investing legends such as Ron Baron have estimated that the company’s Energy business has the potential to be worth $500 billion on its own, on par with Tesla’s electric car division. The million-mile battery could very well be the key to this.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Tesla just trademarked MEGAPOD: here’s what it is

Published

on

tesla showroom
(Credit: Tesla)

Tesla just trademarked ‘MEGAPOD’ with the United States Patent and Trademark Office (USPTO), its latest move in what seems to be a hint that the company is incredibly focused on its AI efforts and storage needs as compute increases.

The application carries serial number 99893717 and lists the applicant as Tesla, Inc., located at 1 Tesla Road, Austin, Texas 78725.

The filing remains in ‘live pending’ status, and it is a new application waiting for assignment to an examining attorney. It has not yet been published or registered.

According to the official goods and services description in the application, Tesla describes ‘MEGAPOD’ as:

“Modular data center hardware systems for artificial intelligence computing, comprised of computer servers, computer hardware for artificial intelligence processing, computer networking hardware, electrical power distribution units, and cooling systems, sold as a unit; self-contained modular computing hardware systems for artificial intelligence workloads; integrated computer hardware platforms for artificial intelligence computing, namely, enclosures containing computer hardware, power distribution hardware, and cooling hardware, sold as a unit; downloadable software for monitoring, managing, optimizing, and regulating modular artificial intelligence computing hardware systems.”

This description specifies complete, self-contained modular units that integrate servers and specialized AI processing hardware with networking components, power distribution, and cooling systems. It also includes associated downloadable software for oversight and optimization of these systems. The language emphasizes hardware sold “as a unit” and enclosures that combine the necessary elements for AI computing workloads.

Tesla has an established history of developing and commercializing modular hardware systems. Its Megapack product line, for example, consists of utility-scale battery energy storage systems designed as containerized units for grid applications. The MEGAPOD filing follows a similar pattern of protecting a name for modular, integrated hardware platforms, this time focused on artificial intelligence computing infrastructure.

This could be an early move, especially as Tesla did not have trademark rights to the word ‘Cybercab,’ the name of its self-driving, ride-hailing-focused vehicle.

Trademark applications of this type allow companies to secure priority rights to a name for defined categories of goods and services. The USPTO examines applications for compliance with legal requirements, including distinctiveness and absence of conflicts with prior marks. If the application proceeds successfully through examination, publication, and any opposition period, it could result in a federal trademark registration providing nationwide protection. This is what Tesla’s obvious intention is with ‘MEGAPOD.’

Public reports and analysis suggest MEGAPOD could represent modular, container-style AI computing pods designed for easy deployment. These would bundle servers, AI accelerators, power systems, and cooling into self-contained units suitable for distributed AI workloads. This approach aligns with Tesla’s announced AI compute strategy.

In March 2026, Elon Musk outlined plans for “Digital Optimus” (also referred to as Macrohard), a joint Tesla-xAI project for AI agents capable of handling complex digital tasks. The plans include running these agents on Tesla’s AI4 hardware in parked vehicles as well as dedicated compute units installed at Supercharger stations, which collectively offer substantial unused electrical capacity.

What is Digital Optimus? The new Tesla and xAI project explained

A modular hardware platform like the one described in the ‘MEGAPOD’ filing would support scalable, rapid deployment of such distributed compute resources. It could complement Tesla’s other AI infrastructure efforts, including the Dojo supercomputer used for training models and the development of AI systems for autonomous driving and robotics, by enabling edge or regional AI inference without reliance on traditional centralized data centers.

Continue Reading

Energy

Zuckerberg’s Meta taps Musk’s Tesla for massive clean energy project

Published

on

Credit: Tesla

In a notable intersection of Big Tech powerhouses, Meta, led by Mark Zuckerberg, has partnered with Canadian energy infrastructure giant Enbridge on a significant renewable energy initiative that will rely on battery technology from Elon Musk’s Tesla.

The project, which was announced this week, marks another step in Meta’s aggressive push to power its expanding data center operations with clean energy, dispelling many of the complaints people have about them.

This new development is located near Cheyenne, Wyoming, and will feature a 365-megawatt (MW) solar farm paired with a 200 MW/1,600 megawatt-hour (MWh) battery energy storage system, also known as BESS. Tesla is providing the batteries for the project, valued at roughly $200 million.

The story was originally reported by Utility Dive.

