Connect with us

News

General Motors’ new EVs could help double revenue, compete with industry leaders

(Credit: AutoGuide.com)

Published

on

General Motors has long talked about its plans to expand its lineup of electric vehicles, with plans to be fully electric by 2035. Today, the automaker detailed more plans for its expansion of EVs, including how it plans to double its revenue, enter the autonomous driving discussion, and what GM brands will be bringing new electric cars to the market.

While GM already has plans to invest $35 billion in electric cars in the next four years by 2025, it has to begin planning for a more broad game plan to compete with industry leaders, including Tesla. While Tesla has four all-electric models and a fifth on the way when the Cybertruck arrives late next year, it also has accumulated eight consecutive profitable quarters, has an expanding manufacturing capacity, and innovative executives, other brands, like Ford, are unveiling their second and third EVs with the F-150 Lightning and E-Transit van.

GM is slowly falling behind the pace, only offering the problematic Chevrolet Bolt EV currently, although it has plans to unveil the HUMMER EV in the coming months under the GMC brand.

The big picture for GM, according to CEO Mary Barra, is increasing revenue to $280 billion from its current levels of $140 billion annually. The company plans to do this through revenue in its new services, while operating and maintaining off of its current offerings, Barra said, according to an interview with CNBC. Electric vehicles and subscription-based services will be a main indicator of how much growth could be experienced in the initial days of its plan.

Advertisement

“Especially in the initial days, we see EVs being plus volume, so we see tremendous opportunity to grow from an EV perspective and then the subscription and services,” Barra said in the interview. She did not detail a specific plan of how GM plans to explicitly double its revenue but believes an expansion of its current lineup will provide the opportunity for financial growth.

General Motors secures supply for silicon carbide chips for its next-gen EVs

One of its biggest ideas for a leg up on the competition, which could be its main driver for revenue increases, is electric trucks. “Nobody is going to be able to touch us in the battery-electric truck space,” GM President Mark Reuss said. GM has its HUMMER EV coming out in several months, but it also confirmed on Wednesday it will have an electric Silverado which will be unveiled at CES in January. Additionally, it is planning for an all-electric Chevrolet crossover for around $30,000 that is in development. These two vehicles will be added to GM’s lineup of EVs, and could help the company attain 1 million EV sales globally by 2025.

GM also stated that a new “Ultra Cruse” hands-free driving system will be released in 2023. It will be capable of driving in 95% of scenarios and is more robust than its current Super Cruise driving system. GM said it will be available on more than two million miles of U.S. and Canadian roadways when it is released.

Advertisement

Don’t hesitate to contact us with tips! Email us at tips@teslarati.com, or you can email me directly at joey@teslarati.com.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Investor's Corner

Tesla unfolded its first European “folding Supercharger”

Tesla’s folding Supercharger just arrived in Europe and it changes how fast charging expands.

Published

on

By

Tesla’s Folding Unit Supercharger has officially landed in Europe, with the company teasing a new installation in its effort for a broader rollout targeting major motorway rest stops across the European continent in Q3 2026. The arrival marks a notable shift in how Tesla is thinking about network expansion, moving from hardware performance alone to engineering the logistics chain itself.

While Tesla did not reveal the exact location for the new folding Supercharger in Europe, the photo shared on X heavily suggests that this maybe somewhere in Norway. Historically, whenever Tesla rolls out an entirely new infrastructure architecture in Europe, whether it was the original Supercharger stalls years ago or these brand-new modular V4 “Folding Units”, Norway is almost always the designated launch pad because of its unmatched EV adoption rate and supportive infrastructure

The Folding Unit, introduced in March 2026, is a factory pre-assembled V4 charging station built on an industrial hinge system mounted to a heavy-duty concrete base. The entire assembly arrives on site ready to unfold and connect. Tesla confirmed the units feature telescopic light poles specifically designed for easy transportation and fast on-site deployment, a detail that signals how carefully the logistics chain has been engineered alongside the hardware itself. The design allows 33% more stalls per delivery truck, cuts installation time roughly in half, and reduces overall deployment costs by more than 20% compared to traditional installations.

Tesla’s newest “Folding V4 Superchargers” are key to its most aggressive expansion yet

Advertisement

Tesla also noted telescopic light poles which provide benefits over traditional Supercharger installations that require fixed-height poles that are awkward to ship, slow to position on site, and often require separate crews and equipment to erect before charging hardware can even be staged. By engineering poles that compress for transit and extend on arrival, Tesla has removed one of the quieter bottlenecks in the physical deployment process. Every hour saved on a light pole installation is an hour redirected toward getting stalls energized. At scale, across dozens of new sites per quarter, those hours add up to a meaningful acceleration in how quickly a location goes from approved permit to serving its first customer.

Each Folding Unit pairs a single V4 power cabinet with eight charging posts. The V4 cabinet delivers up to 500 kW per stall for passenger vehicles and up to 1.2 MW for the Tesla Semi, supporting twice the stalls per cabinet at three times the power density of its predecessor. Longer cables make every new station immediately usable by non-Tesla vehicles, a priority as Tesla continues opening its network to Ford, GM, Rivian, Hyundai, Stellantis, and others.

