Connect with us
Ford-uaw-tentative-agreement-uaw Ford-uaw-tentative-agreement-uaw

News

Ford exec says automaker has reached its limit with latest UAW offer

Credit: Ford Motor Co.

Published

on

Ford Motor Co. noted on Thursday that it has reached the limit of what it can offer the United Auto Workers (UAW) in a new labor contract. Despite this, the automaker remains hopeful that an agreement can be reached.

Ford has pushed a new offer to the UAW that features a number of benefits. These include raises totaling 23% for hourly workers, the reinstatement of cost-of-living adjustments, and a $21 starting wage for temporary workers. The new offer would also allow new hires to reach top wages in three years. 

Kumar Galhotra, president of Ford Blue, the company’s internal combustion engine (ICE) division, stated on Thursday that Ford’s most recent offer is the most that it can do. If Ford improves the offer further, the automaker would no longer be competitive. 

“We have reached our limit. We’ve actually stretched ourselves to get to this point… We’re open to moving some money around within the deal that might fit the union’s needs better. But broadly speaking, from an overall cost of the deal perspective, yes, we’re there,” Galhotra said. 

The UAW has been on strike against Ford, General Motors (GM), and Stellantis since September 15, which means that the protests are closing in on one month. On Wednesday, the union expanded the strike to Ford’s Kentucky Truck Plant, the automaker’s largest and most profitable factory which produces the F-Series Super Duty, the Ford Expedition, and the Lincoln Navigator. 

Galhotra noted that Ford officials were surprised by the UAW’s decision to strike the Kentucky Truck Plant, as noted in an Automotive News report. He also denied that Ford had told the UAW that it would be improving its proposal. He also stated that about 600 suppliers are connected to the Kentucky Truck Plant, so the UAW’s protest could end up having a ripple effect on about 100,000 workers.  

Advertisement
-

“Going further will hurt our ability to invest in the business like we need to invest… We know UAW leadership set out to wound Ford for months. But this goes way beyond just hitting Ford’s profits,” the executive said. 

Wells Fargo analyst Colin Langan noted that the UAW’s strike at Ford’s most profitable plant could hint that negotiations are approaching their conclusion. 

“UAW leadership likely needs to strike Ford’s most profitable plant to show the rank-and-file that they are extracting the most from the automaker. Consequently, we think this escalation is a sign that the UAW could be close to a contract proposal with Ford in the next 1-2 weeks,” the analyst said. 

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

News

SpaceX readies Starship Flight 14 for a historic journey into uncharted territory

SpaceX finished Starship’s Flight 14 rehearsal, clearing the way for its first orbital flight Monday.

Published

on

By

Sunrise at Starbase. Starship is stacked for opportunistic full-stack testing ahead of Flight 14 via SpaceX
Sunrise at Starbase. Starship is stacked for opportunistic full-stack testing ahead of Flight 14 via SpaceX

SpaceX has cleared one of the last hurdles before Starship’s first trip to orbit. The company posted on X Thursday afternoon that its launch rehearsal for Flight 14 was complete, keeping the mission on track for Monday, September 28. The launch window opens at 7:15 a.m. CT at Starbase, Texas, and runs for 75 minutes.

A wet dress rehearsal is essentially launch day without the launch. Crews fill Booster 21 and Ship 41 with thousands of tons of extremely cold propellant, run the countdown nearly to ignition, then drain everything back out. It lets engineers catch leaks or equipment problems before anything leaves the pad. SpaceX still needs a launch license from the FAA before the stack, which stands 407 feet tall, can fly.

Flight 14 matters because of where it is going. All 13 previous Starship flights followed a suborbital path, which works like throwing a ball extremely high and far: the vehicle reaches space, but it is always on a course that brings it back down within about an hour. This time, Ship 41 will perform a short engine firing called an orbital insertion burn roughly 25 minutes after liftoff, giving it enough speed to keep falling around Earth instead of back into it. SpaceX plans about six laps at an altitude near 275 kilometers (171 miles) over nearly 10 hours, as Teslarati detailed when the mission was first announced.


Getting into orbit also means Starship has to prove it can get back out. The ship must relight a single Raptor engine in space to slow down for reentry. SpaceX says it will only attempt the orbital insertion burn after flight controllers confirm the hardware needed for that return burn has enough backup, and its flight plan includes health checks that could shorten the mission to two or five orbits.

Flight 14 is also the first to put working satellites into service. Flight 13 carried 20 Starlink V3 satellites in July, but they came back down with the ship because that mission never reached orbit. This time, 26 V3 satellites are meant to stay up and join the constellation within a few weeks. Together they add about 26 terabits per second of network capacity, which SpaceX says is roughly 10 times what a single Falcon 9 launch of older V2 Mini satellites adds. Three of them carry cameras that will photograph Starship’s heat shield in orbit to check for tile damage before reentry.

The hardware has changed too. Ship 41 flies with extra fasteners on tiles in the most vulnerable areas, fixes for gaps where superheated plasma slipped behind tiles, and curved tiles designed to reduce heating between them. Two tiles recovered from Ship 40 will fly again, the first reuse of any part of a Starship heat shield. Booster 21 carries better engine filtering and new relight software after ice clogged three center engines on the previous booster, leaving only eight of 13 engines to restart for its landing burn.

