Connect with us

News

Starlink surpasses 4 million customers worldwide

Published

on

SpaceX recently celebrated Starlink, surpassing 4 million customers worldwide in over 100 countries. 

Starlink has achieved many milestones in the past year or two. SpaceX’s President and Chief Operations Officer Gwynn Shotwell recently shared Starlink’s progress during a hearing at the Texas House of Representatives.

Starlink Terminal Factory in Bastrop, TX

“We also have Starlink[’s] user terminal factory in Bastrop Texas—almost a million square feet and we’re expanding now…This week– by the way–we will pass 4 million customers for Starlink, which is quite exciting,” said Shotwell. 

Shotwell added that SpaceX plans to produce printed circuit boards in its Starlink Bastrop facility. It aims to compete with Taiwan and other Southeast Asian countries in the printed circuit board market. 

“Bastrop will be the largest printed circuit board manufacturing facility in the entire United States. And I’m pretty sure we’ll be able to beat Southeast Asia in efficiency of producing those printed circuit boards.”

Advertisement

Starlink Cellular

The SpaceX COO also informed the Texas House of Representatives that the company hopes to launch around 100 missions to put more Starlink satellites in orbit. SpaceX is preparing to launch Starlink Direct-to-Cell—aka Starlink Cellular—with partner T-Mobile. 

In a recent interview with Jim Cramer, T-Mobile CEO Mike Sievert estimated that Starlink Cellular beta could launch between late 2024 and early 2025. Sievert stated that SpaceX has 192 cellular satellites in orbit at the moment. Starlink Cellular reportedly needs around 300 cellular satellites to offer services in the United States. Based on Shotwell’s comments, it will take about 100 missions to reach the required number of cellular satellites to launch Starlink Direct-to-Cell. 

If you have any tips, contact me at maria@teslarati.com or via X @Writer_0100110.

Maria--aka "M"-- is an experienced writer and book editor. She's written about several topics including health, tech, and politics. As a book editor, she's worked with authors who write Sci-Fi, Romance, and Dark Fantasy. M loves hearing from TESLARATI readers. If you have any tips or article ideas, contact her at maria@teslarati.com or via X, @Writer_01001101.

News

Tesla Robotaxi test units spotted in new region ahead of launch

These validation units are used to gain additional data for Tesla’s internal use, or even potentially for regulatory purposes that the company can share with agencies that will eventually grant a license to operate Robotaxi in the state.

Published

on

Credit: @MWraps30584 | X

Tesla Robotaxi test units are being spotted in various new regions ahead of their launch in new states. Tesla is aiming to launch in at least a few new states in the coming months as it is ramping up hiring for the Robotaxi program and aiming to expand its ride-hailing service.

Already active in Austin, Texas, and the California Bay Area, Tesla is looking to expand its Robotaxi operations to new states. It’s had its eyes set on Nevada, Florida, and Arizona, which have seemed to have the most movement of the three prospects over the past month or so.

That trend is continuing.

Earlier this month, we reported on two Robotaxi units spotted testing with LiDAR rigs for ground truth validation in Gilbert, Arizona. Noted Cybertruck owner and enthusiast Greggertruck spotted the two units traveling on a highway.

Tesla Robotaxi testing in Arizona is ramping up quickly

Now, those same two units, or at least they appear to be, were spotted in Scottsdale, which is also a suburb of Phoenix, like Gilbert is, with the same LiDAR rigs:

These validation units are used to gain additional data for Tesla’s internal use, or even potentially for regulatory purposes that the company can share with agencies that will eventually grant a license to operate Robotaxi in the state.

Tesla is not a company that utilizes LiDAR for its everyday self-driving efforts, as it has utilized only cameras for the past several years.

Tesla Vision, as the company calls it, is what CEO Elon Musk feels is needed to achieve a fully autonomous network of vehicles, which will eventually need zero supervision for passenger transportation.

LiDAR is utilized by other companies, like Waymo, but Tesla has maintained that it is not necessary for several years. Musk has called it a “crutch” for achieving the proper self-driving tech, and the company only uses it for an additional bit of data.

