News
Musk says Tesla supercomputing center aiming for 130MW power this year
Tesla is currently in the process of building a huge supercomputing cluster at its Gigafactory Texas, and CEO Elon Musk this week highlighted how much power the training center will aim to use by this year and next.
In a post on X on Thursday, Musk said that the supercomputer center will be sized for around 130MW of power and cooling this year, before increasing to more than 500MW over the next 18 months. Musk also noted that half the chips used will be Tesla’s hardware, while the other half will be made up of Nvidia or other company’s hardware.
Sizing for ~130MW of power & cooling this year, but will increase to >500MW over next 18 months or so.
Aiming for about half Tesla AI hardware, half Nvidia/other.
Play to win or don’t play at all.
— Elon Musk (@elonmusk) June 20, 2024
The statement comes as many in the Tesla community have noticed the company nearing completion of its South factory expansion, which will house the massive training center. The site will require massive cooling needs, and many have pointed out the giant fans that will be used to help cool the training center in recent weeks.
In addition to the fans, the center will utilize four water tanks, huge underground water lines and a huge cooling infrastructure which is being built out on the building’s second floor.
You can see the massive cooling structure in the video below, as captured by drone operator and Giga Texas observer Joe Tegtmeyer on Friday.
Musk initially confirmed the supercomputing cluster last month, calling it a “super dense, water-cooled supercomputer cluster.”
Musk later estimated that Nvidia hardware would make up $3-$4 billion of Tesla’s AI-related expenditures this year, a total which he valued at around $10 billion. About half of the purchases will use Tesla’s own AI inference computer, as well as Dojo, according to Musk.
“Of the roughly $10B in AI-related expenditures I said Tesla would make this year, about half is internal, primarily the Tesla-designed AI inference computer and sensors present in all of our cars, plus Dojo,” Musk wrote. “For building the AI training superclusters, NVidia hardware is about 2/3 of the cost.”
Tesla Cybertruck escorts Boring Co’s Prufrock-3 tunnel boring machine in Giga Texas
What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send us tips at tips@teslarati.com.
News
Tesla gathers Cybercab fleet in Gigafactory Texas
Images and video of the Cybercab fleet were shared by longtime Giga Texas observer Joe Tegtmeyer in posts on social media platform X.
Tesla appears to be assembling a growing number of Cybercabs at Gigafactory Texas as preparations continue for the vehicle’s mass production. Recent footage shared online has shown over 30 Cybercabs being transported by trucks or staged near testing areas at the facility.
The images and video were shared by longtime Giga Texas observer and drone operator Joe Tegtmeyer in posts on social media platform X.
Interestingly enough, Tegtmeyer noted that many of the Cybercabs being loaded onto transport trucks were still equipped with steering wheels. This suggests that the vehicles are likely testing units rather than the final driverless configuration expected for the company’s Robotaxi service.
The vehicles could potentially be headed to testing sites across the United States as Tesla prepares to expand its Robotaxi fleet.
Additional footage captured at Gigafactory Texas also showed the Cybercab’s side and rear camera washer system operating as vehicles were being loaded onto transport trucks.
The growing number of Cybercabs at Giga Texas comes amidst the company’s announcement that the first production Cybercab has been produced at the facility. Full Cybercab production is expected to begin in April.
The vehicle is expected to play a central role in Tesla’s Robotaxi ambitions as the company looks to expand autonomous ride-hailing operations beyond its early deployments using Model Y vehicles.
Tesla has also linked Cybercab production to its proposed Unboxed manufacturing process, which assembles large vehicle modules separately before integrating them. The approach is intended to reduce production costs and accelerate output.
Musk has also noted that the Cybercab’s ramp will likely begin slowly due to the number of new components and manufacturing steps involved. However, he stated that once the process matures, Cybercab production could scale quickly.
Elon Musk
Elon Musk’s xAI, creator of Grok and Grokipedia, celebrates its third birthday
xAI Memphis highlighted several of its milestones over the years in its celebratory post.
Elon Musk’s artificial intelligence startup xAI has marked its third anniversary. The update was shared in a post from the xAI Memphis account on social media platform X.
xAI Memphis highlighted several of its milestones over the years in its celebratory post.
As per xAI, it has built three massive data centers in the city, launched a coherent cluster of 330,000 GBs, created over 3,000 jobs, and paid over $30 million in taxes to local communities.
xAI’s Memphis operation has become a key part of the company’s infrastructure as the company works to train and deploy its Grok artificial intelligence models. Elon Musk has been quite optimistic about Grok’s potential, noting in the past that the large language model might have a shot at achieving artificial general intelligence (AGI).
xAI’s Memphis’ crown jewel is its Colossus supercomputer cluster. The project was announced in 2024 and has since become the home of one of the world’s largest AI compute facilities. The first phase of Colossus reached its initial 100,000 GPU operational milestone in just 122 days, or just about four months.
Industry figures such as Nvidia CEO Jensen Huang have praised the facility, noting that projects of similar scale typically take two to four years to complete.
xAI has cited Memphis’ central location, skilled workforce, and industrial infrastructure as key reasons for selecting the city as the home of its AI training operations. The company has also emphasized plans to expand the site further as it scales compute capacity for Grok and future AI models.
News
Tesla Sweden’s Megapack Supercharger near Arlanda continues to aggravate IF Metall union
The charging site, located in Arlandastad outside Stockholm, appears to be operating despite ongoing union blockade measures tied to Tesla’s labor dispute in the country.
Tesla Sweden’s Megapack-powered Supercharger station near Arlanda Airport has continued to aggravate Swedish labor union IF Metall. The charging site, located in Arlandastad outside Stockholm, appears to be operating despite ongoing union blockade measures tied to Tesla’s labor dispute in the country.
Comments about the site were shared by IF Metall representatives in remarks to Swedish publication CarUp.
The Arlandastad location includes eight Tesla Superchargers powered by a Megapack battery system. Unlike traditional charging stations that rely on direct grid connections, the site uses a large battery installation to store electricity and power the chargers.
According to the Swedish publication, the setup allowed the station to come online despite sympathy measures from Sweden’s electricians’ union, which has attempted to prevent companies from cooperating with Tesla as part of the broader labor conflict.
IF Metall press manager Jesper Pettersson indicated that the union was not aware that the Superchargers had already been connected and activated.
“We do not know the details around this. But it is further proof of how Tesla systematically finds loopholes to circumvent the sympathy measures through active strikebreaking. Every time this happens it gives us reason to sharpen our conflict measures,” Pettersson said.
Union representatives also noted that the Megapack appears to be charged using electrical cables routed through nearby terrain, though the exact power source remains under review.
The Megapack-powered site has then prompted questions from Swedish labor unions about how electricity is being supplied to the system.
IF Metall has submitted a report to Sweden’s Energy Market Inspectorate asking the regulator to review whether the electricity supply arrangement complies with national regulations. The Megapack is reportedly charged using electricity from a local company, though the provider has not been publicly identified.
Peter Lydell, an ombudsman at IF Metall, previously stated that Swedish law limits electricity trading to companies with proper authorization.
“The legislation states that only companies that engage in electricity trading may supply electricity to other parties. You may not supply electricity without a permit, then you are engaging in illegal electricity trading. That is why we have reported this…
“This is about a company that helps Tesla circumvent the conflict measures that exist. It is clear that it is troublesome and it can also have consequences,” Lydell said.
IF Metall and Tesla Sweden’s conflict has been going on for over two years now.