Connect with us
giga-berlin-night-employees-3 giga-berlin-night-employees-3

News

Tesla hasn’t received “a single cent” of gov’t funding for Giga Berlin: report

Image Credit: Tobias Lindh/Twitter

Published

on

A recent report from Germany has suggested something quite interesting about Tesla Gigafactory Berlin. The Model Y factory has not received a single cent in government subsidies as of date. 

Giga Berlin has been operational for almost a year now, producing Tesla Model Y crossovers for the market. The factory is still ramping up its operations, but it is already employing thousands of people. Brandenburg Economic Minister Jorg Steinbach has noted in a previous statement that the facility employs about 9,000 people. 

As per German publication BZ, Giga Berlin has not received a single cent of government subsidies since it started construction. This is quite surprising as companies that build new factories in Germany typically receive government help. The state and federal government even pay up to 45% of the factory’s costs at times, the publication noted. 

Tesla actually submitted an application for funding in November 2020, over two years ago. But as per Brandenburg’s Ministry of Economic Affairs, Tesla has been unsuccessful so far. “Tesla has not received a single cent of funding so far. A state aid notification procedure is currently underway in Brussels for Tesla’s application,” the Ministry said. 

A decision on Tesla Giga Berlin’s funding, whether it gets approved and how much it qualifies for, would depend on the EU Commission.

As per the German publication, the main reason behind Giga Berlin’s lack of government funding is the company itself. Tesla moves very quickly, and it changes plans as better options arise. This is true for the company’s vehicles, and as it turns out, it’s also true for its factories. Initially, Tesla reportedly planned 1.1 billion euros, but the company “changed the application amount very often” and new extensions for Giga Berlin kept being submitted. 

Advertisement
-

That being said, the Ministry noted that Tesla’s application for government funding is an “ongoing process.” Tesla is also reportedly poised to receive 6.8% funding for Giga Berlin. This means that if construction costs reach 2 billion euros, the funding could reach 136 million.

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Elon Musk will give ‘every kid in America’ a SpaceX share in 2027

Published

on

Credit: Grok Imagine

Elon Musk said he is planning to give “every one of his SpaceX shares to every kid in America” in 2027, stating that “this will be the first of many.”

SpaceX went public earlier this year, and its stock price has been relatively stable since leveling off shortly after its IPO. Based on its current price, it’s a gift of just over $10 billion to children across the United States.

It appears to be closely related to President Donald Trump’s bank accounts for children, which were set up earlier this year as Trump Accounts.

Just hours earlier, Anthropic had announced the establishment of its Anthropic Public Benefit Fund, “a new wholly-owned entity dedicated entirely to public benefit.” Musk responded by stating he recommended “giving the shares directly to the public,” and that he would be doing it that way.

Just a little bit later, Musk said children across the U.S. would be getting a share from him:

There are roughly 70 million children, meaning someone under the age of 18, in the United States, according to the Federal Interagency Forum on Child and Family Statistics. Musk’s ownership of SpaceX stock shows he has around 849 million Class A shares of SpaceX stock, according to filings with the SEC.

Continue Reading

Elon Musk

Elon Musk reveals why Boring Co’s biggest East Coast project never happened

Published

on

(Credit: The Boring Company)

Elon Musk revealed in a post on X that “Permits were impossible to get,” explaining the fate of The Boring Company’s most ambitious East Coast proposal.

The comment responded to a query about what became of his July 20, 2017 announcement that he had “just received verbal govt approval” for an underground Hyperloop connecting New York City, Philadelphia, Baltimore, and Washington, D.C., capable of carrying passengers from the Big Apple to the Nation’s Capital in just 29 minutes.

The Boring Company receives verbal ‘approval’ to build NY to DC Hyperloop tunnel

The 2017 post, which envisioned city-center stations and multiple elevators in each city, sparked immediate scrutiny. Local and state officials in New York, Philadelphia, Baltimore, and D.C. said they had no knowledge of any approval. A White House spokesperson confirmed only “promising conversations” about the transformative infrastructure.

Musk clarified shortly after that there was “still a lot of work” to do for formal approvals.

