Connect with us

Investor's Corner

Tesla (TSLA) shakes off latest skepticism from Wall St as end-of-Q2 approaches

A snapshot from a drone flyover of the Tesla Fremont factory on June 29, 2018. [Credit: DarkSoldier 360/YouTube]

Published

on

Tesla shares (NASDAQ:TSLA) are proving quite resilient amidst a new round of skepticism from Wall Street. Just recently, Credit Suisse initiated coverage of Tesla, giving the electric car maker an “underperform” rating over what the firm believed would be the company’s difficulties when veteran automakers like Volkswagen enter the electric vehicle market.

Credit Suisse analyst Dan Levy started his TSLA coverage with a $189 price target for the company, which is about 15% lower than the stock’s closing price on Wednesday. Levy noted that his “underperform” rating is based on the argument that TSLA stock does not reflect key profit risks at its current levels. The analyst added that while Tesla is indeed leading in areas like electrification and software that will “define the future of carmaking,” it is likely to “settle as niche carmaker” amidst the arrival of more experienced competitors.

The Credit Suisse analyst noted that Volkswagen is the very definition of an industry incumbent, being around in the market for a very long time. The company also sold over 40 times Tesla’s volume in 2018, showing the vast gap between the two companies. With these in mind, Levy stated that Tesla is a “small newcomer to an industry which has historically had extremely high barriers to entry.”

“To best understand Tesla’s prospects in its push for electric vehicles (EV) proliferation, we believe it’s worthwhile to compare it to an auto industry incumbent – most appropriately Volkswagen (VW)… With both Tesla and VW committed to EV proliferation, the Tesla vs. VW debate could be relevant for the next decade or more. Both automakers are treating the long-term industry shift to vehicle electrification as an existential matter. Yet they are coming from vastly different positions… Tesla currently leads in areas that will likely define the future of carmaking. Yet it faces risks ahead – reflected in our below-consensus estimates. And despite growth ahead, we believe Tesla is likely to settle as a niche automaker,” Levy wrote.

Quite interestingly, Credit Suisse also initiated coverage on two American automakers: Ford and GM. Both veteran companies received an “outperform” rating from the analyst, describing Ford as a company showing “early signs of improvement with more to come” and GM as “one of the best players in our coverage.” For his part, Levy noted that despite his “underperform” rating on TSLA and the myriad challenges facing the company, Tesla “deserves due credit.”

Tesla is currently conducting its end-of-quarter push, delivering as many vehicles to customers before the end of June. A recently-leaked email from Elon Musk has also indicated that the company is “on track” to set records this quarter, but the company needs to “go all out” in order to complete vehicle deliveries.

Advertisement
-

As of writing, Tesla stock is trading +0.11% at $219.51 per share.

Disclosure: I have no ownership in shares of TSLA and have no plans to initiate any positions within 72 hours.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Why automakers keep turning down Elon Musk’s Tesla Full Self-Driving offer

Elon Musk confirms no automaker has ever accepted Tesla’s offer to license Full Self-Driving software.

Published

on

By

Elon Musk gave a brief answer on X Monday that confirmed that Tesla’s standing offer to license Full Self-Driving to other automakers still has zero takers. Sawyer Merritt wrote that “Tesla has for years openly invited other automakers to license FSD. None of them have accepted,” responding to a prediction from Boom Supersonic founder Blake Scholl that Tesla would eventually open FSD the way it opened its Supercharger network to rival brands. Musk’s reply to Merritt was one word: “Exactly.”

It is not the first time Musk has made this point. He said something similar in November, when he called legacy automakers reluctance to adopt FSD “crazy,” and Tesla has floated the offer publicly since at least 2021. Scholl’s prediction touches on something real. Once NACS became the de facto charging standard, adoption from Ford, GM, Rivian and others followed within about a year. FSD licensing was supposed to work the same way once Tesla built enough of a lead that switching made sense for everyone.

The case for licensing now is stronger than it was two years ago. Waymo and Zoox are logging hundreds of thousands of unsupervised autonomous miles, along with Tesla’s own Robotaxi fleet. Every automaker still selling driver assist systems that lag FSD has given the robotaxi conversation to Tesla, Waymo and Zoox by default. Licensing FSD would let a GM or a Ford compete on the same field without spending a decade and billions of dollars building a stack from scratch, the same argument Tesla made when it opened the Supercharger network to bring more EVs onto its chargers.

But FSD is not a connector standard. As one reply to Musk’s post pointed out, licensing FSD is not a software license the way NACS was a plug spec. It requires adopting Tesla’s eight camera layout and its onboard compute architecture, meaning a licensee’s cars would effectively become Tesla hardware wearing someone else’s badge. That is the visible obstacle. The less visible one is data. A licensed FSD stack would report back the same telemetry Tesla collects from its own fleet, giving Tesla a continuous read on how a competitor’s cars are actually driven, where they struggle, and how often drivers intervene. For an automaker trying to build its own autonomy program, or simply trying to keep its build quality and safety record private, handing Tesla that visibility could be a bigger cost than the hardware bill. It is the reason the Supercharger comparison only goes so far. Opening a charging plug cost Tesla very little. Opening FSD would cost a rival something it cannot get back.

