Connect with us
Tesla Megapack Tesla Megapack

News

Tesla gets $133M Megapack deal to double Queensland battery size

Credit: Tesla

Published

on

Tesla has gained another Megapack contract in Australia, coming as the latest of the company’s commitments to build new energy storage sites and expand existing ones.

The contract will oversee the expansion of the recently finished Western Downs battery in Queensland, Australia, increase the energy storage site’s size to 540 MW / 1,080 MWh, as detailed in a report from Renew Economy. In total, Tesla will provide 140 Megapack units for the project, expected to be valued at about $133 million, while developers expect the second stage of the project to be operational by 2026.

The site is being operated by French renewables company Neoen, which signed a 10-year contract with AGL Energy, which is the country’s largest coal generator. The contract signs into place the addition of Megapack power from Tesla, and it will expand what is Queensland’s largest battery project—for now, at least.

Tesla Megapacks to help grow 560 MW/2,240MWh battery in Australia

“The ability to virtually charge and dispatch this battery increases the number of tools we can use to support our customers’ needs while also supporting electricity supply into the grid,” said AGL COO Markus Brokhof in a statement. “Virtual battery agreements provide flexibility within our firming portfolio without the requirement to build, operate, and maintain the physical battery.”

Advertisement

Neoen CEO Xavier Barbaro has also highlighted the company’s hand in several recent battery energy storage system (BESS) projects in Australia.

“Neoen is proud to have developed the ‘virtual battery’ offer in Australia, providing a bespoke, smart, value-added product that meets the increasing needs of our customers,” Barbaro said. “Over the past seven years, Neoen has been a leading player in storage in Australia and around the world, and we will continue to design and deliver integrated solutions to accelerate the energy transition.”

Neoen now has as much as 1,925 MW / 4,709 MWh of energy storage capacity either in operation or under construction in Australia.

Despite the Western Downs site currently being the Australian state’s largest battery project, an additional expansion at the state’s Stanwell battery is expected to increase the existing energy storage system to 300MW/1,200MWh to become the state’s biggest. That expansion also gained a $448.2 million investment from the state’s government, and it’s being constructed near a coal plant that’s slated to close.

Tesla also has a large number of other Megapack projects throughout Australia, including those in New South Wales, Victoria, Western Australia, and other states, still.

Advertisement

RELATED:

Tesla Lathrop Megafactory is all business with Megapack production as Q2 ends

What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send your tips to us at tips@teslarati.com.

Zach is a renewable energy reporter who has been covering electric vehicles since 2020. He grew up in Fremont, California, and he currently lives in Colorado. His work has appeared in the Chicago Tribune, KRON4 San Francisco, FOX31 Denver, InsideEVs, CleanTechnica, and many other publications. When he isn't covering Tesla or other EV companies, you can find him writing and performing music, drinking a good cup of coffee, or hanging out with his cats, Banks and Freddie. Reach out at zach@teslarati.com, find him on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Elon Musk

Elon Musk is setting high expectations for Tesla AI5 and AI6 chips

Musk confirmed this week that Tesla had just completed a design review for AI5.

Published

on

Tesla-Chips-HW3-1
Image used with permission for Teslarati. (Credit: Tom Cross)

Elon Musk is setting high expectations for Tesla’s in-house silicon program. As per Musk in a set of recent posts on X, Tesla’s AI5 and AI6 will be game-changing. 

Tesla’s AI5 and AI6 are incredibly important for Tesla’s future, which will likely be built on the back of very high-volume products like Optimus and the Cybercab.

Musk sets high expectations

Musk confirmed this week that Tesla had just completed a design review for AI5, which will initially be manufactured by TSMC in Taiwan before production ramps in Arizona. As per Musk, consolidating Tesla’s chip design efforts into one architecture has allowed the company to focus its silicon talent on delivering a single high-performance platform. 

“Just had a great design review today with the Tesla AI5 chip design team! This is going to be an epic chip. And AI6 to follow has a shot at being the best (by) AI chip by far. Switching from doing 2 chip architectures to 1 means all our silicon talent is focused on making 1 incredible chip. No-brainer in retrospect,” Musk wrote in his post.

In a follow-up post, the CEO also stated that the company’s upcoming AI5 chip “will probably be the best inference chip of any kind” for models below ~250 billion parameters, with the “lowest cost silicon and best performance per watt.” Musk added that AI6, which follows AI5, “has a shot at being the best AI chip by far.”

