Connect with us

News

SpaceX Tests Falcon Heavy Transporter Erector, Plans Brownsville Launch Site

SpaceX is finishing up work on Launch Area 39A in Florida, where it will launch its first Falcon Heavy rocket in 2017. It is also continuing work on its commercial launch facility in Brownsville, Texas.

Published

on

SpaceX is finishing up renovations at Launch Complex 39A, the former shuttle and Apollo launch pad at NASA’s Kennedy Space Center that the company is leasing. SpaceX intends to use that location for its Falcon Heavy rocket that will be a critical part of manned missions to the International Space Station. Those flights are scheduled to begin in late 2017. “We have completed and activated Launch Complex 39A,” SpaceX president Gwynne Shotwell says.

As part of the preparations for Falcon Heavy missions, SpaceX is testing the 212 foot high Transporter Erector (TE) that is used to move launch ready rockets and spacecraft from the processing hangar near the base of the pad and lift them into a vertical position over the flame trench. It is much larger and stronger than the transport erector used at Launch Site 40, where the regular Falcon 9 rockets begin their space flights.

The TE, as it is called, will be raised and lowered at the launch site to make certain it is fully functioning and can perform its role as an essential part of future International Space Station missions. Once the rocket is in position on the launch pad, the TE will lift the Crew Dragon spacecraft into position on top of the Falcon Heavy rocket.

Advertisement

Work continues to go forward on the commercial space launch facility SpaceX is building on the Gulf Coast in Brownsville, Texas. Construction there began in 2014 and has been slowed by poor soil stability at the site. As a result, the company has needed to do two years of what Shotwell calls “dirt work,” which means bringing in and compacting soil that is stable enough to support launch facilities.

“It’s a little more expensive than what we were originally planning, but it will be an important site for us,” Shotwell told Space News. Once completed it will alleviate congestion problems at the company’s other launch sites in Florida and California. Shotwell says the first launch from the Brownsville site should take place in 2017 or early 2018, though she expects SpaceX to increase rocket launches to every 2 to 3 weeks, starting this year.

More SpaceX News

Advertisement
Comments

Elon Musk

Tesla’s next-gen Optimus prototype with Grok revealed

The video shows a new Optimus prototype answering questions and taking some very robotic steps, evidently revealing that the next-generation version is in its early stages of development.

Published

on

Tesla’s next-generation Optimus robot with AI assistant Grok has been revealed in a new video shared on X.

Tesla CEO Elon Musk was with Salesforce CEO Marc Benioff last night, and it appears the frontman gave Benioff an exclusive look at some upcoming technology.

Tesla talks Semi ramp, Optimus, Robotaxi rollout, FSD with Wall Street firm

The video shows a new Optimus prototype answering questions and taking some very robotic steps, evidently revealing that the next-generation version is in its early stages of development. It features Grok for some additional utility, as it answered questions Benioff asked in the short video.

Here’s what was uploaded to X:

Advertisement

It appears that there are several big changes to this next-generation version of Optimus, some of which have been discussed by Musk and Tesla in the past.

The first is purely cosmetic, but the gold color that Optimus is wearing in this is a new and fresh look that we have not seen before.

Advertisement

Perhaps the most interesting change that is evident here is the hands, which are much more detailed than past versions of Optimus:

However, we’re not too sure that these are what will be released with the next-gen Optimus, because they don’t appear to be functional, and they are more reminiscent of mannequin hands than anything.

The hands on Optimus have been a significant part of the program, as they are among the most crucial pieces of equipment on a robot. It needs to be able to perform both delicate and more imposing tasks. Tesla has aimed for Optimus to be able to thread needles or play the piano.

It was one of the most discussed improvements the company mentioned in past comments regarding how it planned to improve from Gen 2 to this next version.

Musk mentioned regarding Optimus:

Advertisement

“Next-generation Optimus hand, which we have in prototype form, has actuators that have moved to the forearm, just like humans, and they operate the fingers through cables, just like human hands.”

Within Optimus lies a significant opportunity for Tesla to gain considerable strength in terms of market share and valuation.

