Connect with us

News

SpaceX Falcon 9 rocket goes vertical for 44th Starlink launch

Pictured here in 2020, Falcon 9 B1058 has gone vertical at Pad 39A for its 12th launch since May 2020. (SpaceX)

Published

on

A SpaceX Falcon 9 rocket has gone vertical at Kennedy Space Center Pad 39A ahead of the company’s 18th launch this year and 44th dedicated Starlink launch overall.

Known as Starlink 4-17, the mission will kick off up to four Starlink launches planned for May 2022. SpaceX has chosen Falcon 9 booster B1058 to launch the mission’s expendable upper stage, reusable fairing, and 53 Starlink V1.5 satellites into space, potentially making it the third Falcon booster to complete its 12th orbital-class launch in the last two months.

Barring delays, Falcon 9 will lift off with Starlink 4-17 as early as 5:42 am EDT on Friday, May 6th.

The mission is about as standard as Starlink launches come. Falcon 9 B1058 will lift off and burn for two and a half minutes before separating, flipping around, reentering Earth’s atmosphere, and landing around 634 kilometers (393 mi) downrange on drone ship A Shortfall Of Gravitas (ASOG) six minutes later. The payload fairing will split into halves and separate shortly after booster separation and eventually deploy parachutes for soft ocean landings and recovery. Falcon 9’s upper stage will reach a parking orbit about nine minutes after liftoff, reignite for just a second 45 minutes after liftoff, and deploy all 53 Starlink satellites 53 minutes after liftoff.

Starlink 4-17 will be SpaceX’s 43rd operational Starlink launch and 44th dedicated Starlink launch overall. The mission will raise the total number of Starlink satellites launched by SpaceX in the last three years to just shy of 2500 and the total number of working Starlink satellites in orbit above 2200. When SpaceX received its initial Starlink FCC license in March 2018, the company agreed to a deployment schedule that required half of the then 4425 satellites to be launched within six years and the full constellation within nine years of license receipt – March 2024 and March 2027, respectively.

SpaceX has far exceeded the pace required to meet that schedule. Instead, despite the fact that it took SpaceX 20 months after receiving its license to begin operational Starlink launches in November 2019, SpaceX will cross the halfway point on May 6th, 2022 – nearly two years faster than required. In fact, even without considering Starship’s potential impact, SpaceX’s growing launch cadence suggests that the company could finish its first 4408-satellite Starlink constellation by the FCC’s 50% deadline.

Advertisement
-

Finally, after Starlink 4-17, SpaceX should also have more than 700 working Starlink V1.5 satellites in orbit since launches began in September 2021. While hundreds of those satellites are still in transit to their final orbits, almost a third of all operational Starlink satellites will have optical inter-satellite links (laser links) once the Starlink V1.5 spacecraft already in orbit finish orbit-raising. Those laser links allow Starlink to connect aircraft, ships, and other moving or exceptionally remote vehicles or locations by routing communications through other Starlink satellites when no line-of-sight ground station is available.

Eric Ralph is Teslarati's senior spaceflight reporter and has been covering the industry in some capacity for almost half a decade, largely spurred in 2016 by a trip to Mexico to watch Elon Musk reveal SpaceX's plans for Mars in person. Aside from spreading interest and excitement about spaceflight far and wide, his primary goal is to cover humanity's ongoing efforts to expand beyond Earth to the Moon, Mars, and elsewhere.

Advertisement
Comments

Elon Musk

Tesla’s secretive “Project Crystal Sun” gets a big green light in Texas

Fort Bend County approved four incentive agreements Thursday for Tesla’s proposed $10.1 billion solar factory.

Published

on

By

Elon Musk stands in profile against a clear blue sky, with a bright overhead sun shining above a vast landscape of Tesla solar panels stretching to the horizon, and a smaller Texas flag flying on a pole to his right.

Fort Bend County commissioners on Thursday approved a package of tax incentives for Tesla’s proposed $10.1 billion solar cell factory near Needville, Texas, giving the company one of the last local approvals it needs before it decides where to build. All four Tesla agreements passed 4 to 0.

The votes covered a property tax abatement inside Reinvestment Zone No. 34, a Chapter 381 economic development agreement, a foreign trade zone non-objection paired with payments in lieu of certain taxes, and a separate payment in lieu of taxes “true up” agreement, according to agenda notes from the Fort Bend Commissioners Court meeting.

The project, known internally as “Project Crystal Sun,” would make solar cells and finished modules on roughly 3,000 acres near FM 762 and FM 1994, south of the Brazos River. As Teslarati reported when the filing first surfaced in August, Tesla’s application under the state’s JETI Act splits the investment into $1.5 billion in real property and $8.6 billion in equipment, with 9,712 permanent jobs projected by 2033 and commercial operations targeted for the first quarter of 2029. The plant would handle the full chain from ingot and wafer production through cell testing.

Inside Tesla’s secretive $10 Billion “Project Crystal Sun” filing

Thursday’s approval does not lock in the site. Tesla has told the Texas Comptroller it is still weighing other locations, and site selection adviser David Dennison told Lamar Consolidated ISD trustees in September that the race had narrowed to Fort Bend and one out of state rival with a “very compelling package,” according to the Houston Chronicle. Tesla hopes to decide before the end of 2026, and the incentives still need sign off from the Comptroller and the Governor’s office.