Advertisement

AI6 as Dojo’s successor

While AI5 is nearing production, Musk has also pointed to AI6 as Tesla’s next major target. The chip will be manufactured at Samsung’s upcoming Texas facility, part of a multibillion-dollar deal to support Tesla’s next-generation products such as the Cybercab and the Optimus humanoid robot. Musk also noted that AI6 could effectively replace Project Dojo as Tesla’s training platform, given its potential for both inference and training workloads.

Industry veterans have echoed this view, with former Apple and Rivian engineer Phil Beisel suggesting that “AI6 is now Dojo.” Musk appeared to agree, responding with a “bullseye” emoji. Musk has also noted on X that he would personally be walking the line in Samsung’s upcoming AI6 factory in Texas, to make sure that the facility’s output is accelerated according to Tesla’s requirements. 

Continue Reading

Elon Musk

Elon Musk: Neuralink could restore partial vision to the blind next year

The executive posted the update on social media platform X.

Published

on

Neuralink-Demo-Elon-Musk
Credit: Steve Jurvetson/Twitter

Elon Musk has suggested that Neuralink could attempt to restore limited sight to visually impaired patients as early as 2026. 

The executive posted the update on social media platform X amid news of Neuralink’s first successful Telepathy implants outside the United States. 

Blindsight trials

In a response to a post from Neuralink’s official X account about its first Canadian patients, Musk wrote that the company is “Aiming to restore (limited) sight to the completely blind next year.” The update was well-received on social media, as the device would most likely provide notable quality of life improvements to patients. Neuralink’s current implant, Telepathy, is already changing lives today, and the same will likely be true for Blindsight.

This was not the first time that Musk has provided an update to Neuralink’s Blindsight trials. Earlier this year, Musk told the Qatar Economic Forum that the first human implantation of Blindsight could occur early 2026, potentially in the United Arab Emirates. Neuralink has explored collaboration with the Cleveland Clinic Abu Dhabi to perform the initial surgery. Blindsight has also received a “breakthrough device” designation from the US FDA, hinting at the implant’s development.

Blindsight’s potential

Musk has previously described Blindsight as Neuralink’s brain-computer interface (BCI) designed to restore vision. During Neuralink’s 2022 Show & Tell event, Musk stated that Blindsight would target the brain’s visual cortex, bypassing damaged eyes entirely to generate visual perception. This means that vision could be restored even for people who were born blind. 

Advertisement

“The first two applications we’re going to aim for in humans are restoring vision, and I think this is notable in that even if someone has never had vision ever, like they were born blind, we believe we can still restore vision. The visual part of the cortex is still there. Even if they’ve never seen before, we’re confident they could see,” Musk said.

Continue Reading

News

Sweden Mediation Institute throws in the towel on Tesla vs IF Metall union conflict

After nearly two years, the union’s strike has become the country’s longest labor dispute to date.

Published

on

Credit: @NicklasNilsso14/X

Sweden’s Mediation Institute has formally ended its efforts to resolve the conflict between Tesla Sweden and trade union IF Metall. After nearly two years, the union’s strike has become the country’s longest labor dispute to date. 

Launched 677 days ago by the IF Metall union, the strike was intended to push Tesla Sweden into signing a collective agreement. Tesla Sweden, however, remained firm, maintaining that its working conditions are already better than union standards.

Mediation Institute withdraws

The state-run Mediation Institute, which had been involved early in the strike, confirmed this week that it was officially closing the case. The two parties have had several meetings, but neither side has been able to come to an agreement.

Director General Irene Wennemo described the effort as unprecedented in difficulty in a comment to Ekot. “We have tried in every possible way to get the parties to come closer to each other in a way that allows this conflict to end. But now we have come to the end of the road and have realized that it is just as good to end the case,” she told the Swedish outlet.

Union signals flexibility

The mediators noted in their final report that Tesla Sweden had limited authority in the talks, with key decisions appearing to rest with executives in the United States. The situation, they stated, created barriers to compromise that made the conflict “unlike anything else.” Tesla has maintained throughout that its Swedish workers already receive strong benefits and protections without the need for a formal collective agreement, as noted in a CarUp report.

Advertisement

IF Metall, for its part, has begun hinting that it was open to alternatives. This was highlighted by Union Chair Marie Nilsson, who noted that while the preferred outcome of the country’s longest strike in history is a signed agreement, “other alternative solutions” are now on the table. “You can do it in different ways. The easiest thing would be to sign a collective agreement. But when that is not possible, we have to find other alternative solutions as well, so we are open to discussion,” the union official stated.

Continue Reading

Trending