SpaceX
T-Mobile cuts Starlink Cellular service price, eyes broader access
T-Mobile cut the price of its Starlink cellular service to $10 per month as it gears up for a July launch and aims to broaden access. The carrier also seeks FCC approval to extend Starlink cellular service to legacy devices, citing life-saving potential.
“After gauging the incredible response from customers—including broader than expected interest from competitor’s customers—we’ve set our final launch pricing for T-Satellite at just $10 a month,” T-Mobile CEO Mike Sievert said during a Thursday earnings call.
The $10 price applies to T-Mobile, AT&T, and Verizon customers. Non-T-Mobile users can access the service via a downloadable eSIM. “This gen one pricing will be good for at least a year,” Sievert added.
Initially, T-Mobile announced during a Super Bowl ad that the Starlink beta service would be free for its highest-tier plan until year-end. Other T-Mobile users would pay $15 monthly, while customers from other carriers would be charged $20.
An early adopter discount briefly offered T-Mobile users a $10 rate. The new universal $10 pricing reflects T-Mobile’s aggressive push to outpace AT&T and Verizon, which are developing satellite services with partners like AST SpaceMobile.
Starlink Cellular service, powered by over 560 satellites, functions as an orbiting cell tower, enabling text-based messaging in rural and remote areas. Data downloads and voice calls may follow later this year.
T-Mobile’s filing with the Federal Communications Commission requests expanded access for legacy devices, arguing that current rules limiting service to newer phones exclude many users. The carrier emphasized that broader access could enhance connectivity in critical situations.
T-Mobile’s price cut and FCC push signal a strategic effort to dominate the satellite connectivity market. By leveraging SpaceX’s Starlink constellation, the carrier aims to deliver affordable, widespread service while addressing regulatory hurdles. The move could reshape how rural users access mobile networks, especially as competitors ramp up their satellite offerings. With the July launch approaching, T-Mobile’s focus on affordability and inclusivity positions it as a key player in the evolving satellite communication landscape.
Elon Musk
SpaceX’s Starship V3 is almost ready and it will change space travel forever
SpaceX is targeting April for the debut test launch of Starship V3 “Version 3”
SpaceX is closing in on one of the most anticipated rocket launches in history, as the company readies for a planned April test launch and debut of its next-gen Starship V3 “Version 3”.
The latest iteration of Starship V3 has a slightly taller Super Heavy booster and Starship upper stage than their predecessors, and produce stronger, more efficient thrust using SpaceX’s upgraded Raptor 3 engines. V3 also features increased propellant capacity, targeting a total payload capacity of 200 tons to low Earth orbit with full reusability, compared to around 35 tons for its predecessor. With Musk’s lifelong aspiration to colonize Mars one day, the increased payload capacity matters enormously, because Mars missions require moving massive amounts of cargo, fuel, and eventually, people. But the most critical upgrade may be orbital refueling. SpaceX’s entire deep space architecture depends on moving large amounts of propellant in space, and having orbital refueling capabilities turn Starship from just a rocket into a true transport system. Without it, neither the Moon nor Mars is reachable at scale.
Initial Super Heavy V3 and Starbase Pad 2 activation campaign complete, wrapping up several days of testing that loaded cryogenic fuel and oxidizer on a V3 vehicle for the first time. While the 10-engine static fire ended early due to a ground-side issue, we saw successful… pic.twitter.com/uHGji17srv
— SpaceX (@SpaceX) March 18, 2026
A fully reusable Starship and Super Heavy, SpaceX aims to drive marginal launch costs down and at a tenfold reduction compared to current market leaders. To put that in perspective, getting a kilogram of cargo to orbit today costs thousands of dollars. Bring that number down far enough and space stops being an exclusive domain. That price point unlocks mass deployment of satellite constellations, large-scale science payloads, and affordable human transport beyond Earth orbit. It also means the Moon stops being a destination we visit and starts being one we inhabit.
