News
Tesla’s new Supercharger stations from November 8-15
Tesla seems to be deploying its Supercharger stations faster than ever, and its V4 charging hardware has been spotted in several countries. From November 8 to 15, Tesla announced 22 new Supercharger locations for 255 individual charging stalls, mainly in North America.
New Superchargers can be seen on Tesla’s charging account on X, which posts new stations along with any significant updates to its electric vehicle (EV) charging business. Since the beginning of this month, Tesla has highlighted several new Superchargers, notably including the opening of a V4 Supercharger at its Gigafactory outside of Berlin, Germany.
Interestingly, you can see that some of the pictured Supercharger stations on the account definitely include Tesla’s V4 hardware. However, the company’s Supercharger map still shows these sites to only be offering only up to 250 kW of charging capacity, which is the same as what Tesla’s V3 chargers can offer. At some point in the future, Tesla will likely turn these sites on to offer up to 350 kW for even faster charging.
One such V4 Supercharger site includes one we reported on while it was being built in East Point, Georgia just last month, also highlighting the speed at which Tesla is putting these new stations up.
In any case, most EV drivers are likely to appreciate the speed at which these are rolling out, especially with nearly every automaker set to gain access to Tesla’s charging stations in the years to come.
You can check out all the Superchargers Tesla announced between November 8 and 15 below. Follow the links to see images from the Tesla Charging account or see the sites on the company’s Supercharger map.
Tesla Superchargers: new locations announced from 11/8 through 11/15
| Location | Stalls | Notes | Links/Images |
|
Bradley, Illinois, U.S. Meijer 990 N Kinzie Ave Bradley IL 60915
|
12
|
||
|
Salem, Virginia, U.S. Sheetz 1435 Apperson Dr Salem VA 24153
|
8 |
||
|
Petaling Jaya, Malaysia Sunway Pyramid, Petaling Jaya 3 Jalan PJS 11/15 PJ SELANGOR 47500
|
4 |
||
|
Tokyo – Senju, Japan 123-0852 AdachiSekibara1-12-21
|
6 |
||
|
Stoney Creek, Virginia, U.S. Davis Travel Center 13306 Saint John Church Rd Stony Creek, VA 23882
|
8 |
||
|
New Castle, Delaware, U.S. Wawa 183 Airport Rd New Castle DE 19720
|
16 |
||
|
Tesla Gigafactory Berlin Tesla Gigafactory Berlin-Brandenburg 1 Tesla Straße Grünheide (Mark) Brandenburg 15537
|
19 |
V4 stalls pictured open to all EVs |
|
|
Kaohsiung – Nanzih Tuku PXMart, Taiwan KaohsiungTuku 3rd RdNo. 57 811
|
6 |
||
|
South Yarra, Victoria, Australia Secure Parking – Como Centre Car Park 650 Chapel St South Yarra VIC 3141
|
6 |
||
|
Hsinchu – Qionglin, Taiwan Hsinchu Wende 2nd St 307
|
6 |
||
|
Tesla Centre, Bangkok, Thailand Tesla Centre 7, 7/1 Ramkhamhaeng Rd Bangkok KRUNG THEP MAHA NAKHON 10240
|
12 |
||
|
Marietta, Georgia, U.S. Terrace at Windy Hill 3000 Windy Hill Rd SE Marietta GA 30067
|
16 |
||
|
Port Deposit, Maryland, U.S. 1201 Chesapeake Overlook Pkwy Port Deposit MD 21904
|
16 |
||
|
Norcross, Georgia, U.S. Village at Peachtree Corners 5270 Peachtree Pkwy NW Norcross GA 30092
|
16 |
||
|
Calgary, Alberta, Canada Smartcentres Calgary Southeast 4705 130 Avenue Southeast Calgary, AB T2Z 4J2
|
8 |
||
|
Columbia, South Carolina, U.S. Lowes Foods of Forest Acres 4711 Forest Dr Columbia SC 29206
|
12 |
V4 stalls pictured |
|
|
Pittsburgh, Pennsylvania, U.S. Target 2661 Freeport Rd Pittsburgh PA 15238
|
16 |
||
|
Lawrenceville, Georgia, U.S. Snellville Exchange 1150 Scenic Hwy N Lawrenceville GA 30045
|
16 |
||
|
Grimsby, Ontario, CA 417 S Service Rd Grimsby ON L3M 4E8
|
8 |
||
|
Coquitlam, British Columbia, CA Tim Horton 1450 United Blvd Coquitlam BC V3K 6Y2
|
16 |
||
|
Jackson, Michigan, U.S. Meijer 2777 Airport Rd Jackson, MI 49202
|
12 |
||
|
East Point, Georgia, U.S. Lowe’s Home Improvement 3625 N Commerce Dr East Point GA 30344
|
16 |
V4 stalls pictured |
Updated 11/16/23: Corrected second to last site to “Jackson, Michigan” after it was incorrectly written “Jackson, Missouri” upon publish.
