Connect with us

Energy

Tesla’s Big Battery in South Australia just had its most impressive quarter yet

Tesla's 100 MW/129 MWh Powerpack system dubbed as the 'World's largest battery' in Jamestown, Australia.

Published

on

Revenues for Tesla’s big battery in South Australia, officially known as the Hornsdale Power Reserve, spiked 56% in the final quarter of 2019, thanks to an increase in the value of frequency and ancillary services in the region. This marks yet another milestone for Telsa’s Powerpack farm, emphasizing once more that grid-scale batteries are feasible.

French renewable energy developer Neoen’s 2019 revenue statement was recently released on February 19, and it showed a 14% rise in battery storage revenues for the entire year. Nearly all of the rise in Neoen’s revenues came from the 100MW/129MWh Hornsdale Power Reserve.

The big battery’s revenue jump in Q4 was somewhat expected, according to Renew Economy. The Tesla battery at Hornsdale pocketed $4 million of revenue in the fourth quarter according to the Australian Energy Market Operator’s most recent Quarterly Dynamics report. The report also highlighted a shift in focus toward energy storage, time-shifting, and energy arbitrage.

Neoen CEO Xavier Barbaro stated that the Hornsdale facility has been a “wonderful” success for his company and the South Australian grid as its power has provided a “valuable service” to those who are in need of energy.

Advertisement

“We keep proving that what we do with lithium-ion batteries is the right solution and a competitive one for the grid. We are asked often to inject electricity for FCAS. It has proven to be well placed in terms of merit order in Australia, and has dramatically reduced costs,” he added.

However, the impressive performance of the Big Battery in Q4 2019 may be overshadowed by its performance in Q1 2020. A series of wind farms are currently out of commission after a tornado pulled down main power lines in Victoria, Australia. This will effectively cause South Australia to become an “energy island” that will be responsible for supplying power to residents in the region for two weeks.

Allan O’Neil of Watt Clarity expects the two weeks of dependence on Victoria’s big batteries to result in an additional $45 million of revenue. At least half of this amount will likely be captured by Tesla’s Hornsdale battery.

Tesla’s 100MW battery in Hornsdale was installed in less than 100 days in 2017 after a public Twitter conversation between Elon Musk and Australian software tycoon Mike Cannon-Brookes. The Twitter conversation revealed the Tesla CEO’s willingness to put his money where his mouth is. “Tesla will get the system installed and working 100 days from contract signature or it is free. That serious enough for you,” Musk said. True to his words, the Powerpack Farm was established in less than 100 working days, and it was promptly deployed to help support the region’s grid.

Advertisement

 

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Energy

Tesla’s newest “Folding V4 Superchargers” are key to its most aggressive expansion yet

Tesla’s folding V4 Supercharger ships 33% more per truck, cuts deployment time and cost significantly.

Published

on

By

Tesla V4 Supercharger installation ramping in Europe

Tesla is rolling out a folding V4 Supercharger design, an engineering change that allows 33% more units to fit on a single delivery truck, cuts deployment time in half, and reduces overall installation cost by roughly 20%.

The folding mechanism addresses one of the least glamorous but most consequential bottlenecks in charging infrastructure: getting hardware from factory floor to job site efficiently. By collapsing the form factor for transit and unfolding into an operational configuration on arrival, the new design dramatically reduces the logistics overhead that has historically slowed Supercharger rollouts, particularly at large or remote sites where multiple units are needed simultaneously.

The timing aligns with a broader acceleration in Tesla’s network strategy. In March 2026, Tesla’s Gigafactory New York produced its final V3 Supercharger cabinet after more than seven years and 15,000 units, pivoting entirely to V4 cabinet production. The V4 cabinet itself is already a generational leap, delivering up to 500 kW per stall for passenger vehicles and up to 1.2 MW for the Tesla Semi, while supporting twice the stalls per cabinet at three times the power density of its predecessor. The folding transport innovation layers logistical efficiency on top of that technical foundation.

Tesla launches first ‘true’ East Coast V4 Supercharger: here’s what that means

Advertisement

Tesla Charging’s Director Max de Zegher, commenting on the V4 cabinet when it launched, captured the operational philosophy behind these changes: “Posts can peak up to 500kW for cars, but we need less than 1MW across 8 posts to deliver maximum power to cars 99% of the time.” The design philosophy has always been about maximizing real-world throughput, not just peak specs, and the folding transport upgrade extends that thinking into the supply chain itself.

Continue Reading

Elon Musk

Tesla’s $2.9 billion bet: Why Elon Musk is turning to China to build America’s solar future

Tesla looks to bring solar manufacturing to the US, with latest $2.9 billion bet to acquire Chinese solar equipment.

Published

on

By

Tesla is reportedly in talks to purchase $2.9 billion worth of solar manufacturing equipment from a group of Chinese suppliers, including Suzhou Maxwell Technologies, which is the world’s largest producer of screen-printing equipment used in solar cell production. According to Reuters sources, the equipment is expected to be delivered before autumn and shipped to Texas, where Tesla plans to anchor its next phase of domestic solar production.

The move is a direct extension of a vision Elon Musk has been building for months. At the World Economic Forum in Davos this past January, Musk announced that both Tesla and SpaceX were independently working to establish 100 gigawatts of annual solar manufacturing capacity inside the United States. Days later, on Tesla’s Q4 2025 earnings call, he made the ambition concrete: “We’re going to work toward getting 100 GW a year of solar cell production, integrating across the entire supply chain from raw materials all the way to finished solar panels.”

