Connect with us
ford dealer ford dealer

News

Ford announces major restructuring with EV profitability on the line

Ford F-150 Lightnings pickups (all series) on their way to customers across North America. (Due to high demand, the current model year is no longer available for retail order. Contact your dealer for more information).

Published

on

Ford has announced a new $1.5-$2 billion restructuring effort to help achieve EV profitability as soon as possible.

Ford has jumped out ahead of its traditional competitors in adopting, introducing, and developing electric vehicles. In turn, it has quickly become one of the strongest contenders for second place in EV sales. Now, as the Blue Oval looks to redouble its efforts and achieve EV profitability as fast as possible, it has introduced a new financial plan that will dramatically restructure the business in the coming months and years.

Ford announced the new restructuring plan as part of a filing with the SEC, in which the automaker stated that it expects to spend between $1.5 and $2 billion in its effort, though no timeline was provided for the funding. Specifically, Ford will be exiting unprofitable locations and cutting headcount, among other numerous changes it is implementing.

Ford first announced a sweeping set of changes to its business structure last year, which started with creating three business units, one for EVs, one for ICE vehicles, and one for commercial offerings. Since then, it has also announced plans to revamp its dealership network, which will involve a dramatic cut in headcount and switching to an online ordering system with little to no inventory held at dealership locations.

Advertisement

Besides these structural changes, Ford has also announced a new staffing structure, hoping to decrease costs and increase output across the board. Most notably, this plan will shift engineering talent to the United States and out of Asia and Europe. Moreover, Ford has exited unprofitable markets like India, allowing it to focus further on its best-performing regions.

Despite these hurdles and countless changes, Ford’s first-quarter financials exceeded investor expectations. The automaker reported Q1 revenue of $41.5 billion, earnings of $3.4 billion, and earnings per share (EPS) of $0.63. According to Barrons, this dramatically beat estimates of $39.2 billion in revenue, $2.5 billion in profits, and an EPS of $0.38.

With Ford taking such drastic action, especially compared to its rivals like General Motors and Stellantis, it is positioning itself well to be a leader in EVs very soon. Along with this quest toward profitability, hopefully, it can serve as a strong example of success for other automakers struggling to transition to EVs.

What do you think of the article? Do you have any comments, questions, or concerns? Shoot me an email at william@teslarati.com. You can also reach me on Twitter @WilliamWritin. If you have news tips, email us at tips@teslarati.com!

Advertisement

Will is an auto enthusiast, a gear head, and an EV enthusiast above all. From racing, to industry data, to the most advanced EV tech on earth, he now covers it at Teslarati.

Advertisement
Comments

Elon Musk

SpaceX just got pulled into the biggest Weapons Program in U.S. history

SpaceX joins the Golden Dome software group, deepening its role in America’s most expensive defense program.

Published

on

By

US Golden Dome space defense system (Concept render by Grok)

SpaceX has joined a nine-company group developing the core operating software for the Golden Dome, America’s next-generation missile defense system. According to a Bloomberg report, SpaceX is focused on integrating satellite communications for military operations and is working alongside eight other defense and artificial intelligence companies, including Anduril Industries, Palantir Technologies, and Aalyria Technologies, to build software connecting missile defense capabilities.

The Golden Dome concept dates back to President Trump’s 2024 campaign, and on January 27, 2025, he signed an executive order directing the U.S. Armed Forces to construct the system before the end of his term. The system is planned to employ a constellation of thousands of satellites equipped with interceptors, with data centers in space providing automated control through an AI network.

FCC accepts SpaceX filing for 1 million orbital data center plan

Space Force Gen. Michael Guetlein, director of the Golden Dome initiative, has described the software layer as a “glue layer” that would enable officers to manage and control radars, sensors, and missile batteries across services. The consortium is aiming to test the platform this summer.

Advertisement

Trump selected a design in May 2025 with a $175 billion price tag, expected to be operational by the end of his term in 2029, though the Congressional Budget Office projected the cost could reach $831 billion over two decades.

The Golden Dome role is only the latest in a string of military wins for SpaceX. As Teslarati reported, the U.S. Space Force awarded SpaceX a $178.5 million task order on April 1, 2026 to launch missile tracking satellites for the Space Development Agency, covering two Falcon 9 launches beginning in Q3 2027. That came on top of more than $22 billion in government contracts held by SpaceX as of 2024, per CEO Gwynne Shotwell, spanning NASA resupply missions, classified intelligence satellites through its Starshield program, and military broadband.