This Wyoming project represents the first phase of Enbridge and Meta’s joint “Cowboy Project.” Once operational, it will deliver power to Meta’s regional data centers through Cheyenne Light, Fuel, and Power under Wyoming’s Large Power Contract Service tariff.

This tariff, originally developed in collaboration with Microsoft and Black Hills Energy, is designed specifically for large loads like data centers. It ensures that the renewable supply serves hyperscale customers without impacting retail electricity rates for other users.

The battery system will operate under a long-term tolling agreement, providing dispatchable capacity that enhances grid reliability. During periods of high demand, the utility can access the backup generation, addressing one of the key challenges of integrating large-scale renewables with the explosive growth of data center electricity demand driven by artificial intelligence.

This latest collaboration builds on prior joint efforts between Enbridge and Meta in Texas, including the 600 MW Clear Fork Solar, 152 MW Easter Wind, and 300 MW Cone Wind projects. Together with the Wyoming initiative, the companies have now partnered on roughly 1.6 gigawatts (GW) of combined solar, wind, and storage capacity.

The deal highlights the intensifying demand for reliable, low-carbon power from technology giants. Meta has committed to supporting its data center growth with renewable energy, joining peers like Microsoft and Google in seeking large-scale solutions. Enbridge’s Allen Capps described the project as “one of the larger utility-scale battery installations supporting U.S. data center operations and growth.”

The involvement of Tesla’s battery technology adds an intriguing layer, linking two of the world’s most prominent tech leaders—Zuckerberg and Musk—in the clean energy transition.

As data centers continue to drive unprecedented electricity load growth across the United States, projects like this one illustrate how hyperscalers are turning to strategic partnerships with traditional energy players and innovative storage solutions to meet both sustainability goals and reliability needs.

Continue Reading

Elon Musk

Why SpaceX just made a $60 billion bet on AI coding ahead of historic IPO

SpaceX has secured an option to acquire Cursor AI for $60 billion ahead of its historic IPO.

Published

on

By

SpaceX announced today it has struck a deal with AI coding startup Cursor, securing the option to acquire the company outright for $60 billion later this year, while committing $10 billion for joint development work in the interim. The announcement described the partnership as building “the world’s best coding and knowledge work AI,” and comes just days after Cursor was separately reported to be raising $2 billion at a valuation above $50 billion.

The move makes strategic sense given where each company currently stands. Cursor currently pays retail prices to Anthropic and OpenAI to the same companies competing directly against it with Claude Code and Codex. That means every dollar of revenue Cursor earns partially funds its own competition. With SpaceX bringing computational infrastructure to the Cursor platform, that could reduce Cursor’s dependence on OpenAI and Anthropic’s Claude AI as its providers. Access to SpaceX’s Colossus supercomputer, with compute equivalent to one million Nvidia H100 chips, gives Cursor the infrastructure to run and train its own models at a scale it could never afford independently. That one change restructures the entire unit economics of the business.

Elon Musk teases crazy outlook for xAI against its competitors

Cursor’s $2 billion in annualized revenue and enterprise reach across more than half of Fortune 500 companies gives SpaceX something its xAI subsidiary currently lacks, which is a proven, fast-growing software business with real enterprise distribution.

For Cursor, SpaceX’s $10 billion in joint development funding is transformational. Cursor raised $3.3 billion across all of 2025 to reach that $2 billion in revenue. A single $10 billion commitment from SpaceX, even as a development payment rather than an acquisition, dwarfs everything Cursor has raised in its entire existence. That capital accelerates product development, enterprise sales infrastructure, and proprietary model training simultaneously.

The timing is deliberate. SpaceX filed confidentially with the SEC on April 1, 2026, targeting a June listing at a $1.75 trillion valuation, in what would be the largest public offering in history. The company is expected to begin its roadshow the week of June 8, with Bank of America, Goldman Sachs, JPMorgan, and Morgan Stanley serving as underwriters. Adding Cursor to the portfolio before that roadshow gives IPO investors a concrete enterprise software revenue story to price in, alongside rockets and satellite internet.

The deal also addresses a weakness that became visible after February’s xAI merger. Several xAI co-founders departed following that acquisition, and SpaceX had already hired two Cursor engineers, signaling where its AI talent strategy was heading. Cursor, for its part, faces a pricing disadvantage competing against Anthropic’s Claude Code.

Whether SpaceX exercises the full acquisition option before its IPO or after remains the open question. Either way, this deal reshapes what investors will be buying into when SpaceX goes public.

Continue Reading