Ship 41 is targeting a splashdown in the Pacific Ocean west of Chile, a new recovery zone after several Indian Ocean landings, while Booster 21 aims for the Gulf. Neither will be caught by the tower on this flight. Elon Musk said in August that a ship catch was likely “in a few months.”

Continue Reading

Elon Musk

Google just picked SpaceX for its first step into orbital AI

Google will launch its first Project Suncatcher AI satellite on SpaceX’s Transporter-18 rideshare next week.

Published

on

By

Google is about to put its own AI chips into orbit for the first time, and it is paying SpaceX to get them there.

The company said Thursday that the first in-orbit test of Project Suncatcher, its research effort to find out whether space can host large-scale AI computing, will fly next week on SpaceX’s Transporter-18 rideshare mission.

The satellite, called MVP, is about the size of a refrigerator and carries four of Google’s Tensor Processing Units, the same chips Google runs in its ground data centers. Google originally planned to launch two custom satellites in 2027, but chose to move faster by integrating its chips into a satellite.

MVP’s solar panels supply about one kilowatt of power, and Google will run Gemini models on the TPUs only in bursts of roughly 15 minutes before the chips shut down so the radiators can shed heat. In a blog post, Google said its Trillium TPUs survived vibration testing that mimicked sustained launch loads of up to 10g, with individual components seeing 50 to 100g, and handled a radiation dose greater than a five year mission would deliver.

SpaceX and Google mull massive partnership on Musk’s orbital data dream: report

Next week’s flight, slated for October 1, follows a relationship that became public in May, when Teslarati reported that Google was in talks with SpaceX for a launch deal tied to orbital data centers. Google also holds a stake of roughly 6% in SpaceX.

The two companies are chasing the same idea from very different starting points. SpaceX’s own orbital compute program is built around the AI1 satellite, a roughly 70 meter structure derived from Starlink V3 hardware that is designed for 150 kW of peak compute, about 150 times the power MVP will draw. Elon Musk has brushed off concerns about crowding orbit with those satellites, and SpaceX is building its Gigasat factory in Bastrop, Texas, to produce them, targeting an annualized rate of about 1 GW of space compute by the end of 2027.

Musk also posted on X on Thursday that “the amount of compute in space will obviously round up to 100% of all compute.”

Google has been more cautious in public. Its research estimates that launch prices need to fall below about $200 per kilogram before an orbital data center can compete with a ground facility on energy cost, a threshold the company believes could be reached around the mid 2030s. The Suncatcher team has said it expects the effort to remain a project rather than a product for years, which leaves the first real test of its hardware riding on a rocket from the company with the most aggressive timeline in the field.

Continue Reading

Elon Musk

Tesla Cybercab gets initial tie-in to localized, in-house cathode plant

Published

on

Credit: Tesla

Tesla has taken another concrete step toward owning its battery supply chain, and it’s doing so with what is perhaps the most important vehicle in its short-but-storied history.

On September 23, Tesla announced that it has officially built the first Cybercab with cathode material produced in-house at the company’s first cathode plant in the U.S., and the first in the U.S. overall.

Active cathode material is the most expensive piece of a lithium-ion battery cell, and it often accounts for more than a third of cell cost. For years, the industry sourced a majority of it from Asia, but Tesla’s decision to make it in the United States bodes well for the Cybercab project. This is the latest chapter in Tesla’s vertical integration strategy, which began in public at Battery Day in 2020.

At the Battery Day Event, Elon Musk said the company would build a North American cathode plant and overhaul the process to cut costs and waste, while also making some of the most powerful and long-lasting cells in the industry.

The Austin facility took years to appear. Tesla filed permits for “Project Cathode” in 2022 on land near Giga Texas. By mid-2022, the building frame was up and Tesla later invested hundreds of millions of dollars as part of a larger expansion of the Giga Texas plant. The company stated it was operating the first large-scale cathode production facility in North America to supplement 4680 cell production.

One month later, that material reached a finished Cybercab.

The timing of this breakthrough is monumental for the Cybercab program. As Tesla officially launched the first Cybercab rides to the public earlier this month, production of the ride-hailing-geared vehicle is moving forward on the planned S-curve that CEO Elon Musk told everyone to expect.

Nevertheless, packs of Cybercab units have been spotted throughout the United States, in an effort to potentially activate the fleet as soon as the company gains regulatory approval in various geographic areas.

On top of that, Tesla owning the cathode step and pairing it with its own in-house lithium from the Gulf Coast refinery shortens the supply chain that once stretched thousands of miles and subjects every pack to fewer external price shocks and geopolitical risks.

Tesla is not yet independent of all of its foreign suppliers, as some precursor metals come from mines and chemical plants. But the first in-house cathode Cybercab shows the company is closing the most expensive and most concentrated gap in its battery production efforts. For a vehicle like Cybercab to operate at a high utilization within the Robotaxi network, that control over cost is so crucial.

It is arguably as important as the software that drives it.

Continue Reading