Connect with us

News

SpaceX launches 62nd orbital mission of the year

62nd orbital launch of the year for SpaceX (Credit Richard Angle)

Published

on

Last night at 10:47 p.m. ET (02:47 UTC), SpaceX launched 21 Starlink satellites to low Earth orbit, breaking their company record of 61 launches in a year.

The 62nd launch comes with four months still remaining in the year and plenty of launches still left on the schedule. SpaceX could approach the low 90s by year’s end. SpaceX is far ahead of any other launch provider when it comes to mass to orbit, mostly due to numerous Starlink launches.

Elon Musk has stated they want to launch 100 in a year, and the only thing that seems to stand in the way of that goal is vehicle and payload availability. SpaceX currently has 17 flight-proven Falcon 9 first-stage rockets in various stages of readiness. A few of those are assigned as Falcon Heavy side boosters.

Advertisement

Along with the 17 Falcon 9 rockets at the ready, there are multiple new Falcon 9s and Falcon Heavy center cores in progress as well, so vehicle availability should not pose a problem for the company.

As for the 21 Starlink satellites launched last night, they separated from the 2nd stage an hour and five minutes after lift-off, and they were inserted into a 43-degree orbital inclination.

This mission kicked off what could be another busy month for SpaceX, having just come off a nine-launch campaign in August. September could see up to eight launches, including the possibility of a Starship test launch. Starship still has work to do, but there are notices for a mid to late-month launch of the massive rocket.

Advertisement

After launching from Launch Complex 39A, Booster 1073 landed on the droneship “Just Read the Instructions,” completing its 10th mission to space and back. It was also the 149th successful Falcon recovery in a row.

The next launch for SpaceX will be another Starlink mission from Florida, currently scheduled for NET September 8th.

With SpaceX breaking their launch record and four more months left in the year, how many do you think they could achieve for 2023? The sky isn’t the limit anymore.

Questions or comments? Shoot me an email at rangle@teslarati.com, or Tweet me @RDAnglePhoto.

Advertisement

Launch journalist, specializing in launch photography. Based on the Space Coast, a short drive from Cape Canaveral and the SpaceX launch pads.

Advertisement
Comments

News

Tesla loses Model Y program manager in second blow in single day

Published

on

Credit: Tesla Manufacturing

Tesla has lost its Model Y Program Manager, he announced on LinkedIn, marking the second major departure from the company today.

Emmanuel Lamacchia has been in the role for 4 years and 7 months, responsible for the rollout of the all-electric crossover in several markets.

The Model Y became the best-selling vehicle in the world for two years under Lamacchia’s watch, making this a huge loss for the company. However, it seems the decision was made under Lamacchia’s own initiative.

He confirmed his decision on LinkedIn:

“After 8 incredible years, I’m moving on from Tesla.

Advertisement

What a journey it’s been… from leading NPI for Model 3 and Model Y variants to becoming the Vehicle Program Manager for Model Y, the best-selling car in the world!

Leading the All-New Model Y launch was the highlight: converting all 4 factories across 3 continents in just 2 weeks. Something that had never been done before in the auto industry.

To the teams who made this possible: you should be incredibly proud. This achievement belongs to you: the engineers, designers, buyers, and associates in Fremont, Shanghai, Berlin, and Austin who turned an impossible timeline into reality.

Grateful to the leaders who trusted me with programs that stretched my capabilities and to the cross-functional partners who showed me that great solutions come from collaboration, not hierarchy.

Tesla taught me how to move fast without breaking things and how to scale from prototypes to millions of units.

Advertisement

Excited for what’s next. More to share soon.”

It marks the second major program loss for Tesla today, as it also bid farewell to Cybertruck and Model 3 Program Manager Siddhant Awasthi, who said he left voluntarily in “one of the hardest decisions of his life.”

Tesla Cybertruck and Model 3 program manager steps down

Lamacchia was at Tesla for just a shade under eight years, and previously worked for Rolls-Royce for roughly the same amount of time.