Limited progress followed, as Maryland Governor Larry Hogan’s administration issued a conditional utility permit and supported work near Fort Meade. In 2018, Washington, D.C., granted a preliminary permit for site preparation and excavation on a vacant lot at 53 New York Ave. NE in the NoMa neighborhood, which The Boring Company said could become a station.

A draft environmental assessment for a D.C.-Baltimore segment was released in 2019. Yet, by April 2021, the company had removed the project from its website, and the Federal Highway Administration reported receiving no indication of further interest. Communication with Maryland officials had ceased.

The full corridor would have required coordination among the District of Columbia, Maryland, Pennsylvania, New York, the Federal Highway Administration, the Army Corps of Engineers, the National Park Service, and other agencies.

Environmental reviews under the National Environmental Policy Act, utility clearances, and approvals for novel infrastructure added to the overall complexity of the project and its approval.

Speculation on the permitting barriers centers around a few factors, but a multi-state, multi-level route involving unproven high-speed vacuum-tube technology inherently triggers exhaustive safety, environmental, and engineering reviews that can stretch for years, even for conventional projects.

There are also other elements, of course, like officials who may face political exposure if a privately funded, untested system encountered anything such as cost overruns, delays, or safety issues. On the outset of this project, there were limited things such as engineering plans or demonstrated technology maturity, which also added to the potential skepticism.

The East Coast vision for Boring Co., once framed as a privately funded revolution that could reshape Northeast travel, quietly ended without construction of the promised network. Musk’s recent statement frames the outcome as a regulatory impasse, unfortunate but not unexpected.

Continue Reading

Elon Musk

Tesla CEO Elon Musk reminds everyone about Roadster’s true meaning

Published

on

Elon Musk addresses the crowd next to the new Tesla Roadster, which Tesla offers in Performance, Thrust and Rocket versions. (Image: Tesla/X)
Elon Musk addresses the crowd next to the new Tesla Roadster, which Tesla offers in Performance, Thrust and Rocket versions. (Image: Tesla/X)

Tesla CEO Elon Musk took to his social media platform X on Sunday to remind everyone that the Roadster’s true meaning is not about company growth or adding dollars to shareholders’ pockets. Sometimes, you just do things because you can.

Following the Roadster’s epic unveiling event last Thursday, skeptics and critics of the company or the project itself came out to say that the vehicle is a pointless project because it is not geared toward growing the company, delivering supreme margins for profitability, nor does it contribute to the big picture of Artificial/Super Intelligence.

But that’s just the thing: Roadster is not meant to be some shareholder dream; it’s meant to be a vehicle that people buy just because it is something awesome, unique, and the first of its kind.

Tesla Roadster: Three configs, one can fly, 0-60 in 0.8 seconds

Musk had to remind those who are skeptical about the Roadster’s importance to the company mission that while it is not a major contributor to Tesla’s long-term goals, it is something that is being built just because it can be:

“Optimus and Cybercab will be the vast majority of Tesla’s value. The only things that will scale to incredible size (K2 and beyond) economically are super intelligence, robots, solar power, and mass to space. And, of course, if you have the first two, the rest will follow. But Roadster is super cool, so we’re doing it anyway.”

Musk has said on many occasions that Optimus would be the project that would make up the vast majority of Tesla’s value in the coming years.

Robotics will be a major focus of Tesla over the coming years, especially as Musk believes Optimus will enable work to be optional for humans and will enable what he calls “High Universal Income.”

Cybercab will be a passive income opportunity for owners, Musk and Tesla have said for a very long time, as a fleet of self-driving vehicles will operate within a ride-hailing Robotaxi service that won’t require a human driver to be present.

Tesla investors are more than enthusiastic about the company’s future projects, at least from a general consensus perspective. However, it is important to note that the Roadster is a fun and cool project that pushes the boundaries of what people thought was possible for an automobile.

What we saw last week was the first true example of a flying car, and despite the backlash about how it might not contribute to Tesla’s grand ambitions, it’s okay to have fun sometimes, too.

Continue Reading