NASA expects Starship to take off for the Moon’s South Pole in 2028, with the ultimate goal of establishing a permanently crewed science station there. A successful V3 flight this spring keeps that timeline alive. As for Mars, Musk has shifted focus toward building a self-sustaining city on the Moon first, arguing that the Moon can be reached approximately every 10 days versus Mars’s 26-month alignment window. Mars remains the horizon, but the Moon is the proving ground.
Elon Musk hasn’t been shy with hyping the upcoming Starship V3 launch. In a social media post on Wednesday, he confirmed the first V3 flight is getting closer to launch. SpaceX also announced its initial activation campaign for V3 and Starbase Pad 2 was complete, wrapping up several days of cryogenic fuel testing on a V3 vehicle for the first time. The countdown is on. April can’t come soon enough.
Elon Musk
FCC chair criticizes Amazon over opposition to SpaceX satellite plan
Carr made the remarks in a post on social media platform X.
U.S. Federal Communications Commission (FCC) Chairman Brendan Carr criticized Amazon after the company opposed SpaceX’s proposal to launch a large satellite constellation that could function as an orbital data center network.
Carr made the remarks in a post on social media platform X.
Amazon recently urged the FCC to reject SpaceX’s application to deploy a constellation of up to 1 million low Earth orbit satellites that could serve as artificial intelligence data centers in space.
The company described the proposal as a “lofty ambition rather than a real plan,” arguing that SpaceX had not provided sufficient details about how the system would operate.
Carr responded by pointing to Amazon’s own satellite deployment progress.
“Amazon should focus on the fact that it will fall roughly 1,000 satellites short of meeting its upcoming deployment milestone, rather than spending their time and resources filing petitions against companies that are putting thousands of satellites in orbit,” Carr wrote on X.
Amazon has declined to comment on the statement.
Amazon has been working to deploy its Project Kuiper satellite network, which is intended to compete with SpaceX’s Starlink service. The company has invested more than $10 billion in the program and has launched more than 200 satellites since April of last year.
Amazon has also asked the FCC for a 24-month extension, until July 2028, to meet a requirement to deploy roughly 1,600 satellites by July 2026, as noted in a CNBC report.
SpaceX’s Starlink network currently has nearly 10,000 satellites in orbit and serves roughly 10 million customers. The FCC has also authorized SpaceX to deploy 7,500 additional satellites as the company continues expanding its global satellite internet network.
Elon Musk
NASA watchdog says Starship development delays could affect Artemis timeline
The report noted that several technical milestones still need to be completed before Starship can serve as a crewed lunar lander.
A NASA watchdog report stated that continued development work on SpaceX’s Starship could affect the timeline for the agency’s planned Artemis moon missions. The report noted that several technical milestones still need to be completed before the spacecraft can serve as a crewed lunar lander.
The findings were detailed in a report from NASA’s Office of Inspector General, as noted in a report from Reuters.
NASA selected SpaceX’s Starship in 2021 to serve as the Human Landing System (HLS) for its Artemis lunar program. The vehicle is intended to transport astronauts from lunar orbit to the surface of the Moon and back as part of future Artemis missions.
According to the watchdog report, Starship’s development has experienced roughly two years of schedule delays compared to earlier expectations. Still, NASA is targeting 2028 for the first crewed lunar landing using the Starship lander.
One of the most significant technical milestones for Starship’s lunar missions is in-space refueling.
To support a crewed lunar landing, multiple Starship launches will be required to deliver propellant to orbit. Tanker versions of Starship will transfer fuel to a storage depot spacecraft, which will then refuel the lunar lander.
The report noted that this approach could require more than 10 Starship launches to fully refuel the spacecraft needed for a single lunar landing mission.
NASA officials indicated that demonstrating cryogenic propellant transfer in orbit remains one of the most important technical steps before Starship can be certified for lunar missions.
SpaceX has conducted 11 Starship test flights since 2023 as the company continues developing the fully reusable launch system. A 12th test flight, this time featuring Starship V3, is expected to be held in early April.