Connect with us

Energy

Tesla Megapack batteries to crush anti-renewables FUD in Canada’s oil province

Tesla's Megapack as a utility grid. (Credit: Tesla)

Published

on

Tesla Megapack batteries are about to make a notable and symbolic impact in Canada’s fossil fuel province, with Calgary-based TransAlta Corp. expected to flip the switch on Alberta’s first utility-scale battery storage installation. Known as the WindCharger project, the initiative involves using Tesla Megapack batteries to store electricity from the nearby Summerview wind farm and discharge it to the grid as needed. 

The WindCharger project’s Tesla Megapack batteries are capable of distributing 10 MW and provide up to 20 MWh of storage capacity. The initiative cost about CAD 16 million to build, though it was also the recipient of a CAD 7.7-million grant from Emissions Reduction Alberta, which aims to determine if emerging sustainable technologies could be used on a commercial scale. 

According to executives from Alberta’s largest power generator, the WindCharger project has massive potential. If the Megapack batteries and wind farm combination proves successful, it could be a legitimate “game-changer” for the country’s power industry. It could even crush the long-standing criticism of renewables which argues that solar and wind are not viable because the systems are compromised when the sun is not shining or when the wind is not blowing. 

(Credit: @TransAlta/Twitter)

Quite remarkably, the Tesla Megapack batteries were installed rather quickly. Construction on the WindCharger project began this spring and the batteries are expected to go live later this month. This is quite impressive, especially considering the presence of the pandemic. John Kousinioris, TransAlta’s chief operating officer, expressed his optimism in a statement to The Vancouver Sun

“It is really cool. It was put together in a matter of months, in terms of construction. It was great when we saw the batteries coming up from Tesla and in place. It’s an opportunity for us to match storage and our renewable wind power generation. When the wind is blowing or prices are really low, what we will do is take power from the wind farm to actually charge up the batteries. We charge them up and wait until they’re needed from a value proposition, and then we discharge them,” he said. 

According to Sam Huntington, an associate director of energy storage with IHS Markit, battery storage projects like the WindCharger in Alberta are taking off as the energy industry leverages advancements currently being made in the electric vehicle sector. Amidst the rise of electric cars like Teslas, for example, battery prices continue to decline. These innovations could then be applied to grid storage installations. 

Advertisement
-->

“Grid batteries are really riding the coattails of the electric vehicle boom, so that is bringing costs way down and leading to a lot of innovation. We are about to hit this big boom and all these batteries will come on to the grid. We will learn a lot more about the economics of the projects,” Huntington said. 

In a way, the installation of Tesla Megapacks in Alberta is a symbolic win for renewables in the country. Apart from having the potential to crush anti-sustainability FUD, the batteries also mark the territory of sustainable solutions in a location that’s widely considered as Canada’s fossil fuel province. Alberta, after all, is Canada’s largest oil and natural gas producer, being home to a significant part of the country’s remaining conventional oil reserves and oil sands. 

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Cybertruck

Tesla updates Cybertruck owners about key Powershare feature

Published

on

Credit: Tesla

Tesla is updating Cybertruck owners on its timeline of a massive feature that has yet to ship: Powershare with Powerwall.

Powershare is a bidirectional charging feature exclusive to Cybertruck, which allows the vehicle’s battery to act as a portable power source for homes, appliances, tools, other EVs, and more. It was announced in late 2023 as part of Tesla’s push into vehicle-to-everything energy sharing, and acting as a giant portable charger is the main advantage, as it can provide backup power during outages.

Cybertruck’s Powershare system supports both vehicle-to-load (V2L) and vehicle-to-home (V2H), making it flexible and well-rounded for a variety of applications.

However, even though the feature was promised with Cybertruck, it has yet to be shipped to vehicles. Tesla communicated with owners through email recently regarding Powershare with Powerwall, which essentially has the pickup act as an extended battery.

Powerwall discharge would be prioritized before tapping into the truck’s larger pack.

However, Tesla is still working on getting the feature out to owners, an email said:

“We’re writing to let you know that the Powershare with Powerwall feature is still in development and is now scheduled for release in mid-2026. 

This new release date gives us additional time to design and test this feature, ensuring its ability to communicate and optimize energy sharing between your vehicle and many configurations and generations of Powerwall. We are also using this time to develop additional Powershare features that will help us continue to accelerate the world’s transition to sustainable energy.”

Owners have expressed some real disappointment in Tesla’s continuous delays in releasing the feature, as it was expected to be released by late 2024, but now has been pushed back several times to mid-2026, according to the email.

Foundation Series Cybertruck buyers paid extra, expecting the feature to be rolled out with their vehicle upon pickup.