If Tesla can efficiently develop and deploy the humanoid robot over the next several years, the company stands to gain, as companies will utilize it for tasks that require tedious labor.

Musk recently said Optimus will be a major contributor to Tesla’s valuation moving forward. He believes it will make up roughly 80 percent of the company’s value.

Advertisement
Continue Reading

Elon Musk

Tesla CEO Elon Musk to provide more details for Master Plan Part IV

Musk stated that he would be adding specifics to the plan in a later update.

Published

on

Credit: xAI/X

Tesla CEO Elon Musk will be adding more specifics to the recently-released Master Plan Part IV. Musk shared the update on social media platform X amidst conversations about the general nature of the Master Plan Part IV. 

In a conversation on X, Musk responded to a post from Tesla retail shareholder and bull Dave Lee, who observed that the currently released Master Plan Part IV could really just be the introduction to the real plan due to its absence of specifics.

Elon Musk responded, stating that he would be adding specifics to the plan in a later update. “Fair enough. Will add more specifics,” Musk wrote in his post.

Tesla has been following Elon Musk’s Master Plans for decades. The first Master Plan, released in 2006, outlined the company’s path from the original Tesla Roadster to the Model 3, as well as the first steps for Tesla Energy. Master Plan Part Deux, released in 2016, covered the ramp of Tesla Energy, the expansion of Tesla’s vehicle lineup, and the rollout of a Robotaxi service.

Master Plan Part 3 was more ambitious as it was generally an in-depth proposal for achieving a global sustainable entry economy by transitioning to electricity-powered vehicles, homes, and industry, which will, in turn, be powered by renewable energy sources like solar and wind. Master Plan Part 3 also included a five-step plan to accomplish this, allowing the world to transition to a fully electrified future. 

Advertisement

Master Plan Part IV, which was released a few days ago, focused on automation and artificial intelligence to achieve sustainable abundance. But while the first two Master Plans were very clear and specific and Master Plan Part 3 was very in-depth, Master Plan Part IV was quite general and vague in comparison. It was easy to tell that Optimus would play a big role in the pursuit of sustainable abundance, but apart from that, there were no specifics as to how Tesla intended to achieve its goals.

Fortunately, these specifics would be discussed by Musk in a later update to the plan.

Continue Reading

News

Tesla just had its best wholesale month this year in China

Tesla China’s wholesale figures include both vehicles that are sold domestically and exported abroad.

Published

on

Credit: Tesla China

Tesla China just had its best wholesale month this 2025 so far. In August, the electric vehicle maker sold 83,192 vehicles wholesale, a 22.55% increase compared to July 2025’s 67,886 units.

Tesla China’s wholesale figures are still down year-over-year, but the company’s momentum seems notable, especially with the arrival of the Model Y L.

August 2025 figures

As noted in a CNEV Post report, August 2025’s 83,192 wholesale figures are 4.04% less than the 86,697 units that were sold in the same period last year. It is, however, a 22.55% improvement from the previous month. From January to August, Tesla China sold 515,552 units wholesale, a 12.24% year-over-year decrease. 

It should be noted that Tesla China’s wholesale figures include both vehicles that are sold domestically and exported abroad. With this in mind, August’s results bode well for Tesla China, as it suggests that Gigafactory Shanghai is now hitting its pace with both its domestic deliveries and its exports. Giga Shanghai serves as Tesla’s primary vehicle export hub.

Model Y L factor

Tesla had a challenging first quarter this year, thanks in part to the changeover to the Model Y across the Fremont factory, Giga Texas, Giga Shanghai, and Giga Berlin-Brandenburg. This changeover resulted in low sales in the first quarter. Political controversies surrounding Elon Musk and violence against Tesla stores and vehicles in the first and second quarters in the United States and Europe did not help much either.

Advertisement

This Q3, however, Tesla seems to be hitting its stride, especially in China. The launch of the new Model Y L has allowed Tesla to compete in the six-seat, large SUV segment, a market that was previously closed to the standard Model Y. Reports have suggested that Tesla China has been seeing a lot of demand for the Model Y L, which should help the company achieve higher sales this quarter and the remaining months of the year.

Continue Reading

Trending