News
Ford wins contract to supply USPS with E-Transit mail delivery vehicles
Ford E-Transit vehicles will be utilized by the United States Postal Service (USPS) for future sustainable mail delivery, the agency announced earlier this week.
The USPS awarded contracts for 9,250 new left-hand drive EVs and more than 14,000 charging stations that will be built and installed at facilities across the United States.
After research led the USPS to consider a variety of different EVs, it ultimately awarded a contract to purchase all 9,250 mail delivery EVs from Ford, opting for its E-Transit van, which has been one of the more dominant small commercial vehicles in the sector.
Ford’s E-Transit will hopefully join the USPS fleet in December, dependent on a successful Supplemental Environmental Impact Statement.
ALSO READ: FedEx launches Ford E-Transit pilot to last-mile delivery decarbonization
The use of E-Transit vehicles is just the next step in the USPS plan to revolutionize its vehicle fleet and make it more sustainable than ever. In December, it announced that over the next five years, 75 percent of newly acquired Next Generation Delivery Vehicles would be electric. After 2026, 100 percent of the NGDVs purchased will be fully electric.
By 2028, the USPS expects to have 66,230 fully electric vehicles, and it plans to purchase a total of 106,000 delivery vehicles in total by that time.
As far as the charging infrastructure, it will be a slow rollout and will start with installations at a minimum of 75 locations over the next year. Additional facilities will be equipped with EV charging infrastructure in the succeeding years, the USPS said.
The USPS has said in the past that it will install “tens of thousands” of EV charging stations across the United States by 2028.
“We are moving forward with our plans to simultaneously improve our service, reduce our cost, grow our revenue, and improve the working environment for our employees. Electrification of our vehicle fleet is now an important component of these initiatives,” Louis DeJoy, Postmaster General, said. “We have developed a strategy that mitigates both cost and risk of deployment – which enables execution on this initiative to begin now.”
The USPS is investing at least $9.6 billion to update its vehicle fleet, $3 billion of which is from funds made available through the Inflation Reduction Act (IRA). Many of its current vehicles are extremely outdated and offer relatively no modern features that could help mail carriers be more comfortable during their shifts.
I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.
Elon Musk
Elon Musk shares updated Starship V3 maiden launch target date
The comment was posted on Musk’s official account on social media platform X.
SpaceX CEO Elon Musk shared a brief Starship V3 update in a post on social media platform X, stating the next launch attempt of the spacecraft could take place in about four weeks.
The comment was posted on Musk’s official account on social media platform X.
Musk’s update suggests that Starship Flight 12 could target a launch around early April, though the schedule will depend on several remaining milestones at SpaceX’s Starbase launch facility in Texas.
Among the key steps is testing and certification of the site’s new launch tower, launch mount, and tank farm systems. These upgrades will support the next generation of Starship vehicles.
Booster 19 is expected to roll to the launch site and be placed on the launch mount before returning to the production facility to receive its 33 Raptor engines. The booster would then return for a static fire test, which could mark the first time a Super Heavy booster equipped with Raptor V3 engines is fired on the pad.
Ship 39 is expected to undergo a similar preparation process. The vehicle will likely return to the production site to receive its six engines before heading to Massey’s test site for static fire testing.
Once both stages are prepared, the booster and ship will roll out to the launch site for the first full stack of a V3 Super Heavy and V3 Starship. A full wet dress rehearsal is expected to follow before any launch attempt.
Elon Musk has previously shared how SpaceX plans to eventually recover Starship’s upper stage using the launch tower’s robotic arms. Musk noted that the company will only attempt to catch the Starship spacecraft after two successful soft landings in the ocean. The approach is intended to reduce risk before attempting a recovery over land.
“Should note that SpaceX will only try to catch the ship with the tower after two perfect soft landings in the ocean. The risk of the ship breaking up over land needs to be very low,” Musk wrote in a post on X.
Such a milestone would represent a major step toward the full reuse of the Starship system, which remains a central goal for SpaceX’s long-term launch strategy.
