Connect with us

News

Rivian partners with Tennessee State Parks for EV Charging Stations

Credit: Rivian

Published

on

Rivian is partnering with the Tennessee Department of Environment and Conservation (TDEC) to install electric vehicle charging stations at Tenessee State Parks. The charging stations are likely to be installed at all 56 State Parks in the State of Tennessee, “depending on the availability of electricity and planned future park upgrades.”

The TDEC made the announcement on its website on Wednesday.

“Tennessee is at the forefront of innovation and infrastructure development, and we’re committed to the future of the automotive industry,” State Governor Bill Lee said. “This collaboration will support Tennessee jobs and enhance our already unmatched state parks.” 

Rivian has been working on releasing its first electric vehicle, the R1T pickup truck, later this year. Recently, the company announced that its anticipated July deliveries had been pushed back to September. However, the company is still preparing its owners to have a wide variety of options regarding its charging infrastructure. Earlier this year, Rivian unveiled the Adventure Network, composed of 3,500 fast chargers and 600 total sites by 2023.

Advertisement

The partnership with the TDEC matches perfectly with Rivian’s ideals for its products. Since Day 1, it seems that Rivian has catered to the outdoorsman and adventurers of the world. Its vehicles are primed for easy navigation through some of the toughest terrain imaginable thanks to its quad-motor powertrain, allowing for up to three feet of wading depth, 11,000 pounds of towing capacity, and a 3-second 0-60 time.

The adoption of electric vehicles in Tennessee primes Rivian for the perfect partnership with the TDEC, Commissioner David Salyers said. “As Tennesseans increasingly rely on electric vehicles, our state parks can play a significant role to enable recreation in all corners of our state. TDEC is committed to clean air, and the shift toward electric vehicles is an excellent step forward for air quality.”

First Look at Rivian R1T’s interior, UI, and controls in action [photos]

Rivian will oversee the installation and design of Level 2 chargers that would charge any EV on the road. Offering 11.5 kW of power, this will be perfect for any EV owner who wishes to charge their vehicle overnight or for someone who just wants to stop by for a day trip. The chargers at the Tennessee State Parks will initially be free, according to the press release from the TDEC, and any future cost depends on systemwide utilization to recover electricity costs.

Advertisement

Rivian will cover network access fees, equipment service, and maintenance for 10 years. Upgrades associated with the charger installation will be at no cost to the state or its taxpayers.

Commissioner of the Tennessee Department of Tourist Development, Mark Ezell, said “We are very excited for this partnership, and for TDEC and Tennessee State Parks’ commitment to sustainable travel, ensuring residents and visitors enjoy the state for generations to come. Tennessee offers unsurpassed natural beauty, and we’re thrilled this project will bring visitors to state parks, rural communities, and cities.”

Don’t hesitate to contact us with tips! Email us at tips@teslarati.com, or you can email me directly at joey@teslarati.com.

Advertisement

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

SpaceX to become America’s Military data backbone for missiles, drones, and warfighters

The Space Force just handed SpaceX $2.29 billion to build the military’s space internet backbone.

Published

on

By

US Golden Dome space defense system (Concept render by Grok)

The U.S. Space Force awarded SpaceX a $2.29 billion contract on May 26, 2026 to build the backbone of its Space Data Network, a satellite-based communications system designed to keep American military forces connected anywhere on Earth in real time. The contract is firm-fixed-price and requires SpaceX to deliver a fully operational prototype by the end of 2027.

In plain terms, the SDN Backbone is the plumbing behind the military’s space-based internet. It functions as a low Earth orbit satellite constellation providing robust, high-capacity, and low-latency data transport for the Joint Force, connecting sensors and weapons systems continuously, globally, and securely. Think of it as a private, hardened version of Starlink built specifically for battlefield communications, one that soldiers, ships, and aircraft can rely on even in contested environments where ground-based networks have been disrupted.

SpaceX is quietly becoming the U.S. Military’s only reliable rocket

The Space Force was direct about why SpaceX was selected. “The SDN Backbone leverages the best of commercial innovation and delivers a strong foundation for the SDN mission set — a huge benefit and enabler for our warfighters,” said USSF Col. Ryan Frazier.

Advertisement

“We aren’t trading speed for scale; we are demanding both. By using rapid prototyping and Other Transaction Authorities, we are ensuring our advanced solutions are integrated and delivered to the warfighter as fast as possible,” added USSF Lt. Col. Fry, SDN Backbone system program manager.

The SDN Backbone will work alongside the Space Development Agency’s Transport Layer, with the two systems forming a unified open architecture to provide critical data transport for current and future Department of War missions.

As Teslarati has reported, this is not SpaceX’s first Space Force contract of 2026. In April, the Space Force awarded SpaceX $178.5 million to launch missile tracking satellites, and SpaceX is already embedded in the Golden Dome missile defense software group. The $2.29 billion SDN Backbone award puts SpaceX at the center of how the American military communicates in space, a position with direct implications for its reported $1.75 trillion IPO valuation as the company heads toward a public offering as early as June 2026.