Tesla surpasses 2,000 active Supercharger stations in the U.S.
What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send your tips to us at tips@teslarati.com.
News
Tesla ships out update that brings massive change to two big features
“This change only updates the name of certain features and text in your vehicle,” the company wrote in Release Notes for the update, “and does not change the way your features behave.”
Tesla has shipped out an update for its vehicles that was caused specifically by a California lawsuit that threatened the company’s ability to sell cars because of how it named its driver assistance suite.
Tesla shipped out Software Update 2026.2.9 starting last week; we received it already, and it only brings a few minor changes, mostly related to how things are referenced.
“This change only updates the name of certain features and text in your vehicle,” the company wrote in Release Notes for the update, “and does not change the way your features behave.”
The following changes came to Tesla vehicles in the update:
- Navigate on Autopilot has now been renamed to Navigate on Autosteer
- FSD Computer has been renamed to AI Computer
Tesla faced a 30-day sales suspension in California after the state’s Department of Motor Vehicles stated the company had to come into compliance regarding the marketing of its automated driving features.
The agency confirmed on February 18 that it had taken a “corrective action” to resolve the issue. That corrective action was renaming certain parts of its ADAS.
Tesla discontinued its standalone Autopilot offering in January and ramped up the marketing of Full Self-Driving Supervised. Tesla had said on X that the issue with naming “was a ‘consumer protection’ order about the use of the term ‘Autopilot’ in a case where not one single customer came forward to say there’s a problem.”
This was a “consumer protection” order about the use of the term “Autopilot” in a case where not one single customer came forward to say there’s a problem.
Sales in California will continue uninterrupted.
— Tesla North America (@tesla_na) December 17, 2025
It is now compliant with the wishes of the California DMV, and we’re all dealing with it now.
This was the first primary dispute over the terminology of Full Self-Driving, but it has undergone some scrutiny at the federal level, as some government officials have claimed the suite has “deceptive” names. Previous Transportation Secretary Pete Buttigieg was one of those federal-level employees who had an issue with the names “Autopilot” and “Full Self-Driving.”
Tesla sued the California DMV over the ruling last week.
News
Tesla workers push back against Giga Berlin unionization
“IG Metall did not succeed in Giga Berlin‘s works council election earlier today. The union share was reduced from nearly 40% in 2024 to 31% in 2026! This is a clear message by the Giga Berlin team towards an independent co-determination! The list called Giga United, led by the current chairwoman, Michaela Schmitz, received the most votes with more than 40%! Good news for Giga Berlin!”
Tesla workers pushed back against unionization efforts at Gigafactory Berlin, and over the past few years, there has been a dramatic decrease in interest to unionize at the German plant.
Gigafactory Berlin Plant Manager André Thierig announced on Wednesday that IG Metall, the European union group, saw its share reduce from 40 to 31 percent in 2026 as employees eligible to vote on the issue. Instead, the Giga Berlin team, known as Giga United, received the most votes with more than 40 percent.