News
Tesla opens first public Tesla Semi Megacharger site in Los Angeles
The development was highlighted in a post on social media platform X by the official Tesla Semi account.
Tesla has opened its first public Tesla Semi Megacharger site in Los Angeles. The station reportedly offers up to 750 kW charging speeds and is open to Tesla Semi customers.
The development was highlighted in a post on social media platform X by the official Tesla Semi account.
Tesla Semi Megachargers
The Los Angeles site seems to be the first public Tesla Semi Megacharger that is not located at a Tesla factory. It is also the third Megacharger site currently visible on Tesla’s map.
The Megacharger system is designed specifically for the Tesla Semi and is capable of delivering extremely high charging speeds to support long-haul trucking operations. Infrastructure such as this will likely play a key role in making the Semi competitive with diesel-powered transport trucks.
Tesla’s progress with the Semi has also drawn attention in recent days after Elon Musk biographer Ashlee Vance shared photos from inside the Tesla Semi factory near Giga Nevada. The images suggested that preparations for higher production volumes may be underway, hinting that a broader ramp of the Tesla Semi’s production indeed be approaching.
New deployment strategies
Tesla has continued expanding its broader charging network through several new strategies aimed at accelerating infrastructure deployment. One of these initiatives is the Supercharger for Business program, which allows third parties to purchase Tesla Supercharger equipment and deploy charging stations while still integrating with Tesla’s network.
The program recently marked a milestone in Alpharetta, Georgia, where the city deployed four 325 kW city-branded Superchargers near the Alpharetta Department of Public Safety on Old Milton Parkway. The chargers support the city’s Tesla Model Y police vehicles while also remaining accessible to the public.
As per a report from EVwire, the project was designed not only to support fleet charging but also to generate economic returns that could offset the city’s investment. Tesla’s Supercharger for Business program has already attracted several participants, including businesses and charging providers such as Suncoast Charging, Pie Safe bakery in Idaho, Francis Energy in Oklahoma, and Wawa convenience stores.
Elon Musk
The Boring Company’s Vegas Loop moves 82k riders during CONEXPO
The Loop’s feat was highlighted by The Boring Company in a post on its official account on social media platform X.
The Boring Company said its Vegas Loop system transported roughly 82,000 passengers during the recent CONEXPO-CON/AGG construction trade show in Las Vegas. The event was held at the Las Vegas Convention Center (LVCC) from March 3-7, 2026.
The Loop’s feat was highlighted by The Boring Company in a post on its official account on social media platform X.
CONEXPO-CON/AGG 2026
CONEXPO-CON/AGG is one of the largest construction trade shows in North America. This year’s event was quite impressive, attracting more than 140,000 construction professionals from 128 countries across the world.
Considering the number of this year’s attendees, the LVCC Loop seemed to have proven itself to be a very useful transportation solution. A video posted by The Boring Company on its official X account featured attendees expressing their enthusiasm for the underground transport system, with some stating that they would like to see similar tunnels across Las Vegas.
The LVCC Loop is only part of the greater Vegas Loop network, which is actively under construction.
New Vegas Loop extensions
One of the newest additions is a station at the Fontainebleau Las Vegas resort on the Strip. The station is located on level V-1 of the resort’s south valet area, according to a report from the Las Vegas Review-Journal. From the Fontainebleau, passengers can travel free of charge to stations serving the Las Vegas Convention Center, as well as to Loop stations at Encore and Westgate.
The system is also expanding beyond the Strip corridor. In December, The Boring Company began offering Vegas Loop rides to and from Harry Reid International Airport. These trips include a limited above-ground segment after receiving approval from the Nevada Transportation Authority to allow surface street travel tied to Loop operations.
The Boring Company President Steve Davis previously told the Review-Journal that the University Center Loop segment, which is currently under construction, is expected to open in the first quarter of 2026. The extension would allow Loop vehicles to travel beneath Paradise Road between the convention center and the airport, with a planned station just north of Tropicana Avenue.