News
Tesla Cybertruck already changing the road, beguiles CHP Buttonwillow
Back in February, Tesla CEO Elon Musk noted that the Cybertruck would effectively change the look of the roads. Musk’s statement may sound hyperbolic at the time, but with Cybertruck sightings being reported across the United States in recent weeks, it does appear that the CEO’s estimates might be accurate.
To state that the Cybertruck looks unique is an understatement. The vehicle is technically a pickup truck, and Tesla has maintained that it will be an excellent work vehicle, but it looks nothing like traditional pickups on the road. Its angular design and cold steel exterior make the Cybertruck look like it’s more suited for sci-fi movies than today’s cities.
Yet the Cybertruck is coming, and if the increasing frequency of the vehicle’s sightings is any indication, it would seem that deliveries of the all-electric pickup truck are about to begin in the coming months. This means that the Cybertruck will likely be a more common sight on US roads. And considering how unearthly it looks, some motorists might find themselves beguiled by the pickup truck. This was certainly the case with the California Highway Patrol (CHP).
In a post on its official Facebook account, the CHP Buttonwillow noted that officers were able to spot something strange while they were on patrol. While patrolling, one of the CHP Buttonwillow’s units sighted a number of car haulers transporting “some strange trucks.” The vehicles were traveling northbound on Interstate 5. “I wonder what they are?” the California Highway Patrol – Buttonwillow wrote in its post.
Responses to the CHP Buttonwillow’s post suggested that numerous users of the social media platform are generally familiar with the all-electric pickup truck. Interestingly enough, some commenters also noted that they were not aware the Cybertruck was actually making it to production, and that the vehicle was not canceled at all. Such sentiments are understandable, considering that previous reports have suggested that the Cybertruck was being canceled.
The wait for the Cybertruck has been quite long. Unveiled in late 2019, the Cybertruck was initially supposed to start deliveries in late 2020. Producing the vehicle turned out to be more challenging than expected, however, thanks in part to the fact that Giga Texas had to be built first. These challenges now seem to be over, however, so it might really just be a matter of time before the first consumer deliveries of the all-electric pickup truck begins.
Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads-up.
News
EVgo taps Tesla Superchargers for mass charging expansion
EVgo has tapped Tesla Superchargers for its most recent efforts to expand its charging presence in the United States, a move that seems logical based on the effectiveness of the automaker’s own infrastructure.
EVgo opened its first Supercharger site in Illinois, a 12-stall station near downtown Chicago at 3145 South Ashland Avenue in the Riverside Square & River’s Edge center, right beside a grocery store. This marks the start of the company’s plan to deploy hundreds of Supercharger stalls across the United States, primarily at grocery-anchored Regency Centers properties where drivers can shop, eat, or run errands while they charge.
We’ve opened our first EVgo Supercharger location in Illinois, marking the start of our plan to add hundreds of Supercharger stalls across the U.S.
Designed for both NACS and CCS vehicles with Magic Dock technology, these new sites help make fast charging more accessible and convenient for all EV drivers. Learn more: https://t.co/V92t5FDryQ
— EVgo Fast Charging Network (@evgonetwork) November 5, 2026
The new location uses Tesla’s Magic Dock technology so both NACS and CCS vehicles can plug in natively without drivers needing to carry their own adapters. Peak power reaches 325 kW at this site, with pricing set between $0.25 and $0.35 per kWh depending on the hour—the same rate for Tesla and non-Tesla drivers.
The stalls also appear in Tesla’s in-car navigation and Trip Planner, making them easy for Tesla owners to find and route to. Illinois has seen EV registrations rise nearly 60 percent over the past two years, and EVgo’s broader network has experienced more than 700 percent growth in charging demand over three years, so the timing fits the market’s trajectory.
Choosing Tesla hardware through the Supercharger for Business program turns out to have been a smart, practical move.
Tesla’s V4 stalls and cabinets deliver high, reliable power with a proven track record of strong uptime, while Magic Dock delivers true dual-standard compatibility in one package. Because the sites show up in Tesla’s navigation tools, EVgo instantly gains visibility among millions of existing Tesla drivers, which should raise utilization and help the company double its addressable market as more vehicles adopt NACS. EVgo still owns the stations and sets pricing, yet benefits from Tesla’s established hardware, longer cables, and operational support.
The result is faster, lower-risk infrastructure expansion that serves every EV driver—Tesla or otherwise—with convenient, high-power charging at everyday retail locations. For drivers, that means fewer adapters, more predictable stops, and a denser network just as electric vehicles become everyday transportation.
News
Tesla Giga Texas reportedly moves to 24/7 production
Tesla’s Austin Gigafactory is reportedly shifting to round-the-clock vehicle production through the end of 2026, according to longtime drone observer Joe Tegtmeyer.
In his November 2 update, Tegtmeyer, widely regarded as one of the most reliable independent sources on Giga Texas activity (we call him the Drone GOAT), stated that the plant has added a night shift, creating two 12-hour production shifts.
