Connect with us

News

Massachusetts Legislation Would Add Perks For Electric Vehicle Owners

A bill in the Massachusetts legislator would expand access to HOV lanes to all electric car drivers, create designated parking spaces for EVs and allow cars parked illegally to be towed. As written, it applies only to battery electric cars.

Published

on

Electric car charger

Massachusetts offers a $2,500 rebate for new buyers of electric vehicles which could get even better. The Joint Committee on Transportation is working on a bill that would allow EV drivers to use the highway occupancy vehicles lanes on all state highways. In addition, it would increase access to charging stations in the state, and require information about charging power and compatibility of each station to be posted online.

Rep. Frank Smizik, who chairs the House Committee on Global Warming and Climate Change, tells Boston.com the measure is necessary to curtail carbon emissions in the state. He notes that the transportation sector is responsible for nearly 40% of all greenhouse gas emissions in Massachusetts. Private vehicles are responsible for the majority of those emissions.

“Electric vehicles have made enormous technological advancements over the past decade, and can now compete economically and functionally with traditional motor vehicles,” said Smizik. “Many in the legislature, including myself, recognize this and believe we can consider EVs in our emissions reductions strategy.”

“With decreased gas prices, a 10 percent increase in vehicle miles traveled over the last 20 years, and a carpool rate below the national average, we must address personal vehicle use directly as part of our transportation emissions reduction strategy,” said Rep. Smizik.

Rep. Smizik points out that the current version of the bill would only extend these benefits to battery electric vehicles like Teslas, not to other types of alternative fuel vehicles like plug-in hybrids and fuel cell vehicles. But he said he and other advocates are working to determine which types of vehicles “are most appropriate for this benefit.”

In 2014, Massachusetts, along with 7 other states, agreed to get 3.3 million zero emission vehicles on the road by 2025. The Bay State's share of that commitment is 300,000 vehicles. It has a long way to go to meet that goal. Smizik believes the proposed legislation will help Massachusetts reach its goal by expanding charging infrastructure for EVs and offering “no-cost incentives” like HOV lane access and designated parking spaces. “Massachusetts’ 2025 ZEV goal is an ambitious target which can be met with a concerted effort of the state and industry,” he says.

Photo credit: Oregon Dept. Of Transportation via Flickr/Creative Commons

"I write about technology and the coming zero emissions revolution."

Advertisement
Comments

Elon Musk

Elon Musk’s xAI celebrates nearly 3,000 headcount at Memphis site

The update came in a post from the xAI Memphis account on social media platform X.

Published

on

Credit: xAI Memphis

xAI has announced that it now employs nearly 3,000 people in Memphis, marking more than two years of local presence in the city amid the company’s supercomputing efforts. 

The update came in a post from the xAI Memphis account on social media platform X.

In a post on X, xAI’s Memphis branch stated it has been part of the community for over two years and now employs “almost 3,000 locally to help power Grok.” The post was accompanied by a photo of the xAI Memphis team posing for a rather fun selfie. 

“xAI is proud to be a member of the Memphis community for over two years. We now employ almost 3,000 locally to help power @Grok. From electricians to engineers, cooks to construction — we’re grateful for everyone on our team!” the xAI Memphis’ official X account wrote. 

Advertisement

xAI’s Memphis facilities are home to Grok’s foundational supercomputing infrastructure, including Colossus, a large-scale AI training cluster designed to support the company’s advanced models. The site, located in South Memphis, was announced in 2024 as the home of one of the world’s largest AI compute facilities.

The first phase of Colossus was built out in record time, reaching its initial 100,000 GPU operational status in just 122 days. Industry experts such as Nvidia CEO Jensen Huang noted that this was significantly faster than the typical 2-to-4-year timeline for similar projects.

xAI chose Memphis for its supercomputing operations because of the city’s central location, skilled workforce, and existing industrial infrastructure, as per the company’s statements about its commitment to the region. The initiative aims to create hundreds of permanent jobs, partner with local businesses, and contribute to economic and educational efforts across the area.

Colossus is intended to support a full training pipeline for Grok and future models, with xAI planning to scale the site to millions of GPUs.