As Teslarati reported when the Folding Unit was first unveiled, Tesla’s Gigafactory New York produced its final V3 Supercharger cabinet in March 2026 after more than seven years and 15,000 units, completing a full pivot to V4 production. The European arrival of the folding design is the next chapter in that transition.

Faster and cheaper deployment means Tesla can justify building in markets and corridors that were previously too expensive to serve, filling the coverage gaps that have slowed EV adoption outside major urban centers.

Advertisement

Continue Reading

News

Tesla stuns with another FSD approval in Europe, its second in two days

Published

on

Tesla has stunned by gaining yet another approval for its Full Self-Driving suite in Europe, its second in two days and its fifth overall.

Belgium will be the latest country to allow Tesla owners to utilize FSD on public roads in Europe, joining a quickly growing list that started with the Netherlands, Lithuania, and Estonia.

On Tuesday, Denmark announced its approval of the FSD suite, which has now been followed by Belgium just one day later.

The country’s Minister of Mobility, Annick De Ridder, announced the approval on her X account, stating that she had just signed the approval of Tesla FSD. It now goes to the country’s homologation department for the last step of the approval process.

Advertisement

The Belgian approval is one of mighty importance because it truly shows how quickly countries in Europe could greenlight the FSD suite consecutively. Approvals are already coming in relatively quickly, which is a great sign.

Perhaps the next big development that could come from FSD approvals in Europe is an approval from a country like England, Italy, France, Spain, or Germany. It would be something to see how FSD would perform in a major European metro, such as London, Barcelona, Madrid, Paris, Rome, or Berlin.

Advertisement

Full Self-Driving does an excellent job of roaming around major U.S. cities like New York and Los Angeles, but other high-profile international cities of significance would truly mark a line in the sand for Tesla, which can simply enable any vehicle in its customer-owned fleet to run FSD with the correct approvals.

Advertisement
Continue Reading

Elon Musk

SpaceX’s Elon Musk relieves worries about orbital data centers

Published

on

Rendering of Elon Musk overlooking a Starship fleet (Credit: Grok)
Rendering of Elon Musk overlooking a Starship fleet (Credit: Grok)

SpaceX CEO Elon Musk recently confronted worries about orbital data centers and launching satellites in mass quantities in space, as some voiced concerns about crowding.

Musk’s SpaceX plans to combat the issue of needing data centers by launching them into space instead of taking up valuable real estate on Earth. It has been a major point of SpaceX’s future, including its looming IPO, which could be the largest ever.

In a recent interview filmed at SpaceX’s Starlink terminal factory in Bastrop, Texas, Elon Musk directly addressed concerns that deploying large numbers of AI satellites for orbital data centers could crowd Earth’s orbit. His message was straightforward and reassuring: space is vast beyond human intuition.

“Space is really big,” Musk said. “It’s not like space is gonna get crowded. Space is enormous. If you actually look at it relative to the Earth, the satellites are so tiny you can’t even see them.” He emphasized that even zooming in makes a satellite appear large, but from a planetary perspective, they are minuscule specks.

Advertisement

Musk pointed to SpaceX’s real-world experience operating roughly 10,000 Starlink satellites as evidence that large constellations can be managed safely. “We’ve got a pretty good idea of how to operate just really large constellations and do it safely,” he noted. SpaceX remains the only operator with meaningful experience at this scale, giving the company unique insight into tight orbital packing without compromising safety

Advertisement

The discussion highlighted SpaceX’s plans for “AI1” satellites—essentially orbiting racks of AI compute powered by massive solar arrays and cooled via radiative panels in space’s vacuum.

These satellites leverage proven Starlink V3 technology, making them simpler to design than communications satellites. A first-generation unit targets around 150 kW peak power, with a 70-meter wingspan for solar panels and radiators. Laser links will connect them to each other and the Starlink network, delivering low-latency access (on the order of a few milliseconds from low-Earth orbit).

FCC accepts SpaceX filing for 1 million orbital data center plan

Musk framed orbital data centers as a practical solution to Earth’s constraints on AI growth. Ground-based facilities face power shortages, water demands for cooling, and grid limitations. In space, constant sunlight (no day-night cycle), vacuum radiative cooling, and abundant solar energy offer clear advantages.

Advertisement

Production will ramp up at an expanded “Gigasat” factory in Bastrop, with solar manufacturing already underway and full AI satellite output expected at reasonable volume by the end of 2027. Starship’s rapid, high-volume launch capability, aiming for multiple flights per hour, will make massive deployment feasible.

Critics sometimes raise risks like space debris or Kessler syndrome, but Musk’s response underscores scale: even a million satellites would represent an imperceptible fraction of available orbital volume when viewed against Earth’s size. SpaceX’s automated collision avoidance and deorbiting designs for Starlink further mitigate concerns.

This vision ties into broader ambitions. Musk sees orbital AI compute as a step toward harnessing more of the Sun’s energy, advancing humanity on the Kardashev scale from a Type 0 civilization toward Type 1 and eventually Type 2. By moving power-hungry data centers off-planet, SpaceX aims to unlock orders-of-magnitude more compute while preserving Earth’s resources.

Musk’s comments should ease public anxiety. With proven operational expertise, incremental engineering, and the immensity of space itself, orbital data centers represent not overcrowding, but smart expansion into the final frontier.

Advertisement
Continue Reading