Tegtmeyer said in his video:
“Now, I do have some interesting news about that when it comes to the production schedule here at Giga Texas, and things are actually looking pretty good, especially when you think about what the demand is and the delivery numbers that they’re looking for and what they’re expecting. So, normally they have shifts Monday through Friday. It’s a day shift and it’s about 10 hours long or so, give or take. But now they’re on day and night shifts and they’re going to 12-hour days. So they’re going to be adding or they have another shift. They have 12 hours for both of them. In addition to that, the typical downtime that we’re going to be seeing around the holidays, specifically Thanksgiving and Christmas to the New Year time frame is actually changed. And we’re not going to see those big several day events where there is no production. At least that’s what the plan is right now. So, it’s really a great sign, I think, when we consider what they’ve done in the past and what production and the deliveries have been so far. So, maybe it’s shaping up to be a really strong quarter.”
Previously, General Assembly typically operated on a single roughly 10-hour day shift, Monday through Thursday or Friday. The new arrangement keeps General Assembly on its Monday-to-Thursday schedule while adding overnight capacity, and most other areas of the factory continue working the full week with some weekend activity.
Notably, the plant is also forgoing the multi-day shutdowns around Thanksgiving and the Christmas–New Year period that have occurred in prior years
Giga Texas currently builds the Model Y, the larger Model Y L, the Cybertruck, and the Cybercab robotaxi. Tesla has not confirmed the shift change or specified which lines will receive the extra output. Recent comments suggest Cybercab production has been constrained by the pace at which the Robotaxi fleet can absorb new vehicles, making the Model Y and Model Y L the more likely beneficiaries as the company works through order backlogs.
Tegtmeyer’s November 2 footage and commentary also highlighted broader site progress. Cortex 2 continues to expand, with additional compute coming online, a roughly 25 percent lengthening of the structure on the north end, and work on a third cooling plant.
The Boring Company tunnel site showed increased activity in the large launch pit, while the Advanced Technology Chip Fab (a SpaceX–Tesla joint R&D facility) continued steel superstructure and heavy truss installation, along with concrete pours.
The reported capacity increase arrives as Tesla aims for a strong fourth quarter following solid third-quarter results. While unconfirmed by the company, the information aligns with Tegtmeyer’s consistent track record of accurate on-site observations.
If Tesla makes the decision to sustain the all-day production plans, the dual 12-hour shifts would meaningfully raise weekly output potential at one of Tesla’s most important manufacturing hubs.
News
Tesla opens new “Cybaer” Engineering Center in Berlin
Tesla opened its Berlin Engineering Center, uniting four sites and 30 labs near Giga Berlin.
Tesla has opened a new engineering hub in Berlin, putting the teams that design and test its European parts about 30 minutes from the factory that builds them.
The Berlin Tesla Engineering Center, or BTEC, opened Wednesday in the Köpenick district. Tesla Europe said on X that the project went from permit to operational in under a year and consolidates four engineering sites and 30 labs onto a single campus. It is the company’s third hub of this kind, after Fremont and Shanghai.
“We’re combining materials, powertrain, vehicle engineering & validation under one roof, enabling a short feedback loop between development & ramp,” Tesla Europe wrote.
Berlin Tesla Engineering Center opens today From permit to operational in under a year, it brings 4 engineering sites onto 1 campus w/ 30 different labs in Köpenick, 30 minutes from Giga Berlin With our 3rd hub of this kind after Fremont & Shanghai, we’re combining materials, powertrain, vehicle engineering & validation under one roof – enabling a short feedback loop between development & ramp — Tesla Europe, Middle East & Africa (@teslaeurope) November 4, 2026
Tesla converted the former production halls of a cable factory for the site. About 250 engineers and technicians are starting there, most of them relocated from existing Tesla facilities such as Tilburg in the Netherlands. Tesla has already applied for approval of a second phase that would take the headcount to roughly 500, and it put the total investment at €100 million.
The labs cover battery cells, motors, materials and complete vehicles, and a large hall is set aside for safety testing of components, including airbags. During the opening, staff demonstrated a pedestrian leg impact test on the front of a Tesla using a catapult rig, Tagesspiegel reported. The center’s logo is a cubist Berlin bear that employees call the “Cybaer.”
Tesla said its Berlin design and engineering teams already contributed to the Model Y, Semi and Roadster, and that the work continues at BTEC. The center will handle technical problem solving for Giga Berlin in Grünheide while also developing and validating parts for vehicles built in China and the United States.
“We came here to stay,” BTEC head Brückner told dpa. “We serve all of Europe via Gigafactory Berlin-Brandenburg.” He said a site close to the plant was a priority, and that the old industrial building allowed Tesla to move quickly.
That proximity matters more now that Giga Berlin is growing again. In June, Tesla said it would raise Model Y output at the plant to 7,500 vehicles per week and hire 1,000 more workers after a record first quarter of more than 61,000 units. The factory recently built 7,000 Model Ys in a single week for the first time. Tesla also more than doubled the planned 4680 cell capacity at the site to 18 GWh per year in May, and has talked about eventually taking Grünheide to one million vehicles annually.
Sales are giving Tesla reason to invest. KBA data released the same day showed Tesla’s German registrations nearly quadrupled year over year in October to 2,932 units, bringing the total for the first ten months of 2026 to 47,742.