Advertisement
Continue Reading

News

Ford embraces Tesla-style gigacastings and Cybertruck’s 48V architecture

Ford Motor Company’s next-generation electric vehicles will adopt technologies that were first commercialized by the Tesla Cybertruck.

Published

on

Credit: Tesla

Ford Motor Company’s next-generation electric vehicles will adopt technologies that were first commercialized by the Tesla Cybertruck, such as the brutalist all-electric pickup’s 48-volt electrical architecture and its gigacastings. 

The shift is expected to start with a roughly $30,000 small electric pickup that is expected to be released in 2027, which is part of Ford’s $5 billion investment in its new Universal EV platform, as noted in a CNBC report.

Ford confirmed that its upcoming EV platform will move away from the traditional 12-volt system long used across the auto industry. Instead, it will implement a 48-volt electrical architecture that draws power directly from the vehicle’s high-voltage battery.

Tesla was the first automaker to bring a 48-volt system to U.S. consumers with the Cybertruck in 2023. The architecture reduces wiring bulk, lowers weight, and improves electrical efficiency. It also allows power to be stepped down to 12 volts through new electronic control units when needed.

Alan Clarke, Ford’s executive director of advanced EV development and a former Tesla engineer, called 48-volt systems “the future of automotive” due to their lower costs and smaller wiring requirements. Ford stated that the wiring harness in its new pickup will be more than 4,000 feet shorter and 22 pounds lighter than that of its first-generation electric SUV.

Advertisement

Apart from the Cybertruck’s 48-volt architecture, Ford is also embracing Tesla-style gigacastings for its next-generation EVs. Ford stated that its upcoming electric vehicle will use just two major structural front and rear castings, compared with 146 comparable components in the current gas-powered Maverick.

Ford CEO Jim Farley has described the effort as a “bet” and a “Model T moment” for the company, arguing that system-level innovation is necessary to lower costs and compete globally. “At Ford, we took on the challenge many others have stopped doing. We’re taking the fight to our competition, including the Chinese,” Farley previously stated.

Advertisement
Continue Reading

Energy

Tesla meets Giga New York’s Buffalo job target amid political pressures

Giga New York reported more than 3,460 statewide jobs at the end of 2025, meeting the benchmark tied to its dollar-a-year lease.

Published

on

Credit: Tesla

Tesla has surpassed its job commitments at Giga New York in Buffalo, easing pressure from lawmakers who threatened the company with fines, subsidy clawbacks, and dealership license revocations last year. 

The company reported more than 3,460 statewide jobs at the end of 2025, meeting the benchmark tied to its dollar-a-year lease at the state-built facility.

As per an employment report reviewed by local media, Tesla employed 2,399 full-time workers at Gigafactory New York and 1,060 additional employees across the state at the end of 2025. Part-time roles pushed the total headcount of Tesla’s New York staff above the 3,460-job target.

The gains stemmed in part from a new Long Island service center, a Buffalo warehouse, and additional showrooms in White Plains and Staten Island. Tesla also said it has invested $350 million in supercomputing infrastructure at the site and has begun manufacturing solar panels.

Advertisement

Empire State Development CEO Hope Knight said the agency was “very happy” with Giga New York’s progress, as noted in a WXXI report. The current lease runs through 2029, and negotiations over updated terms have included potential adjustments to job requirements and future rent payments.

Some lawmakers remain skeptical, however. Assemblymember Pat Burke questioned whether the reported job figures have been fully verified. State Sen. Patricia Fahy has also continued to sponsor legislation that would revoke Tesla’s company-owned dealership licenses in New York. John Kaehny of Reinvent Albany has argued that the project has not delivered the manufacturing impact originally promised as well.

Knight, for her part, maintained that Empire State Development has been making the best of a difficult situation. 

“(Empire State Development) has tried to make the best of a very difficult situation. There hasn’t been another use that has come forward that would replace this one, and so to the extent that we’re in this place, the fact that 2,000 families at (Giga New York) are being supported through the activity of this employer. It’s the best that we can have happen,” the CEO noted. 

Advertisement
Continue Reading