News
The Boring Company’s San Antonio project not a high priority: “I don’t know what it accomplishes”
San Antonio Mayor Ron Nirenberg doesn’t see the need for a Boring Company tunnel in his city. Mayor Nirenberg is focused on developing his transportation initiative, called ConnectSA, which he launched in April 2018.
“We have a lot of transportation priorities. We need multimodal connectivity. I don’t see where a tunnel project fits into that. I don’t know what it accomplishes,” Mayor Nirenberg told the San Antonio Business Journal.
The Alamo RMA’s Opinions
Others may have a different opinion of The Boring Company’s (TBC) tunnels than Nirenberg. In March, the Alamo Regional Mobility Authority (RMA) started negotiations with The Boring Company on a project for twin underground tunnels.
Using the twin tunnels, Tesla vehicles could pass between the San Antonio International Airport and downtown. TBC estimated the San Antonio Loop project would cost upwards of $250 million.
A month after negotiations started, the Alamo RMA’s Board Chair Mike Lynd revealed the viability of a TBC tunneling project in San Antonio. Lynd also noted that the tunnels would be beneficial to the area.
“I think it’s very real. I think this is something that has a chance to be a game-changer for San Antonio. This is a project that fixes congestion, increases mobility, and produces a revenue stream. It extends the useful life of our existing infrastructure,” said Lynd.
Nonprofits Concerns for Endangered Species
Two nonprofits opposed The Boring Company’s plans for a San Antonio tunneling project. In a letter dated April 18, the Texas Cave Management Association (TCMA) and the Texas Speleological Survey shared their “major concerns” about the potential TBC tunnels with the Alamo RMA.
The two nonprofit organizations believed that tunneling northeast of downtown San Antonio would damage areas home to springs and endangered species.
“Out of the million and on places to build a tunnel, they had to pick the worst,” TCMA President Jim Kennedy said in an interview with the San Antonio Express-News. “There’s a whole bunch of places you could put a tunnel around San Antonio without gong through this specific area. There’s all kind of Red flags.”
Nirenburg’s Focus
As for Nirenburg, he’s more focused on gaining support from Washington, D.C. for his ConnectSA initiative, which is currently concentrating on the VIA Advanced Rapid Transit (ART). In February 2022, ART received a favorable rating from the Federal Transit Administration, a critical step toward gaining access to federal funds.
ART could be eligible to receive $158 million in federal funding since President Biden included the project on his funding recommendation list for fiscal 2023. Congress must approve funding before ART receives it. The project will establish a 12-mile route between the San Antonio International Airport to downtown and further south. Electric buses will shuttle passengers along the route. ART may expand to include an East-West route as well.
The Teslarati team would appreciate hearing from you. If you have any tips, reach out to me at maria@teslarati.com or via Twitter @Writer_01001101.
News
Tesla readies its autonomous Cybercab and Robotaxi cleaning service
A Texas permit just confirmed Tesla’s cleaning robot is coming to service its Cybercab and Robotaxi fleet.
A routine Texas building permit may have quietly confirmed that Tesla’s robot vacuum and autonomous cleaning bot for the Robotaxi and Cybercab is coming. A state filing with the Texas Department of Licensing and Regulation, as first discovered by Tesla enthusiast Spencer and posted to X, that project number TABS2025022006, lists the scope of work at Tesla’s Austin Robotaxi hub at 5900 E Ben White Blvd to include a “Cleaning Robot” alongside Supercharger cabinets and an Equipment Inspection System.
Tesla first showed the cleaning robot publicly on January 31, 2025, posting a short video on X with the caption “This robot sucks,” showing a large robotic arm inside a Cybercab cabin switching between attachments to vacuum debris, pick up trash, and wipe down surfaces.
The operational case for this hardware comes down to mathematics. A robotaxi running rides across Austin needs to cycle passengers continuously to generate revenue. Every minute a vehicle sits waiting for a human cleaning crew is a minute it is not earning. A robotic arm that can fully clean a Cybercab cabin between rides in under two minutes removes one of the key bottlenecks in fleet utilization that no autonomous vehicle company has yet solved at scale.
This robot sucks pic.twitter.com/VUmGfCM5B3
— Tesla (@Tesla) January 31, 2025
The 5900 E Ben White Blvd address sits roughly 12 miles southwest of Gigafactory Texas, where Tesla has been mass producing its Cybercab. The Ben White facility is expected to functions as Tesla’s Austin Robotaxi Hub, the physical base of operations where fleet vehicles return between rides to charge, get cleaned, and undergo inspection before being dispatched again – and all autonomously. One can imagine a Cybercab dropping off a passenger, routes itself back to Ben White, pulls into the cleaning station, charges on one of the Supercharger cabinets listed in the same permit, passes the equipment inspection system, and returns to service, all without a human making a single decision.
The sighting activity around both locations has accelerated in parallel with production. By mid-March 2026, Cybercabs were spotted regularly on public roads across Austin and Silicon Valley. Tesla’s Robotaxi operations in Texas has expanded to cover the entire Austin metro area and has spread to Dallas, while autonomous Cybercab employee shuttle runs at Gigafactory Texas are also set to begin soon. What it represents is the physical infrastructure behind a fleet that Tesla intends to run without anyone cleaning, driving, or dispatching it by hand.