Continue Reading

Elon Musk

Tesla eyes supply partners for Optimus mass production

Tesla certified three Chinese suppliers for Optimus mass production, signaling its robot timeline is accelerating.

Published

on

By

Concept rendering of Tesla Optimus in mass production

Tesla’s robotics team traveled to Ningbo, in China’s Zhejiang province, on September 16 and spent the following day auditing component suppliers for Optimus, according to a Bloomberg report cited by RobotAIGeek. The visit moved three manufacturers from provisional status to certified mass production partners: Tuopu Group, which handles actuators and chassis components, Ningbo Joyson Electronic, a sensor supplier, and Zhejiang Sanhua Intelligent Controls, which builds thermal management systems. All three already supply parts to Tesla’s electric vehicles, and the audit reportedly came with fresh orders that supply chain reports put at an initial batch of roughly 5,000 units.

Tuopu, Joyson, and Sanhua built their manufacturing base serving the automotive industry, where tolerances and volume requirements are already close to what a mass produced humanoid robot demands. Sanhua in particular has history here. Teslarati reported last October that the company had received a roughly $685 million order for linear actuators tied to Optimus, a volume industry watchers estimated could cover around 180,000 robots once production ramped.

Supply chain reports tied to this week’s audit put Tesla’s near term production goal at about 1,000 Optimus units a week by late September, rising to 2,000 to 2,500 units a week by the end of the year. That pace would put real weight behind the timeline Tesla has been building toward since May, when it wound down Model S and Model X production at Fremont to convert that floor space into a dedicated Optimus line targeting one million units annually. JPMorgan analysts who toured the factory in August confirmed the conversion took roughly four months, a pace Musk has called unprecedented for a facility that size.

New drone video shows Tesla’s Optimus Factory reaching a turning point

Fremont is only the first phase. A second, larger Optimus plant is rising at Gigafactory Texas, where drone footage shared by Joe Tegtmeyer last week showed the structural steel nearing completion on the north end of the building. Tesla has said that facility is meant to eventually support production of up to 10 million units a year, though volume output there is not expected before 2027.

Commercial sales of Optimus are still targeted for the second half of 2027, but production is expected to start well before then. JPMorgan analyst Rajat Gupta has said Tesla’s “Optimus Academy” program, which uses early units to collect real world training data inside Tesla’s own facilities, is expected to be running later this year. Bloomberg Intelligence analyst Ian Ma described the Ningbo audits as “a positive commercialization signal for China’s humanoid supply chain,” noting that sentiment could improve further if the visit leads to confirmed supplier nominations and larger orders. The Solactive China Humanoid Robotics Index rose about 1.4% on the news, though it remains down roughly 30% for the year.

Continue Reading

Investor's Corner

New drone video shows Tesla’s Optimus Factory reaching a turning point

New drone footage shows Tesla’s dedicated Optimus factory steel frame nearing completion at Giga Texas.

Published

on

By

Tesla’s dedicated Optimus factory at Gigafactory Texas is closing in on a finished steel frame, according to drone footage posted Thursday afternoon by longtime site observer Joe Tegtmeyer. In the video, Tegtmeyer said structural steel assembly is now about five column grids away from reaching the building’s north perimeter beam, putting the primary skeleton in its final stretch roughly six months after Tesla broke ground on the North Campus site in late March.

Tegtmeyer’s footage shows concrete already going in on three upper floors while crews continue laying rebar and pouring grade beam footings at ground level. That kind of parallel work, steel rising at one end of the site while concrete sets at the other, is a scheduling approach Tesla used at the original Giga Texas building and appears to be repeating here to save time before the plant’s targeted 2027 production start.

Teslarati has tracked the building’s progress since Tesla confirmed construction was officially underway in May, when the first steel structure went up on what was then bare, reclaimed land. The facility is part of a more than 5.2 million square foot expansion of Giga Texas’s North Campus that Tesla has said will eventually run nearly the length of the existing vehicle factory, over 4,000 feet, while sitting somewhat narrower. Musk has pegged the long term output target at 10 million Optimus units a year once the line is running at full capacity, a volume that would dwarf the one million unit pilot line Tesla is standing up separately at its Fremont, California factory.

Tesla Giga Texas to feature massive Optimus V4 production line

The Texas facility sits alongside another major buildout on the same campus. Terafab, the joint Tesla and SpaceX chip fabrication plant that will eventually supply the silicon running Optimus units in the field. Housing robot assembly and chip production on the same grounds is a deliberate supply chain decision, cutting down on the shipping and lead time that would otherwise sit between the two.

Tesla has not given an updated timeline beyond its previously stated goal of bringing high volume Optimus production online at the site in the summer of 2027. Fremont’s smaller pilot line began mass producing the current Gen 3 robot in January, with that plant expected to build tens of thousands of units this year primarily to generate the real world data Tesla needs to refine the robot’s software before Giga Texas ramps up. Six months of visible construction progress, tracked almost entirely through Tegtmeyer’s recurring drone flights, gives the clearest outside look yet at how seriously Tesla is treating that 2027 deadline.

Continue Reading