After the loss of both Lamacchia and Awasthi today, Tesla has lost a handful of key executives in 2025, including:

Advertisement
  • David Imai, Director of Design
  • David Lau, VP of Software Engineering
  • Mark Westfall, Head of Mechanical Engineering
  • Prashant Menon, Regional Director in India
  • Vineet Mehta, Head of Battery Architecture
  • Omead Afshar, VP/Head of Sales and Manufacturing in North America
  • Milan Kovac, Head of Optimus Team
  • Jenna Ferrua, Director of HR
  • Troy Jones, VP of Sales, Service, and Delivery
  • Pete Bannon, VP of Hardware Engineering
  • Piero Landolfi, Director of Service
Continue Reading

News

Tesla prepares to expand Giga Texas with new Optimus production plant

Drone operator Joe Tegtmeyer recognized Tesla construction crews performing ground leveling and clearing efforts at the plant earlier today.

Published

on

Credit: Tesla Optimus | X

Tesla is preparing to expand Gigafactory Texas once again with a brand new facility that will house the eventual manufacturing efforts for Optimus, its humanoid robot.

It is already building some units on a Pilot line at the Fremont Factory in Northern California, but Tesla is planning to build the vast majority of its Optimus project at Gigafactory Texas.

Tesla Optimus gets its latest job, and it’s not in the company’s factories

It will build one million units per year in Fremont, but CEO Elon Musk said the company would build 10 million units every year in Texas at a new building at Giga Texas.

Musk said:

Advertisement

“I think there could be tens of billions of Optimus robots out there. Um, now obviously it’s very important we pay close attention to safety here. Then a 10 million unit uh per year production line here the I don’t know where we’re going to put the 100 million unit production line. on Mars. Maybe on Mars, I don’t know.”

Evidently, Tesla is ready to begin thinking about the production efforts of Optimus beyond a theoretical standpoint and is starting to prepare for the construction of the manufacturing plant on Giga Texas property.

Drone operator Joe Tegtmeyer recognized Tesla construction crews performing ground leveling and clearing efforts at the plant earlier today:

Production is still slated for 2027, at least at Gigafactory Texas. As previously mentioned, the company is building some units in Fremont for the time being, at least until subsequent versions of the Optimus project advance.

Tesla has done a great job of advancing Optimus forward, but it also has truly grand expectations for the project.

Musk said it could potentially be the biggest product in the history of the planet, as it will revolutionize the way humans perform tasks, probably eliminating monotonous tasks from everyday life.

Advertisement
Continue Reading

News

Tesla reveals its first Semi customer after launch

Published

on

Credit: Tesla

Tesla revealed its first customer for the all-electric Semi truck after it launches next year. Who it truly is should not be a surprise.

The Semi is going to finally start deliveries to new companies outside of Tesla’s pilot program starting in 2026. The company has been building a dedicated production facility in Reno, Nevada, that has finally taken shape, but Tesla was evidently not finished with the Semi’s development.

Tesla shares rare peek at Semi factory’s interior

Last week at the Annual Shareholder Meeting, Tesla said it had implemented some new designs into the Semi, helping with efficiency, updating its design, and making it a more suitable vehicle for hauling loads, as the changes also helped increase payload.

Tesla has obtained a lengthy list of companies that have committed to implementing the Semi in their own fleets, hoping to bring their logistics lineups up to date with electric powertrains and autonomous technologies.

Advertisement

While it is already operating a pilot program with PepsiCo. and Frito-Lay, Tesla will expand to other businesses, primarily using it internally after its launch.

Head of the Semi program at Tesla, Dan Priestley, said the company would be the first user of the vehicle after its launch next year. It has been using it to a certain extent, but the company has not been able to completely abandon gas haulers.

Instead, it will implement the Semi into its fleet for more sustainable vehicle logistics starting next year:

Advertisement

Tesla has already received orders for the Semi from a variety of large companies, including Walmart, Sysco, Anheuser-Busch, UPS, DHL, J.B. Hunt, among others.

Many analysts see the Tesla Semi as a major contributor to future growth and increasing value within the company, especially from a Wall Street perspective. Some firms say the Semi is one of several near and medium-term contributors to the company increasing its market cap.

Cantor Fitzgerald is just one of those firms, as last week it explicitly listed the Semi as a catalyst.

Analyst Andres Sheppard said, “Overall, we remain bullish on TSLA over the medium to long term. We continue to see meaningful future upside from Energy Storage & Deployment, FSD, Robotaxis/Cybercab, Semis, and Optimus Bots.”

Advertisement
Continue Reading

Trending