News
SpaceX reveals Starship Flight 13 launch date
SpaceX is preparing for the 13th integrated flight test of its Starship system, with a targeted launch as early as Thursday, July 16. The 90-minute launch window opens at 5:45 p.m. CT from Starbase in South Texas.
This comes roughly seven weeks after Flight 12 on May 22, underscoring the company’s accelerating pace in its rapid development campaign. The mission will use the latest Starship and Super Heavy V3 vehicles equipped with Raptor 3 engines. Booster 20 will attempt a controlled boostback burn, followed by a splashdown in the Gulf of Mexico, while Ship 40 will follow a suborbital trajectory.
Starship’s thirteenth flight test is preparing to launch as early as Thursday, July 16 → https://t.co/Rp7VwBzpWx pic.twitter.com/jdpFlQUEpF
— SpaceX (@SpaceX) July 11, 2026
Key objectives for Flight 13 will include demonstrating reliable stage separation, engine performance under various conditions, and controlled reentry.
A major milestone for Flight 13 is the first deployment of 20 next-generation Starlink V3 satellites. These satellites feature advanced laser links for inter-satellite communication, deployable solar arrays, and onboard cameras, six of which will capture imagery of Starship’s heat shield during flight.
Several heat shield tiles on Ship 40 will be painted white to serve as imaging targets, while additional experiments test upgraded tiles on aft flaps, modified attachments on the aft skirt, and load-sensing tiles to measure stresses. The upper stage will also attempt a single Raptor engine relight in space before a targeted splashdown in the Indian Ocean.
These tests build directly on lessons from Flight 12, which introduced the V3 configuration but encountered issues including a booster flip anomaly during boostback and an engine-out event on the ship. Hardware and software modifications on Booster 20 and Ship 40 aim to improve engine relight reliability, startup sequencing, and overall robustness.
Next Starship launch aiming for Thursday https://t.co/SajPPd4pdb
— Elon Musk (@elonmusk) July 12, 2026
The short interval between Flights 12 and 13 highlights SpaceX’s iterative approach. Elon Musk has repeatedly emphasized that Starship launches will become “incredibly common” in the coming years.
The company envisions scaling to rates as high as one launch per hour within 4-5 years, potentially enabling thousands of flights annually. Such cadence is essential for Starship’s goals: establishing orbital refueling for lunar and Mars missions, deploying massive satellite constellations, and making life multiplanetary.
With each flight, Starship edges closer to full reusability and operational maturity. Success on July 16 would mark another step toward routine access to space and the ambitious vision of humanity becoming a spacefaring civilization.
News
Tesla shows rapid teardown of Model S and X lines, paving the way for Optimus at Fremont
Tesla shared a striking video showcasing the decommissioning of the original Model S and Model X assembly line at its Fremont Factory in Northern California. Completed in just 46 days, the teardown involved heavy machinery dismantling concrete pits, removing robotic arms and conveyors, and clearing the space for new production.
The post, captioned “End of an era,” captured both the end of a historic chapter and Tesla’s aggressive pivot toward its next major initiative, Optimus.
End of an era: Decommissioning the original Model S & X assembly line in just 46 days pic.twitter.com/kGEdfhl62h
— Tesla Manufacturing (@gigafactories) July 10, 2026
The decision to retire the Model S and Model X originated during Tesla’s Q4 2025 Earnings Call in late January 2026. CEO Elon Musk announced that production of the company’s flagship sedan and SUV would wind down by the end of Q2 2026, describing it as bringing the programs to an “honorable discharge.”
Custom orders ceased around early April 2026, with the final vehicles rolling off the line in early May. A special signature delivery ceremony on May 20 marked the emotional close for these vehicles, which had defined Tesla’s early success and luxury EV segment since the Model S launch in 2012.
The primary reason for tearing down the lines was to repurpose the valuable factory floor space for high-volume production of Tesla’s Optimus humanoid robot. Musk had indicated on Earnings Calls that the Fremont S/X line would be replaced by a dedicated Optimus manufacturing line targeting a capacity of one million units per year.
This move aligns with Tesla’s broader strategic shift from traditional vehicle manufacturing toward robotics and artificial intelligence, leveraging the company’s expertise in autonomy, AI training, and high-volume production.
Optimus, Tesla’s general-purpose humanoid robot, is designed to perform repetitive or dangerous tasks in factories, warehouses, and eventually homes. Powered by Tesla’s AI and Neural Networks, it aims to be a versatile, affordable platform. Production of Optimus Gen 3 is already underway in limited form at Fremont, with full-scale output on the converted line expected to begin in late July or August.
Tesla is targeting rapid scaling, with internal ambitions pointing toward tens or even hundreds of thousands of units annually by the end of 2026.
Longer-term, Tesla is constructing a much larger second-generation Optimus facility at Giga Texas, with potential capacity reaching millions of units per year. The company views Optimus as a transformative product that could eventually surpass its automotive business in scale and value, enabling widespread deployment of useful robots across industries. CEO Elon Musk has even predicted it would be the most popular product of all-time.
As one era closes at Fremont, another is rapidly taking shape.