Advertisement
Continue Reading

News

Tesla’s dedicated Optimus factory construction officially underway at Giga Texas

Published

on

(Credit: Tesla)

Tesla’s dedicated factory for building up to ten million Optimus units is officially under construction at Gigafactory Texas.

Drone footage released on May 27 by Giga Texas observer Joe Tegtmeyer captures the significant milestone of the first steel structure officially standing at Tesla’s new Optimus factory on the North Campus of the facility.

Phase two of land reclamation is advancing steadily, and the progress will let the new building extend nearly the full length of the main Giga Texas factory, potentially exceeding 4,000 feet, while measuring somewhere between 50 and 70 meters narrower. Extensive foundation work is proceeding as well.

This facility forms a central element of Tesla’s broader North Campus expansion at Giga Texas. The project will add more than 5.2 million square feet of new industrial space. It sits alongside other advanced developments, including a Terafab for next-gen AI chips. The scale reflects Tesla’s commitment to transforming humanoid robotics into a core pillar of the company’s future.

Musk has said that Optimus will be the biggest product in the world on several occasions. He believes it will be Tesla’s biggest valuation contributor.

Advertisement

Tesla prepares to expand Giga Texas with new Optimus production plant

Tesla plans to build about 10 million robots at the site annually once it is completed, which would be about 27,000 units each day.

The Optimus plant at Giga Texas is part of Tesla’s phased strategy for Optimus manufacturing. In an effort to start production of the robot well before the Giga Texas plant is complete, Tesla ended production of the Model S and Model X vehicles, which were built in Fremont, California, to make way for initial Optimus manufacturing efforts.

Production there will start in either July or August of this year, and early units will support internal factory tasks while the team gathers real-world data to refine processes. The Gigafactory Texas facility will house a second-gen production line. It targets high-volume output starting in Summer 2027.

Advertisement

Musk has repeatedly described Optimus as potentially more valuable than Tesla’s entire vehicle business. Current versions are already completing minor tasks around various facilities, while Tesla continues to refine its abilities and add new features.

Tesla’s total investment could reach several billion dollars. Significant challenges lie ahead, including the creation of an entirely new manufacturing ecosystem, the refinement of AI systems for dependable autonomy, and the development of reliable supply chains for actuators, sensors, and other components.

Nevertheless, the visible progress at Giga Texas highlights Tesla’s capacity to translate ambitious concepts into physical reality.

Tesla’s Optimus factory stands as much more than a simple expansion project, as it is quite literally the second phase of what could potentially be the biggest product ever. With construction beginning, 2027 is poised to become a transformative year for Tesla, as it evolves even further from an electric vehicle leader into a pioneer of intelligent, general-purpose machines.

Advertisement
Continue Reading

News

Tesla teases going Plaid Mode with the Model 3

Published

on

Credit: Tesla

Tesla Vice President of Vehicle Engineering, Lars Moravy, recently revealed the company has thought about introducing a Plaid powertrain on the Model 3, but there could be some challenges involved.

On the Ride the Lightning podcast, Moravy revealed that he thinks about a Plaid Model 3 “all the time,” and it certainly has a place in Tesla’s potential lineup of future vehicles.

Now that the Plaid powertrain is technically defunct due to the newfound absence of the Model S and Model X, Tesla could find a way to reintroduce the lightning-quick trim level to its mass-market vehicles.

But there are going to be some challenges with it. Moravy said that the Model 3 Plaid would likely adopt the carbon-sleeved motors that the Model S Plaid had. However, packaging would be a major challenge, as Moravy said on the podcast, it would be a “tight engineering squeeze.”

Advertisement

It’s important to note that there are no active production plans for the Model 3 Plaid at this point, but it’s also worth noting that with the Model S and Model X Plaid no longer available, Tesla would likely be willing to introduce something that is even more white-knuckle than the Model 3 Performance, which already boasts a 2.9-second 0-60 MPH acceleration rate and a top speed of 163 MPH.

Of course, there is the Roadster, but we don’t know when that will exactly make it to market, and we know that, for sure, it will not be accessible to many.

Tesla unveils juicy new detail on the Roadster and hints at new unveil timeline

Tesla has prided itself in building some of the best cars out there, but they’re also interested in building cars that are simply fun to be in.

Advertisement

A Plaid Model 3 could truly push the limits and could end up being one of the best cars Tesla will ever build, especially if it can shave off at least half of a second from its 0-60 MPH time and increase its top speed slightly.

More than anything, the real changes will be in the ride and aerodynamics. Tesla improving things like the suspension, handling, and downforce will be the true trademarks of its Plaid powertrain; putting it in the Model 3 could be a great move for the company and for customers interested in high-end performance.

Continue Reading