Local officials have now done nearly everything within their control. Commissioners created the reinvestment zone in an August 24 special meeting, with Interim County Judge Daniel Wong formally withdrawing himself over his engineering firm’s past work with Tesla. Lamar CISD trustees voted 7 to 0 on September 15 to advance a JETI agreement that would tax Tesla’s qualifying property at 50 percent of its value for maintenance and operations from 2029 through 2038.

The plant lines up with a target Elon Musk set on Tesla’s Q4 2025 earnings call in January, when he said the company would “work toward getting 100 GW a year of solar cell production, integrating across the entire supply chain from raw materials all the way to finished solar panels.” In March, Tesla was reported to be negotiating a $2.9 billion purchase of Chinese solar manufacturing equipment bound for Texas. The Houston area already hosts Tesla’s Megafactory in Brookshire, where Megapack 3 production has started. Tesla said on its Q3 call that Megapack supply for 2027 is nearly sold out, and Musk wrote on X Thursday that the company is “increasing production of Megapacks as much as possible,” as demand from data centers climbs.

Continue Reading

News

Tesla is building its own maps to fix Navigation issues

Published

on

Credit: Tesla

Tesla revealed plans to develop its own maps internally to fix Navigation issues and give owners more control over their routing.

On the company’s Q3 2026 Earnings Call, a question was asked about FSD Navigation issues, particularly speed limit recognition, parking, and routing. These are issues that surface from version to version and seem to be seriously challenging for Tesla’s AI team to resolve.

Tesla’s Head of AI, Ashok Elluswamy, said in response to the question:

“You’re totally right that we shouldn’t be depending on external people’s maps. So we are building our own maps, but not like the same way as OneMoreMap. We are building an entirely new architecture with essentially AI-based mapping and navigation.”

He continued:

“It’s going to be super awesome. It’s going to be integrated with voice. You can talk to it, ask for different routes. It’s going to learn your personalized preferences, plus the fleet preferences. The collective intelligence of all the cars is going to flow into making the maps and navigation super cool.”

Elluswamy said this issue should be confronted, and the mapping should be available for people by the time the v15 release starts deploying to customers.

“And over the next several months,” he added, “it’s just going to take over all of the navigation functions, parking, destination handling. And it will know you better than you know yourself in some regard for the driving task, and then handle it fully.”

Tesla Summon got insanely good in FSD v14.3.2 — Navigation? Not so much

Navigation is perhaps the most notable complaint with FSD, and although it has gotten better, it is still flawed. Much of the time, FSD will take people on routes that are not preferred by the driver, but Tesla tried to combat this with a routing feature in the Summer 2026 Update.

Tesla currently relies on Google for map data, but it is sort of counterintuitive to believe the company would rely on a third party for this. These improvements will be welcome, as routing and navigation have been such a pain point for so many owners for so long.

Quotes via Motley Fool

Continue Reading

Elon Musk

Tesla buyers are buying for Full Self-Driving and not for the car, data shows

Published

on

(Credit: Tesla)

Tesla Full Self-Driving (Supervised) showed a record attach rate at delivery for new vehicles in the third quarter of 2026.

75 percent of new vehicle deliveries in North America included a subscription to FSD software, up from 55 percent in the prior quarter, a 20-percentage-point sequential gain in the company’s most mature market.

Tesla Q3 2026 Earnings results: in-line revenues, slight beat on EPS

Tesla shed light on the Q3 Shareholder Deck that 75 percent of new deliveries came with an FSD subscription:

“FSD (Supervised)⁴ attach rate continued to grow, reaching over 75% of new vehicle deliveries in North America – our most mature market – a nearly twenty percentage point sequential increase. We believe that FSD is driving demand in markets where it is available, and we continue to work with regulators to get it approved in other markets. “

The higher attach rate accompanied strong growth in the overall FSD consumer base, as active subscriptions rose to 1.75 million, a 67 percent year-over-year increase. For the first time, more than half of paid customers are on the monthly subscription, which is priced at $99 per month in the U.S.

The transition to subscriptions has accelerated since Tesla discontinued the one-time purchase option in most markets earlier this year. The recurring model improves revenue visibility and margins compared with large upfront payments. With three-quarters of North American deliveries now including FSD, the software is now an evidently large contributor to Tesla’s economics and ancillary revenue.

Geographic expansion remains important for further gains. FSD is now available in nine countries in the EU, and more than 100,000 customers have driven over 160 million kilometers. Tesla is pursuing broader EU-wide approval, with a related vote expected in December. Similar progress in additional markets could support higher attach rates beyond North America.

These results came as Tesla had a strong quarterly delivery performance of 486,532 vehicles in the quarter, which came with its largest passenger-vehicle backlog in four years. Battery supply continued to limit volume, but the company has pointed to FSD as a clear difference-maker that is helping sustain demand. As supervised capabilities improve, the attach rate will likely continue to improve.

At face value, it is a key measure of how Tesla is converting sales into autonomy progress.

Continue Reading