Job postings on Tesla’s website reflect that same target, with language explicitly calling for 100 GW of “solar manufacturing from raw materials on American soil before the end of 2028.”

Tesla job description for Staff Manufacturing Development Engineer, Solar Manufacturing

Tesla job listing for Staff Manufacturing Development Engineer, Solar Manufacturing

The urgency behind the latest solar manufacturing target is rooted in a set of rapidly emerging pressures related to AI and Tesla’s own energy business. U.S. power consumption hit its second consecutive record high in 2025 and is projected to climb further through 2026 and 2027, driven largely by the explosion in AI data centers and the broader electrification of transportation. Tesla’s own energy division, which produces the Megapack utility-scale battery storage system, has been growing rapidly, and solar supply is a critical companion component for the business to scale. Musk has argued that solar is not just a clean energy option but the only one that makes economic sense at the scale AI infrastructure demands.

Tesla lands in Texas for latest Megapack production facility

Advertisement

Ironically, the path to domestic solar independence currently runs through China. Sort of.

Despite Tesla’s stated push to localize its supply chain, mirrored recently by the company’s plan for a $4.3 billion LFP battery manufacturing partnership with LG Energy Solution in Michigan, Tesla still relies on China-based suppliers to keep its cost structure intact.

The $2.9 billion equipment deal underscores a tension Musk himself acknowledged at Davos: “Unfortunately, in the U.S. the tariff barriers for solar are extremely high and that makes the economics of deploying solar artificially high, because China makes almost all the solar.” Building the factory in America requires buying the machinery from the country Tesla is trying to reduce its dependence on.

Tesla named by U.S. Gov. in $4.3B battery deal for American-made cells

Advertisement

The regulatory pathway adds another layer of complexity. Suzhou Maxwell has been seeking export approval from China’s commerce ministry, and it remains unclear how quickly that clearance will come. Still, the market has already reacted, with shares in the Chinese firms reportedly involved in the talks surged more than 7% following the Reuters report that broke the story.

Whether Tesla can hit its 2028 target of 100GW of solar manufacturing remains an open question. Though that scale may seem staggering, especially in such a short timeframe, we know that Musk has a documented history of “always pulling it off” in the face of ambitious deadlines that may slip. But, rest assured – it’ll get done.

Continue Reading

Elon Musk

Tesla named by U.S. Gov. in $4.3B battery deal for American-made cells

What began as an open secret in the energy industry was confirmed by the U.S. Department of the Interior on Monday: Tesla is the buyer behind LG Energy Solution’s blockbuster $4.3 billion battery supply agreement.

Published

on

By

What began as an open secret in the energy industry is becoming more real after the U.S. Department of the Interior named Tesla as the stakeholder in the LG Energy Solution’s blockbuster $4.3 billion battery supply agreement.

Tesla and LG Energy Solution are expanding their partnership to build a LFP prismatic battery cell manufacturing facility in Lansing, Michigan, launching production in 2027. The announcement, made as part of the Indo-Pacific Energy Security Summit results, ends months of speculation.

“American-made cells will power Tesla’s Megapack 3 energy storage systems produced in Houston, creating a robust domestic battery supply chain.”, notes a press release on the U.S. Department of the Interior website.

Tesla starts hiring efforts for Texas Megafactory

Advertisement

Tesla has long utilized China’s Contemporary Amperex Technology Co. (CATL), the world’s largest LFP battery maker, as one of its primary suppliers. That relationship made financial sense for years, considering that Chinese LFP cells were cheap, abundant, and reliable. But with escalated tariffs on Chinese imports and an increasingly growing Tesla Energy business that’s particularly reliant on LFP cells for products including its Megapack battery storage units designed for utilities and large-scale commercial projects.

The announcement of a deepened partnership between LG Energy Solution and Tesla has strategic logic for both parties. For Tesla, it secures a tariff-compliant, domestically produced battery supply for its fast-growing energy division. LGES, now producing LFP batteries in Michigan, becomes the only major supplier currently scaling U.S. production, outpacing rivals like Samsung SDI and SK On. LG Energy Solution’s Lansing plant, formerly known as Ultium Cells 3, was previously operated as a joint venture with General Motors. LGES acquired GM’s stake in May 2025 and now fully owns the site, with a production capacity of 50 GWh per year. LG Energy said the contract includes options to extend the supply period by up to seven years and boost volumes based on further consultations.

For the broader industry, the ripple effects are significant. This deal signals that domestic battery manufacturing can be financially viable and not just aspirational. Utilities, energy developers, and rival automakers will take note as American-made LFP supply becomes a competitive reality rather than a distant promise.

For consumers, the benefits will take time but are real. A more resilient, U.S.-based supply chain means fewer price shocks from trade disputes, more stable Megapack availability for the grid storage projects that reduce electricity costs, and long-term downward pressure on energy storage prices as domestic production scales.

Advertisement

Deliveries are set to begin in 2027 and run through mid-2030, and as grid storage demand accelerates, reliable, US-made battery supply is no longer a future ambition. It is becoming a core requirement of the country’s energy strategy.

Continue Reading