BREAKING! 🚨
IG Metall did not succeed in Giga Berlin‘s works council election earlier today. The union share was reduced from nearly 40% in 2024 to 31% in 2026!
This is a clear message by theGiga Berlin team towards an independent co-determination!
The list called Giga…
— André Thierig (@AndrThie) March 4, 2026
Thierig gave specific details in a post on X:
“IG Metall did not succeed in Giga Berlin‘s works council election earlier today. The union share was reduced from nearly 40% in 2024 to 31% in 2026! This is a clear message by the Giga Berlin team towards an independent co-determination! The list called Giga United, led by the current chairwoman, Michaela Schmitz, received the most votes with more than 40%! Good news for Giga Berlin!”
There were over 10,700 total employees who were eligible to vote, with 87 percent of them turning out to cast what they wanted. There were three key outcomes: Giga United, IG Metall, and other notable groups, with the most popular being the Polish Initiative.
The 37-seat council remains dominated by non-unionized representatives, preserving Giga Berlin as Germany’s only major auto plant without a collective bargaining agreement.
Thierig and Tesla framed the outcome as employee support for an “independent, flexible, and unbureaucratic” future, enabling acceleration on projects like potential expansions or new models. IG Metall expressed disappointment, accusing management of intimidation tactics and an “unfair” campaign.
The first election of this nature happened back in 2022. In 2024, IG Metall emerged as the largest single faction with 39.4 percent, but non-union lists coalesced for a majority.
But this year was different. There was some extra tension at Giga Berlin this year, as just two weeks ago, an IG Metall rep was accused by Tesla of secretly recording a council meeting. The group countersued for defamation.
Tesla Giga Berlin plant manager faces defamation probe after IG Metall union complaint
This result from the 2026 vote reinforced Tesla’s model of direct employee-management alignment over traditional German union structures, amid ongoing debates about working conditions. IG Metall views it as a setback but continues advocacy. Tesla sees it as validation of its approach in a competitive EV market.
This outcome may influence future labor dynamics at Giga Berlin, including any revival of expansion plans or product lines, which Musk has talked about recently.
News
SpaceX President Gwynne Shotwell details xAI power pledge at White House event
The commitment was announced during an event with United States President Donald Trump.
SpaceX President Gwynne Shotwell stated that xAI will develop 1.2 gigawatts of power at its Memphis-area AI supercomputer site as part of the White House’s new “Ratepayer Protection Pledge.”
The commitment was announced during an event with United States President Donald Trump.
During the White House event, Shotwell stated that xAI’s AI data center near Memphis would include a major energy installation designed to support the facility’s power needs.
“As you know, xAI builds huge supercomputers and data centers and we build them fast. Currently, we’re building one on the Tennessee-Mississippi state line. As part of today’s commitment, we will take extensive additional steps to continue to reduce the costs of electricity for our neighbors…
“xAI will therefore commit to develop 1.2 GW of power as our supercomputer’s primary power source. That will be for every additional data center as well. We will expand what is already the largest global Megapack power installation in the world,” Shotwell said.
She added that the system would provide significant backup power capacity.
“The installation will provide enough backup power to power the city of Memphis, and more than sufficient energy to power the town of Southaven, Mississippi where the data center resides. We will build new substations and invest in electrical infrastructure to provide stability to the area’s grid.”
Shotwell also noted that xAI will be supporting the area’s water supply as well.
“We haven’t talked about it yet, but this is actually quite important. We will build state-of-the-art water recycling plants that will protect approximately 4.7 billion gallons of water from the Memphis aquifer each year. And we will employ thousands of American workers from around the city of Memphis on both sides of the TN-MS border,” she noted.
The Ratepayer Protection Pledge was introduced as part of the federal government’s effort to address concerns about rising electricity costs tied to large AI data centers, as noted in an Insider report. Under the agreement, companies developing major AI infrastructure projects committed to covering their own power generation needs and avoiding additional costs for local ratepayers.