Connect with us
tesla 4680 tesla 4680

News

Tesla 4680 battery cell program hits major milestones in Q2 2024

Image used with permission for Teslarati. (Credit: Tom Cross)

Published

on

Tesla’s 4680 battery cell program saw some notable milestones in the second quarter of 2024.

Tesla noted in its Q2 2024 Update Letter that it was able to produce 50% more 4680 cells in the second quarter compared to Q1 2024. The company also noted that in Q2, it was also able to successfully build the first validation Cybertruck equipped with in-house dry cathode 4680 cells. 

“In Q2, we produced over 50% more 4680 cells than in Q1 and continued to see cost improvements. In July, we entered validation of vehicle testing for our first prototype Cybertruck produced with in-house dry cathode 4680 cells – a major cost reduction milestone once ramped. Cost reduction across our product lineup remains a top priority,” Tesla wrote in its Q2 2024 Update Letter

Recent reports have suggested that Tesla is planning to mass produce and install 4680 cells with dry electrodes to consumer vehicles before the end of the year. Citing people reportedly familiar with the matter, Chinese publication LatePost noted that the 4680 cell’s complete iteration features negative and positive electrodes that are produced using Tesla’s in-house dry electrode process.

Advertisement

As per the publication, Tesla’s current 4680 cells reportedly feature a negative electrode that’s produced using the company’s dry electrode process, as well as a positive electrode that’s acquired from a supplier. Since the positive electrodes are sourced from a supplier, they are produced using conventional wet cathode processes.

If Tesla is able to successfully ramp the production of the 4680 cells’ complete iteration, the electric vehicle maker could see substantial cost savings for its vehicles. Tesla Vice President of Vehicle Engineering Lars Moravy summarized the milestones of the 4680 program in the second quarter during the Q2 2024 earnings call

“4680 production ramped strongly in Q2, delivering 51% more sales than Q1, while reducing COGS significantly. We currently produce more than 1,400 Cybertrucks of 4680 cells a week. We’ll continue to ramp upward as we drive cost down further toward the cost parity target we set for the end of the year. 

“We’ve built our first validation Cybertruck with dry cathode process made on mass production equipment, which is a huge technical milestone, and we’re super proud of that. We’re on track for production launch with the dry cathode in Q4. And this will enable cell costs to be significantly below available alternatives which was the original goal of the 4680 program,” Moravy said. 

Advertisement

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Tesla Cybercab coming next to Giga Berlin, Optimus possibly after

“From a next major product standpoint, I think most likely is the Tesla Cybercab,” Musk said.

Published

on

Credit: Cybercab

Tesla could add the Cybercab and Optimus humanoid robot to the production lineup at Giga Berlin, as per recent comments from CEO Elon Musk. 

During a recent interview with Giga Berlin plant manager André Thierig, Musk identified the Cybercab as the most likely next major product for the German factory, with Optimus potentially following after.

“From a next major product standpoint, I think most likely is the Tesla Cybercab,” Musk said. He added that there are also “possibilities of Tesla Optimus” being produced in the facility.

Tesla has already begun production of the Cybercab in Giga Texas, with volume production expected to ramp this year. Based on Musk’s comments, it appears that if conditions align in Europe, Giga Berlin could eventually join that effort.

Advertisement

The CEO’s comments about Optimus coming to Gigafactory Berlin are quite unsurprising too considering that Musk has mentioned in the past that the humanoid robot will likely be Tesla’s highest volume product in the long run. 

Giga Berlin will likely be able to produce mass volumes of Optimus, as the Model S and Model X lines being converted to an Optimus line in the Fremont Factory are already expected to produce 1 million units of the humanoid robot annually. 

Apart from his comments about the Cybercab and Optimus, Elon Musk also confirmed that Giga Berlin has started ramping battery cell production and will continue expanding Model Y output, particularly as supervised Full Self-Driving (FSD) gains regulatory approvals in Europe.

Taken together, the remarks suggest Berlin’s role could evolve beyond vehicle assembly into a broader multi-product manufacturing hub, not just a regional Model Y plant.

Advertisement
Continue Reading

Energy

Tesla Powerwall distribution expands in Australia

Inventory is expected to arrive in late February and official sales are expected to start mid-March 2026.

Published

on

Credit: Tesla

Supply Partners Group has secured a distribution agreement for the Tesla Powerwall in Australia, with inventory expected to arrive in late February and official sales beginning in mid-March 2026.

Under the new agreement, Supply Partners will distribute Tesla Powerwall units and related accessories across its national footprint, as noted in an ecogeneration report. The company said the addition strengthens its position as a distributor focused on premium, established brands.

“We are proud to officially welcome Tesla Powerwall into the Supply Partners portfolio,” Lliam Ricketts, Co-Founder and Director of Innovation at Supply Partners Group, stated.

“Tesla sets a high bar, and we’ve worked hard to earn the opportunity to represent a brand that customers actively ask for. This partnership reflects the strength of our logistics, technical services and customer experience, and it’s a win for installers who want premium options they can trust.”

Advertisement

Supply Partners noted that initial Tesla Powerwall stock will be warehoused locally before full commercial rollout in March. The distributor stated that the timing aligns with renewed growth momentum for the Powerwall, supported by competitive installer pricing, consumer rebates, and continued product and software updates.

“Powerwall is already a category-defining product, and what’s ahead makes it even more compelling,” Ricketts stated. “As pricing sharpens and capability expands, we see a clear runway for installers to confidently spec Powerwall for premium residential installs, backed by Supply Partners’ national distribution footprint and service model.”

Supply Partners noted that a joint go-to-market launch is planned, including Tesla-led training for its sales and technical teams to support installers during the home battery system’s domestic rollout.

Continue Reading

Elon Musk

Tesla Giga Berlin growth could stall if not “free from external influences”: Elon Musk

The comments were delivered in a pre-recorded video discussion.

Published

on

Credit: Andre Thierig/X

Tesla CEO Elon Musk has reportedly warned that future expansion of Gigafactory Berlin could be jeopardized if the site does not remain “free from external influences.”

Musk’s comments were delivered in a pre-recorded video discussion with employees and came at a sensitive moment for the facility, where union representation has been a recurring issue.

According to reports from Handelsblatt and Der Spiegel, citing participants at the event, Musk suggested that if Giga Berlin is no longer “free from external influences,” further expansion would become unlikely. He did not, however, hint that the plant would shut down.

While Musk did not name IG Metall directly, his remarks were widely interpreted as referencing the union, which is currently the largest faction on the works council but does not hold a majority, as noted in an electrive report. 

Advertisement

The video conversation was conducted between Musk in Austin and Grünheide plant manager André Thierig, then played back to the workforce in Germany. Works council elections are scheduled for early March, heightening the tension between management and organized labor.

The CEO has previously voiced concerns that stronger union influence could limit Tesla’s operational flexibility and long-term strategy in Germany.

Despite the warning on expansion, Musk praised the Giga Berlin site during the same address, describing it as one of the most advanced factories worldwide and highlighting its cleanliness and team culture.

The discussion also reportedly touched on battery cell production. According to attendees cited in German media, Musk indicated that Tesla has begun ramping cell production at the site. That would mark a notable shift from earlier expectations that large-scale cell manufacturing in Brandenburg would not begin until 2027.

Advertisement
Continue Reading