Cybertruck’s Lead Engineer, Wes Morrill, even commented on the holdup:

He said that “it turned out to be much harder than anticipated to make powershare work seamlessly with existing Powerwalls through existing wall connectors. Two grid-forming devices need to negotiate who will form and who will follow, depending on the state of charge of each, and they need to do this without a network and through multiple generations of hardware, and test and validate this process through rigorous certifications to ensure grid safety.”

It’s nice to see the transparency, but it is justified for some Cybertruck owners to feel like they’ve been bait-and-switched.

Continue Reading

Energy

Tesla starts hiring efforts for Texas Megafactory

Tesla’s Brookshire site is expected to produce 10,000 Megapacks annually, equal to 40 gigawatt hours of energy storage.

Published

on

Tesla's Megapack Factory in Lathrop, CA (Credit: Tesla)

Tesla has officially begun hiring for its new $200 million Megafactory in Brookshire, Texas, a manufacturing hub expected to employ 1,500 people by 2028. The facility, which will build Tesla’s grid-scale Megapack batteries, is part of the company’s growing energy storage footprint. 

Tesla’s hiring efforts for the Texas Megafactory are hinted at by the job openings currently active on the company’s Careers website.

Tesla’s Texas Megafactory

Tesla’s Brookshire site is expected to produce 10,000 Megapacks annually, equal to 40 gigawatt hours of energy storage, similar to the Lathrop Megafactory in California. Tesla’s Careers website currently lists over 30 job openings for the site, from engineers, welders, and project managers. Each of the openings is listed for Brookshire, Texas.

The company has leased two buildings in Empire West Business Park, with over $194 million in combined property and equipment investment. Tesla’s agreement with Waller County includes a 60% property tax abatement, contingent on meeting employment benchmarks: 375 jobs by 2026, 750 by 2027, and 1,500 by 2028, as noted in a report from the Houston Business Journal. Tesla is required to employ at least 1,500 workers in the facility through the rest of the 10-year abatement period. 

Tesla’s clean energy boom

City officials have stated that Tesla’s arrival marks a turning point for the Texas city, as it highlights a shift from logistics to advanced clean energy manufacturing. Ramiro Bautista from Brookshire’s economic development office, highlighted this in a comment to the Journal

Advertisement
-->

“(Tesla) has great-paying jobs. Not just that, but the advanced manufacturing (and) clean energy is coming to the area,” he said. “So it’s not just your normal logistics manufacturing. This is advanced manufacturing coming to this area, and this brings a different type of job and investment into the local economy.”

Continue Reading

Energy

Tesla and Samsung SDI in talks over new US battery storage deal: report

The update was related by industry sources and initially reported by South Korean news outlets.

Published

on

Credit: Tesla Megapack

Recent reports have suggested that Tesla and Samsung SDI are in talks over a potential partnership to supply batteries for large-scale energy storage systems (ESS). 

The update was related by industry sources and initially reported by South Korean news outlets. 

ESS batteries to be built at Samsung’s Indiana plant

As noted in a report from Korea JoongAng Daily, the demand for energy storage systems has been growing rapidly in North America, thanks in no small part to the surge in AI investments across numerous companies. With this in mind, Tesla has reportedly approached Samsung SDI about a potential battery supply deal.

The deal is reportedly worth over 3 trillion Korean won (approximately $2.11 billion) and will span three years, according to The Korea Global Economic Daily. A battery supply deal with Samsung SDI could make sense for Tesla as the company already has a grid-scale battery, the Megapack, which is perfect for industrial use. Samsung SDI could simply supply cells for the EV maker.

Production of the batteries would reportedly take place at Samsung SDI’s joint venture factory with Stellantis in Indiana, which is currently under construction. Samsung SDI recently announced plans to use part of that plant’s EV lines to produce cells for ESS, with a targeted capacity of 30 GWh by the end of next year.

Advertisement
-->

Tesla and Samsung’s partnership

At present, only a handful of manufacturers, including Korea’s LG Energy Solution, Samsung SDI, SK On, and Japan’s Panasonic, are capable of producing energy storage-scale batteries domestically in the United States. A Samsung SDI official issued a comment about the matter, stating, “Nothing has been finalized regarding cooperation with Tesla.”

The possible energy storage system deal adds another layer to Tesla’s growing collaboration with Samsung, which is already in line as a partner in the upcoming production of Tesla’s AI5 and AI6 chips. Early sample manufacturing of the AI6 is expected to begin in South Korea, with mass production slated for Samsung’s Texas-based Taylor foundry when it starts operations.

The AI6 chip will power Tesla’s next wave of high-volume projects, including the Optimus humanoid robot and the autonomous Cybercab service. Musk has called the partnership with Samsung a “real collaboration,” adding that he personally plans to “walk the line” at the Taylor facility to speed up progress.

Continue Reading