The accumulation of defense contracts, now including a seat at the table on the most expensive weapons program in U.S. history, positions SpaceX as the dominant infrastructure provider for American national security in space. With a SpaceX IPO still on the horizon, each new contract adds weight to what is already one of the most consequential companies in aerospace history, raising real questions about how much of America’s defense architecture will depend on a single private operator before it ever trades publicly.

Advertisement
Continue Reading

News

Tesla pulls back the curtain on Cybercab mass production

Tesla’s Cybercab drives itself off the Gigafactory Texas line in a striking new production video.

Published

on

By

Tesla Cybercab production units rolling off the factory line in Gigafactory Texas (Credit: Tesla)

Tesla has provided a first look from inside a production Cybercab as it drove itself off the assembly line at Gigafactory Texas. The video footage, posted on X, opens on the factory floor with robotic arms and assembly equipment visible through the Cybercab windshield, and follows the car through a branded tunnel marked “Cybercab”, before autonomously navigating itself to a holding lot.

The first Cybercab rolled off the Giga Texas production line on February 17, 2026, with Musk writing on X, “Congratulations to the Tesla team on making the first production Cybercab.” April marked the official shift to volume production. The Giga Texas line is being prepared to produce hundreds of units per week, with 60 units already spotted on the Gigafactory campus earlier this month.


The Cybercab was first revealed publicly at Tesla’s “We, Robot” event in October 2024 at Warner Bros. Studios in Burbank, California, where 20 pre-production units gave attendees rides around the studio lot. Musk said he believed the average operating cost would be around $0.20 per mile, and that buyers would be able to purchase one for under $30,000. The two-seat design is deliberate. Musk noted that 90 percent of miles driven involve one or two people, making a compact two-passenger vehicle the most efficient configuration for a fleet-scale robotaxi. Eliminating rear seats also removes complexity and cost, supporting that sub-$30,000 target.

Tesla’s annual production goal is 2 million Cybercabs per year once several factories reach full design capacity. The Cybercab has no steering wheel, no pedals, and relies entirely on Tesla’s vision-based FSD system. What the video shows is the first evidence of that system working not as a demo, but as a production reality, driving itself off the line and into the world.

Advertisement
Continue Reading

Elon Musk

Elon Musk talks Tesla Roadster’s future

Elon Musk confirmed the Roadster as Tesla’s last manually driven car, with a debut coming soon.

Published

on

By

Tesla Roadster driving along sunset cliff (Credit: Grok)

During Tesla’s Q1 2026 earnings call on April 22, Elon Musk made a brief but notable comment about the long-awaited next generation Roadster while describing Tesla’s future vehicle lineup. “Long term, the only manually driven car will be the new Tesla Roadster,” he said. “Speaking of which, we may be able to debut that in a month or so. It requires a lot of testing and validation before we can actually have a demo and not have something go wrong with the demo.”

That single statement is the entire Roadster update from yesterday’s call, and while it represents another timeline shift, it comes as no surprise with Tesla heads-down-at-work on the mass rollout of its Robotaxi service across US cities, and the industrial scale production of the humanoid Optimus.

The fact that Musk specifically framed the Roadster as the last manually driven Tesla is significant on its own. As the rest of the lineup moves toward full autonomy, the Roadster becomes something rare in the Tesla-sphere by keeping the driver in control. Driving enthusiasts who buy a $200,000 supercar are not doing so to be passengers. They want the physical connection to the road, the feel of acceleration under their own input, and the experience of controlling something with that level of performance. FSD, however capable it becomes, removes that entirely. The Roadster signals that Tesla understands this distinction and is building a car specifically for the people who consider driving itself the point.

Tesla isn’t joking about building Optimus at an industrial scale: Here we go

Advertisement

The specs for the Roadster Musk has teased over the years are genuinely unlike anything in production. The base model targets 0 to 60 mph in 1.9 seconds, a top speed above 250 mph, and up to 620 miles of range from a 200 kWh battery. The optional SpaceX package takes it further, rumored to add roughly ten cold gas thrusters operating at 10,000 psi, borrowed directly from Falcon 9 rocket technology. With thrusters, Musk has claimed 0 to 60 mph in as little as 1.1 seconds. In a 2021 Joe Rogan interview he went further, stating “I want it to hover. We got to figure out how to make it hover without killing people.” Tesla filed a patent for ground effect technology in August 2025, suggesting the hover concept has not been abandoned. The starting price remains $200,000, with the Founders Series requiring a $250,000 full deposit. Some reservation holders placed those deposits in 2017 and are approaching a full decade of waiting.

With production now targeted for 2027 or 2028 at the earliest, the Roadster remains Tesla’s most audacious promise and its longest-running delay. But if what Musk is testing lives up to even half of what he has described, the demo alone should be worth waiting for.

Continue Reading