Tesla has been operating its Robotaxi service in Austin since late June, and it has expanded its service area in the city to nearly 300 square miles, with its most recent expansion occurring earlier this week.

Continue Reading

Elon Musk

Tesla’s popular side business is going to get bigger, Elon Musk says

It took several years to get the Diner developed, built, and opened. On July 21, Tesla launched the Diner to the public at 4:20 p.m. local time (of course), after years of development. Musk first offered the idea of a drive-in Supercharger Diner back in December 2018.

Published

on

tesla diner in los angeles during daytime
Credit: Matt Hartman

Tesla will open two new Diner locations in the United States after its first location in Los Angeles has been a raging success, as it is constantly packed and serving food for 24 hours a day, every day.

Tesla CEO Elon Musk said that the initial Diner location on Santa Monica Boulevard is “going well,” and based on reviews and its constant out-the-door lines, it is safe to say it has been a major outlet of interest for people in the area.

It features two massive movie screens, a menu that is locally sourced and has been created by a world-class chef, and Supercharging for EVs. It truly is the perfect stop for those who are hungry, need entertainment, or need a quick charge.

tesla diner

Credit: Tesla

So far, Tesla has not released too many details on the success of the restaurant, but it did state in a graphic for its Q3 Supercharging stats that it sold roughly 50,000 burgers at the Diner in Q3, roughly 715 each day. Burgers are not the only thing on the menu, either.

With how well it has gone, Musk is now considering the possibility of new locations that are notable to Tesla, including Austin and Palo Alto.

On Friday, Musk revealed he believes it “probably makes sense to open one” near Gigafactory Texas and Engineering HQ in Palo Alto:”

It took several years to get the Diner developed, built, and opened. On July 21, Tesla launched the Diner to the public at 4:20 p.m. local time (of course), after years of development. Musk first offered the idea of a drive-in Supercharger Diner back in December 2018.

By 2023, Tesla had secured building permits and broken ground on the site in September of that year.

Since its launch, it has been a popular hotspot for Tesla fans and others to visit, although it has attracted unwanted attention from protestors as well.

They look hungry. If they walked inside and ordered some food, maybe they’d stop yelling into microphones and threatening Musk.

Continue Reading

Elon Musk

Elon Musk’s AI empire grows as xAI leases Palo Alto space near Tesla

The expanding footprint of Elon Musk’s companies in Palo Alto bodes well for the CEO’s plans in the area.

Published

on

Credit: xAI/X

Elon Musk’s artificial intelligence startup, xAI, is expanding its Silicon Valley footprint, leasing roughly 105,000 square feet of office space at Palo Alto’s Page Mill Center, just blocks away from Tesla’s engineering complex.

Musk’s deepening Silicon Valley footprint

People familiar with the matter have informed the San Francisco Business Times that xAI’s lease at Page Mill Center may already have been finalized, adding to the company’s existing headquarters at 1450 Page Mill Road. The two offices share a parking lot, reflecting Musk’s strategy of consolidating his ventures. Tesla’s engineering hub is also just a few blocks away.

The new offices form a growing cluster of Musk-led companies in the heart of the Valley and come as xAI has listed over 250 job openings. These include listings for engineers, designers, and technical staff, among others. 

xAI’s aggressive hiring push hints at rapid scaling, which makes quite a lot of sense considering the company’s ambitious projects. xAI oversees the large language model Grok and other AI initiatives such as the newly launched Grokipedia, and the startup has also acquired the social media platform X. Real estate owner Hudson Pacific Properties, the owners of Page Mill Center, have so far declined to comment.

AI demand and Silicon Valley’s office rebound

Silicon Valley’s office market, long subdued by remote work trends, is seeing renewed activity from AI firms. Hudson Pacific told investors this summer that tenant demand has reached a three-year high, with over half of new leases driven by artificial intelligence companies. Vacancy rates have now fallen for four straight quarters to 16.6% as well, CBRE reported.

Advertisement

The expanding footprint of Elon Musk’s companies in Palo Alto bodes well for the CEO’s plans in the area. Musk, after all, has previously butted heads with officials, resulting in his two biggest ventures, electric vehicle maker Tesla and private space company SpaceX, officially relocating their headquarters to Texas.

Continue Reading

Trending